Bluewater Calm Buoy Mooring References
Calm Buoy systems (Turret Buoys)
- Satah Al-Razboot SARB Oil Field
- UAE - Zirku Island
- ADMA-OPCO
- 28
- 320,000
- 2013
2013 PETROBRAS Tefran 25 80.000 – 120.000
2013 PETROBRAS Tefran 25 80.000 – 120.000
2013 PETROBRAS Tefran 25 80.000 – 120.000
2013 PDVSA TAECJAA Terminal, Venezuela 25 300,000
2013 PDVSA TAECJAA Terminal, Venezuela 28 300,000
2013 PETROBRAS Brazil, Campos Basin 70 350,000
2013 PETROBRAS Brazil, Campos Basin 70 350,000
2012 FAPCO Fujairah, UAE 40 50,000 – 150,000
2012 PDVSA VENEZUELA 16 80,000
2012 CPC Russia, Novorossiysk 58 15,000 - 300,000
2011 CAIRN ENERGY INDIA 28 120,000
2010 ECOPETROL COLUMBIA 25 350,000
2010 ECOPETROL COLUMBIA 35 350,000
2010 HPCL-INDIA VISAKHAPATNAM-INDIA 35 320,000
2009 BEDB MUKIM LIANG BRUNEI 25 46,000
2010 ADCOP - ABU DHABI, FUJAIRAH, UAE 35 320,000 UAE
2010 ADCOP - ABU DHABI, FUJAIRAH, UAE 52 320,000
UAE
2010 ADCOP - ABU DHABI, FUJAIRAH, UAE 54 320,000
UAE
12,000
2009 PETRONAS CARIGALI KIYANLI (KASPIAN SEA, 17
(TURKMENISTAN) SDN TURKMENISTAN)
- Seria Oil Field
- BRUNEI
- 25
- 85,000
- 2009
- 2009 ROMPETROL BLACK SEA 25 165,000
- Blacktip Gas Field
- AUSTRALIA
- ENI
- 27
- 350,000
- 2009
- Al Shaheen Oil Field
- QATAR - BLOCK 5
- MAERSK
- 60-63
- 500,000
- 2009
- Galeota Point Oil Terminal
- TRINIDAD AND TOBAGO
- BP
- 29
- 150,000
- 2008
2008 AL-KHAFJI JOINT AL-KHAFJI Terminal, Saudi 23 300,000 OPERATIONS (KJO) Arabia
2007 QATAR GAS RAS LAFFAN TERMINAL 37 320,000
2007 QATAR GAS RAS LAFFAN TERMINAL 37 320,000
- Thai Oil Refinery
- SRI-RACHA TERMINAL
- THAILAND
- 30
- 220,000
- 2007
- Kochi Refinery
- India
- Bharat Petroleum
- 30
- 300,000
- 2007
- Mubarraz Oil Field
- ABU DHABI
- ADOC
- 19
- 330,000
- 2006
2005 TPPI INDONESIA TUBAN AROMATIC PLANT, 50 185,000 INDONESIA
PEREMBA MELUT BASIN OIL
2005 DEVELOPMENT PROJECT, 55 300,000
CONSTRUCTION
SUDAN
2005 ADMA-OPCO DAS ISLAND, UAE 26 360,000
- La Libertad Refinery
- EQUADOR
- OXXO
- 15
- 45,000
- 2004
- Assaluyeh Gas Processing Plants
- IRAN
- SADRA GROUP
- 45
- 250,000
- 2004
- Angostura Gas Field
- TRINIDAD
- BHP BILLION
- 25
- 150,000
- 2004
2004 AGIP GAS B.V. WEST LIBYA/WAFA 26 30,000 - 80,000
2002 AMERADA HESS EQUATORIAL GUINEA / CEIBA 67 350,000
2002 VOPAK ENOC UNITED ARAB EMIRATES / 25 175,000 FUJAIRAH LTD. FUJAIRAH
2001 UNOCAL THAILAND / BIG OIL FIELD 74 120,000
2000 WOODSIDE ENERGY AUSTRALIA / LEGENDRE 49 90,000 - 120,000 LTD.
GREATER NILE SUDAN / MUGLAD BASIN
1999 PETROLEUM 54 40,000 – 300,000
DEVELOPMENT
OPERATING COMPANY
1998 GEORGIAN PIPELINE GEORGIA / CHIRAK 50 60,000 – 150,000
COMPANY
1998 ENRON INDIA / DABHOL POWER PLANT 19 60,000
1997 APACHE ENERGY AUSTRALIA / STAG 46 150,000
1997 VOLTA RIVER GHANA / TAKORADI 30 40,000 AUTHORITY
1996 FRED. OLSEN / SOUTH AFRICA / 118 128,000
SOEKOR SOEKOR E-BT
- Oleoducto Bicentenario Oil Pipeline
- COLOMBIA / COVENAS
- 28.8
- 50,000 – 160,000
- 1996
- FSO Erawan
- Erawan Gas Field
- THAILAND
- SOUTH CHINA SEA
- 67
- 150,000
- 1995
1993 TEXACO ANGOLA / BLOCK 2 35 175,000
1993 CORPOVEN (PDVSA) VENEZUELA /JOSE ORIMULSION 28 45,000 – 250,000
1992 CHEVRON NIUGINI PAPUA NEW GUINEA / KUTUBU 27 300,000
1989 MARATHON AUSTRALIA / TALISMAN 80 70,000 PETROLEUM
1986 OCCIDENTAL COLOMBIA / COVENAS 25 60,000 - 120,000 COLOMBIA
1985 KODECO / PERTAMINA INDONESIA / MADURA 28 120,000
1984 MOBIL INDONESIA / ARUN 59 40,000 - 280,000
1983 ELF GABON GABON / MAYUMBA 30 30,000 - 100,000
1980 ELF SEREPCA / CAMEROON / 30 250,000 SHELL OIL KOLE – RIO DE REY
1980 ELF GABON / GULF OIL GABON / MAYUMBA 30 70,000
++++ Calm Buoy systems (Deepwater)
- CLOV FPSO
- Angola
- Total E&P
- CRAVO, LIRIO, ORQUIDEA and VIOLETA (CLOV) oil fields located offshore in Angola (Block 17)
- Water Depth: 1260
- Capacity: 140,000 - 350,000
- 2013
++++ Calm Buoy systems (Turntable Buoys)
2008 KUWAIT OIL COMPANY KUWAIT OIL COMPANY (KOC) 25-30 300,000 (KOC) TERMINAL
2008 KUWAIT OIL COMPANY KUWAIT OIL COMPANY (KOC) 25-30 300,000
(KOC) TERMINAL
2005 SHELL NIGERIA BONNY TERMINAL, NIGERIA 36 350,000
2003 ZUEITINA OIL LIBYA/MARSA AL BREGA 32 275.000 COMPANY
2002 TOTAL FINA ELF E&P CONGO / DJENO 35 340,000
CONGO
1996 BRUNEI SHELL BRUNEI 25 20,000 - 350,000 PETROLEUM
1995 SHELL SARAWAK MALAYSIA / 20 100,000 - 350,000
BERHAD MLNG-2 PLANT
1993 ONGC INDIA / NEELAM 57 147,000
1991 SHELL EASTERN SINGAPORE / 35 150,000 - 350,000 PETROLEUM PULAU BUKOM
1988 SHELL GABON / GAMBA 23 50,000 - 150,000
1986 SHELL NIGERIA / BONNY 28 35,000 - 350,000
++++ CALM Buoy Wishbone systems for Permanent Mooring
- Covenas Oil Export Terminal
- Cano Limon Covenas Oil Pipeline - COLOMBIA
- OCCIDENTAL / ECOPETROL
- 390,000 DWT
- 35 Metres, water depth
- 1986
1985 MONTEDISON ITALY / MILA 50 70,000
1983 AMOCO GABON / INGUESSI 30 230,000
1982 PHILIPPINES CITIES PHILIPPINES / NIDO 73 55,000 SERVICE
++++ CALRAM Buoy systems for Permanent Mooring
1995 HAMILTON OIL LIVERPOOL BAY / DOUGLAS 30 116,500
1982 PHILLIPS PETROLEUM IVORY COAST / ESPOIR 87 240,000
- FSO Erawan
- Erawan Gas Field
- THAILAND
- SOUTH CHINA SEA
- 68
- 85,000
- 1981