LNG Terminal Projects Completed in 2017
Jump to navigation
Jump to search
Introduction
- 24.5 million tons of liquefaction capacity was commissioned
Export Terminals
- The 3rd train of Gorgon LNG Terminal started operations
- Train 9 of the Malaysia LNG Terminal
- Malaysia Satu FLNG Terminal
- Trains 3 & 4 of the Sabine Pass LNG Terminal
- Wheatstone LNG Terminal
- Train one of the Yamal LNG Terminal