Difference between revisions of "Al Shaheen Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: Maersk Oil | * Operator: Maersk Oil | ||
* Country: Qatar | * Country: Qatar | ||
Line 9: | Line 9: | ||
* Production Volume: 300,000 barrels a day | * Production Volume: 300,000 barrels a day | ||
− | + | === Description === | |
* A large offshore oil field. Associated gas is piped to Qatar Petroleum onshore gas complexes | * A large offshore oil field. Associated gas is piped to Qatar Petroleum onshore gas complexes | ||
* The FSO Africa and FSO Asia are used to store the crude oil | * The FSO Africa and FSO Asia are used to store the crude oil | ||
− | * | + | * '''Knock Nevis FSO''' was previously used prior to 2009 |
+ | * The phase three development project will add 100,000 bpd of capacity by 2027 | ||
− | + | === Contractors === | |
− | * | + | * '''Euronav:''' Supply of FSO Africa & Asia |
− | * | + | * '''Dubai DDW:''' FSO conversions |
* Hyundai Heavy Industries: | * Hyundai Heavy Industries: | ||
− | * | + | * '''Aker Solutions:''' |
** Installation of oil separation plant | ** Installation of oil separation plant | ||
** Offloading systems for the FSO's | ** Offloading systems for the FSO's | ||
− | * | + | * '''SLP Engineering:''' Package 12 (BF, CF, EF, GC Platforms and Bridges BC-BF, CC-CF, EC-EF) |
− | * | + | * '''Larsen & Toubro:''' |
** HB Flare Platform | ** HB Flare Platform | ||
** Two new offshore platform top-sides, a flare platform and interconnecting bridge | ** Two new offshore platform top-sides, a flare platform and interconnecting bridge | ||
− | * | + | * '''Seaway Heavy Lifting:''' |
** Installation HB Flare Platform | ** Installation HB Flare Platform | ||
** Installation of Package 12 (BF, CF, EF, GC Platforms and Bridges BC-BF, CC-CF, EC-EF) | ** Installation of Package 12 (BF, CF, EF, GC Platforms and Bridges BC-BF, CC-CF, EC-EF) | ||
− | + | ==== Phase 3 (Ruya) ==== | |
+ | * '''McDermott and Qingdao:''' EPC package for 9 wellhead platforms | ||
+ | * '''McDermott and Hyundai Heavy Industries:''' EPC package for a Central Processing Platform | ||
+ | * '''Larsen & Toubro:''' EPC package for a riser platform | ||
+ | * '''China Offshore Oil Engineering Co (COOEC):''' EPC package for subsea pipelines and cables | ||
+ | |||
+ | === History === | ||
* 1992 - Maersk Oil signed an Exploration & Production Sharing Agreement (EPSA) with Qatar Petroleum to develop the field | * 1992 - Maersk Oil signed an Exploration & Production Sharing Agreement (EPSA) with Qatar Petroleum to develop the field | ||
* 1994 - Oil production from the field commenced initially from temporary offshore facilities | * 1994 - Oil production from the field commenced initially from temporary offshore facilities | ||
Line 40: | Line 47: | ||
* 2010 - The field produces its 1 Billionth barrel of oil | * 2010 - The field produces its 1 Billionth barrel of oil | ||
* 2010 - Contract signed for FSO Africa | * 2010 - Contract signed for FSO Africa | ||
+ | * 2024 - Contracts awarded for phase 3 | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [[Aker Solutions Oil And Gas Processing References]] | # [[Aker Solutions Oil And Gas Processing References]] | ||
# [[Aker FPSO Pusnes Offloading Systems]] | # [[Aker FPSO Pusnes Offloading Systems]] | ||
Line 59: | Line 67: | ||
# [http://killajoules.wikidot.com/archive:fso-africa-contract FSO Africa contract] | # [http://killajoules.wikidot.com/archive:fso-africa-contract FSO Africa contract] | ||
# [http://cdm.unfccc.int/Projects/DB/DNV-CUK1162979371.3/view Al-Shaheen Oil Field Gas Recovery and Utilization Project] | # [http://cdm.unfccc.int/Projects/DB/DNV-CUK1162979371.3/view Al-Shaheen Oil Field Gas Recovery and Utilization Project] | ||
+ | # [https://a-barrel-full.blogspot.com/2024/01/qatarenergy-announces-award-of-6.html Qatarenergy Announces The Award Of $6 Billion EPC Contracts To Increase Oil Production By About 100,000 Bpd From Al-Shaheen Oil Field] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:Qatar]] | ||
+ | [[category:QatarEnergy]] |
Revision as of 07:46, 1 February 2024
Contents
Summary Information
- Operator: Maersk Oil
- Country: Qatar
- Location: Block 5, Offshore
- Production start: 1994
- Partners:
- Type: Oil: Al Shaheen Crude Oil
- Estimated Reserves:
- Production Volume: 300,000 barrels a day
Description
- A large offshore oil field. Associated gas is piped to Qatar Petroleum onshore gas complexes
- The FSO Africa and FSO Asia are used to store the crude oil
- Knock Nevis FSO was previously used prior to 2009
- The phase three development project will add 100,000 bpd of capacity by 2027
Contractors
- Euronav: Supply of FSO Africa & Asia
- Dubai DDW: FSO conversions
- Hyundai Heavy Industries:
- Aker Solutions:
- Installation of oil separation plant
- Offloading systems for the FSO's
- SLP Engineering: Package 12 (BF, CF, EF, GC Platforms and Bridges BC-BF, CC-CF, EC-EF)
- Larsen & Toubro:
- HB Flare Platform
- Two new offshore platform top-sides, a flare platform and interconnecting bridge
- Seaway Heavy Lifting:
- Installation HB Flare Platform
- Installation of Package 12 (BF, CF, EF, GC Platforms and Bridges BC-BF, CC-CF, EC-EF)
Phase 3 (Ruya)
- McDermott and Qingdao: EPC package for 9 wellhead platforms
- McDermott and Hyundai Heavy Industries: EPC package for a Central Processing Platform
- Larsen & Toubro: EPC package for a riser platform
- China Offshore Oil Engineering Co (COOEC): EPC package for subsea pipelines and cables
History
- 1992 - Maersk Oil signed an Exploration & Production Sharing Agreement (EPSA) with Qatar Petroleum to develop the field
- 1994 - Oil production from the field commenced initially from temporary offshore facilities
- 1998 - these were supplemented by permanent production facilities at three locations
- 2001 - New field development plan
- 2004 - The facilities were expanded with three additional platform locations
- 2005 - Qatar Petroleum and Maersk Oil Qatar Agree on Further Development
- 2006 - Al-Shaheen Oil Field Gas Recovery and Utilization Project launched
- 2010 - FSO Asia delivered
- 2010 - The field produces its 1 Billionth barrel of oil
- 2010 - Contract signed for FSO Africa
- 2024 - Contracts awarded for phase 3
Geology
Links
- Aker Solutions Oil And Gas Processing References
- Aker FPSO Pusnes Offloading Systems
- Jotun Platform References
- Seaway Heavy Lifting Oil And Gas References
- Hyundai Heavy Industries Platform References
- International Protective Coatings Floating Platform Referenc
- Bluewater Calm Buoy Mooring References
- Maersk Oil, Qatar
- Qatar Petroleum and Maersk Oil Qatar Agree on Further Development
- L&T wins order for largest export project
- Maersk Oil production in Qatar reaches billionth barrel
- Delivery FSO Asia
- FSO Africa contract
- Al-Shaheen Oil Field Gas Recovery and Utilization Project
- Qatarenergy Announces The Award Of $6 Billion EPC Contracts To Increase Oil Production By About 100,000 Bpd From Al-Shaheen Oil Field