| − | + | * 24.5 million tons of liquefaction capacity was commissioned | |
==== Export Terminals ==== | ==== Export Terminals ==== | ||
# The 3rd train of [[Gorgon LNG Terminal]] started operations | # The 3rd train of [[Gorgon LNG Terminal]] started operations | ||
| + | # Train 9 of the [[Malaysia LNG Terminal]] | ||
# [[Malaysia Satu FLNG Terminal]] | # [[Malaysia Satu FLNG Terminal]] | ||
| + | # Trains 3 & 4 of the [[Sabine Pass LNG Terminal]] | ||
| + | # [[Wheatstone LNG Terminal]] | ||
| + | # Train one of the [[Yamal LNG Terminal]] | ||
| + | ==== Import Terminals ==== | ||
| − | + | # [[Boryeong LNG Terminal]] | |
| + | # [[Delimara Malta Floating LNG Terminal]] | ||
| + | # [[Dunkerque LNG Terminal]] | ||
| + | # [[Etki LNG Terminal]] | ||
| + | # [[Guangdong Yuedong LNG]] | ||
| + | # [[Map Ta Phut Thailand LNG Terminal]], expansion | ||
| + | # [[Pengerang Johur LNG Terminal]] | ||
| + | # [[Port Qasim Floating LNG Terminal]] | ||
| + | # [[Qidong LNG Terminal]] | ||
| + | # [[Singapore LNG Terminal]], expansion | ||
Latest revision as of 17:20, 26 June 2022
Introduction
- 24.5 million tons of liquefaction capacity was commissioned
Export Terminals
- The 3rd train of Gorgon LNG Terminal started operations
- Train 9 of the Malaysia LNG Terminal
- Malaysia Satu FLNG Terminal
- Trains 3 & 4 of the Sabine Pass LNG Terminal
- Wheatstone LNG Terminal
- Train one of the Yamal LNG Terminal