Hyundai Heavy Industries Platform References
- Replacement Of North Breasting Kung In Energy Co., Ltd.,
- Korea
- Jacket : 1 Ea, Pile : 9 Ea X Od18”~ 36” Pc
- Jul. 1976 - Oct. 1976
- Dolphin Total : 450 M/T
- Yanbu Ngl Tanker Terminal
- Saudi Arabia
- Arabian American Oil Co., Ltd.,
- Jacket : 15 Ea, Module : 2 Ea Pci Pile : 193 Ea X Od36” Total : 24,000 M/T
- Jan. 1979 - Mar. 1982
- Yeosu Lng Tanker Terminal Honam Oil Refinery Co., Ltd.,
- Korea
- Jacket : 12 Ea, Pile : 55 Ea X Od36” Pcti Nov. Loading Arm : 5 Ea, Total : 4,760 M/T
- 1979 - Dec. 1980
- North Rankin “A” Platform
- Australia
- Woodside Offshore Petroleum Pty., Ltd.,
- Pile (24 Ea X Od53” X 154m) : 8,565 M/T PC Tubular
- May 1980 - May 1982,
- Bekok “C”/ Tapis “D”
- Malaysia
- Esso
- Platform, Jacket : 2 Ea Pile/Conductor : 321 Ea X Od24”~ 48”, Total : 10,780 M/T, PC
- Jun. 1980 - Jun. 1981
- Champion Oil Field
- Brunei
- Shell
- Development Of The Champion-7, Jacket : 6 Ea, Module : 8 Ea, Bridge : 9 Ea, Field Complex Pile : 90 Ea X Od24”~ 42”, Total : 14,227 M/T
- Oct. 1980 - Mar. 1982
- F23 Gas and Condensate Field
- Malaysia
- Shell
- Jacket : 3 Ea, Pile : 45 Ea X Od42”~ 54”, Total : 11,206 M/T, PCT
- Apr. 1981 - Oct. 1982
- Tiong Oil and Gas Field
- Malaysia
- Exxon
- Pumping Platform, Jacket : 3 Ea, Pile : 390 Ea X Od24”~ 48”, Tinggi “A” Jacket Structure Total : 14,320 M/T, PC
- May 1981 - May 1982
- F23 Gas and Condensate Field
- Malaysia
- Shell
- Module (3 Ea) : 3,279 M/T, PC
- Oct. 1981 - Oct. 1982
- Tiong Oil and Gas Field / Kepong “A”
- Malaysia
- Exxon
- Jacket : 2 Ea, Pile : 182 Ea X Od24”~ 60” PC, Facilities Total : 6,000 M/T
- Nov. 1981 - Sep. 1982
- Zuluf Oil Field
- Saudi Arabia
- Saudi Aramco
- Jacket : 10 Ea, Pile : 58 Ea X Od30”~ 42” Topside Module : 22 Ea, Bridge : 8 Ea, Total : 28,416 M/T, Epic
- Dec. 1981 - Jul. 1985
- Iwaki Gas Field
- Japan
- Exxon
- Conductor Pile (15 Ea X Od24”) : 1,200 M/T PC
- Feb. 1982 - Apr. 1983
- Irong Barat Oil Field
- Malaysia
- Esso
- Irong Barat “A” Jacket
- Apr. 1982 - May 1983
- Semangkok Oil Field
- Malaysia
- Esso
- Semankok “A” & “B” Jacket
- Apr. 1982 - May 1983
- Malaysia, Esso Pulai “B” Jacket Structures Pile/Conductor : 306 Ea X Od54”~ 60” Total : 17,740 M/T
- Mumbai High Oil Field
- India
- ONGC
- Water Injection Well Platforms - (Wi-2, 3, 4, 5) Total : 10,432 M/T
- Platform : 4 Ea, Pile : 16 Ea
- Epic
- May. 1982 - Apr. 1983
- Mumbai High Oil Field
- India
- ONGC
- Win Process Platform Facilities
- Jacket, Topside : 5ea, Pile : 4 Ea X 48” - Total : 10,000 M/T
- Epic
- Jun. 1982 - Mar. 1984
- 16 Peninsular Malaysia Offshore Petronas Caligali Sdn., Bhd., Malaysia Jacket (4 Ea) & Pile (16 Ea) : 5,588 M/T Pc Sep. 1982 - May 1983 Gas Project
- Marjan Oil Field
- Saudi Arabia
- Saudi Aramco
- Platform, Facilities Pile : 72 Ea X Od30”~ 48”, Bridge : 6 Ea, Total : 40,481 M/T
- Oct. 1982 - Nov. 1985
- 18 Ssb Eng 83/84 Marine Platform Sarawak Shell Berhad, Malaysia Platform : 3 Ea, Pile : 12 Ea X Od30”~ 42” Pc Jan. 1983 - Dec. 1984 Total : 2,936 M/T
- Satun and Platong Gas Field
- Thailand
- Union Oil Company
- Topside : 2 Ea, L/Q Deck : 2 Ea L/Q Building : 2 Ea, Bridge : 1 Ea Total : 8,930 M/T, EPC
- Jul. 1983 - Jan. 1985
- Harvest Gas Field
- U.S.A
- Texaco
- Harvest “A” Platform Topside
- Mod (8 Ea) : 7,282 M/T Pct
- Sep. 1983 - Jun. 1985
- Ssb Eng 208/82 Mini Production Sarawak Shell Berhad, Malaysia Topside (2 Ea) : 1,500 M/T Pc Oct. 1983 - Dec. 1984 Platforms
- Baram Delta Oil and Gas Fields
- Malaysia
- Sarawak Shell Berhad
- Ssb Eng 79/83 Marine Platform
- Siwa Jacket - Platform : 2 Ea, Pile : 7ea X Od30”~ 42” Pc
- Total : 1,359 M/T
- Oct. 1983 - Jun. 1984
- Mumbai High Oil Field
- India
- ONGC
- Phase-3 Of “Sh” Complex
- Platform : 2 Ea, Pile :12 Ea X Od60”
- Bridge, Pipeline : 62.8 Km
- Epic
- Total : 17,157 M/T
- Dec. 1983 - May 1985
- Mumbai High Oil Field
- India
- ONGC
- Phase-2 Of “Nq” Complex
- Jacket : 2 Ea, Pile : 12ea X Od54”
- Topside : 3 Ea, Bridge : 3 Ea
- Pipeline : 68.3 Km, Total : 12,248 M/T
- Epic
- Dec. 1983 - Apr. 1985
- 25 Ssb Marine Platform (Eng 79/82) Sarawak Shell Berhad, Malaysia Platform (2 Ea) : 6,631 M/T Pc Feb. 1984 - Mar. 1985
- East Zeit Oil Field
- Egypt
- Esso
- East Zeit Platform
- Platform & Pile : 5,873 M/T Pct
- Apr. 1984 - Feb. 1985
- F6 Gas Field
- Malaysia
- Sarawak Shell Berhad
- 55/83 F6-A Module
- Topside Module : 4 Ea, Bridge : 2 Ea, Total : 7,124 M/T
- Epic
- Aug. 1984 - Dec. 1986
- F6 Gas Field
- Malaysia
- Sarawak Shell Berhad
- (Eng 55/83 F6-A) Jacket & Pile
- Jacket : 2 Ea, Pile : 8 Ea, Total : 6,756 M/T
- Epic
- Aug. 1984 - Jun. 1985
- Bassein Oil and Gas Field
- India
- South Bassein Platform Complex
- Oil & Natural Gas Corporation Limited,
- Platform (4 Ea), Pile & Bridge : 20,989 M/T
- Epic
- Nov. 1984 - Mar. 1987
- San Miguel “Julius” Platform Cities Service Oil & Gas Co., U.S.A. Jacket : 61m X 87m X 157m, Topside : 9 Ea Pct Dec. 1984 - Nov. 1986 Pile & Conductor : 9,957 M/T Total : 41,123 M/T
- Bouri Oil and Gas Field
- Libya
- ENI
- Topside Module (9 Ea) : 10,230 M/T EPIC
- Feb. 1985 - Jun. 1987
- Santa Ynez Oil Fields
- U.S.A.
- Exxon
- Harmony Platform: 91.55m X 116.29m X 374.5m (H) - PC
- Heritage Platform: 84.4m X 109.4m X 331.5m (H) - PC
- Total : 72,100 M/T
- Jul. 1985 - Apr. 1988
- Lombo East Oil Field
- Angola
- Texaco
- Lombo East Development - Prospeccao Platform : 2 Ea, Pile : 32 Ea - Epic
- Other Deck : 3 Ea, Subsea Pipeline : 105 Km
- Total : 4,770 M/T
- Dec. 1985 - Mar. 1987
- Infill Well Platform (Ia,Ib,Id & Icd) Oil & Natural Gas Corporation Limited, India Platform : 4 Ea, Pile/Conductor : 37 Ea Epic Nov. 1986 - Dec. 1987 Total : 15,000 M/T
- Mumbai High Oil Field
- India
- ONGC
- Infill “Icp” Process Platform Complex
- Platform & Pile, L/Q Module : 5 Ea
- Bridge : 4 Ea, Misc. (Sbm/Plem/Buoy)
- Pipeline (13 Lines) : 100.45 Km
- Total : 20,913 M/T
- Epic
- Nov. 1986 - Feb. 1989
- Mumbai High Oil Field
- India
- ONGC
- Infill “Icw” Process Platform Complex
- Platform : 1 Ea, Pile : 12 Ea, Bridge : 2 Ea Epic
- Dec. 1986 - Feb. 1989
- Submarine P/L : 4.1 Km, Total : 11,700 M/T
- 37 Iraq Crude Oil Trans Saudi Arabia State Company Of Oil Project, Iraq Platform : 40 Ea, Pile : 224 Ea X Od36”~ 48” Epic Sep. 1987 - Sep. 1989 Project (Offshore Marine Terminal) Trestle Deck : 23 Ea, Bridge : 20 Ea Total : 50,754 M/T
- Takula Oil and Gas Field
- Angola
- Cabgoc
- Takula Water Injection Platform - 5 Ea, Pile : 20 Ea X Od30”~ 36” Pct
- Nov. 1987 - Jul. 1988
- Total : 4,869 M/T
- Santa Ynez Oil Fields
- Exxon Co.,
- U.S.A.
- Topside Structures - Topside Module (22 Ea) : 8,936 M/T
- PC
- Jan. 1988 - Jan. 1989
- Fabrication
- Heera Oil Field
- India
- Oil & Natural Gas Corporation Limited
- Process Platform Complex , Jacket : 3 Ea, Pile : 33 Ea, Module/Deck : 10 Ea, Bridge : 2 Ea, Misc. : 4 Ea, Pipeline (10lines, 6”~ 30”) : 20 Km, Total : 26,805 M/T,EPIC
- May 1988 - May 1990
- Iwafune-Oki Oil and Gas Field
- Japan
- Japex Offshore
- Iwafune-Oki Platform - Drilling / Production Module (4 Ea)
- 5,520 M/T
- Epct
- Mar 1989 - May 1990
- Goodwyn A Gas and Condensate Field
- Australia
- Woodside Petroleum
- Process Platform, Module : 4 Ea, Flare Tower : 1 Ea, Total : 10,784 M/T, PC
- Apr. 1990 - Jun. 1992
- Bp Riser Jacket British Petroleum, U.K. Jacket (40m X 20m X 143m) : 6,500 M/T Pc May 1991 - May 1992
- Safaniya Oil Field
- Saudi Arabia
- Saudi Arabian Oil Company
- Living Quarters Platform Accommodation : 140 Men, Living Quarter Module : 1,460 M/T Epct
- Jun. 1991 - Jun. 1993
- Brage Oil and Gas Field
- Norway
- Norsk Hydro / Ake Verdal
- Jacket Components: 11,458 M/T
- Dec. 1991 - May 1992
- Jhn Julius Platform Modification Jhn Oil Operating Co., China Modification Of Platform (9 Ea) : 2,592 M/T Pct Jan. 1992 - Jul. 1992
- Neelam Process Complex Oil & Natural Gas Corporation Limited, India Platform : 5 Ea, Bridge : 3 Ea, Epic Feb. 1992 - Apr. 1994 Pile, Bldg./Others Pipeline (9 Lines, 1.5 ~ 36”) : 132 Km Total : 49,500 M/T
- Nqp Process Complex Oil & Natural Gas Corporation Limited, India Platform : 2 Ea, Pile : 13 Ea X Od48”~ 72” Epic Mar. 1992 - Apr. 1994 Module : 4 Ea, Pipeline : 8 Lines, 4”~ 30” X 102 Km Total : 14,961 M/T
- L-Abcd&E Well Platform Complex Oil & Natural Gas Corporation Limited, India Platform : 5 Ea, Pile : 22 Ea X Od72” Epic Mar. 1992 - May 1993 Pipeline : 6 Lines, 4”~ 6” X 66 Km Total : 18,700 M/T
- Yacheng 13-1 Gas Field
- China
- Arco
- Wellhead Platform & Pile (Od72”~ 84”) : 6,276 M/T - CTI
- 1993 - Apr. 1994
- Hibernia Oil Field
- Canada
- The Hibernia Management and Development Company Ltd. (HMDC)
- Service & L/Q Module : 12,420 M/T PC
- Mar. 1993 - Mar. 1995
- Harding Oil Field
- U.K.
- BP
- Jack-Up Pdq Platform, Tpg-500 Triangular Leg (3 Ea) : 123m, EPC, Oil Production : 64,000 Bopd, Total : 23,300 M/T Accommodation : 84 Men
- Mar. 1993 - Jul. 1995
- Edop Oil Field
- Nigeria
- Mobil
- Gas Injection Platform, Jacket, Topside : 2 Ea, Pile : 8 Ea X 47” Bridge, Removal & Modification, Pipeline : 3.6 Km, Total : 6,000 M/TEpic
- Jun. 1994 - Jun. 1996
- Heera Oil Field
- India
- Oil & Natural Gas Corporation Limited
- Hx/Hy Wellhead Platform
- Platform (4 Ea) : 2,900 M/T
- Epic
- May 1996 - Dec. 1997
Offshore Pipeline : 6”~ 12” X 39.1 Km
- 55 B-121/119 Wellhead Platform Oil & Natural Gas Corporation Limited, India Platform : 1,000 M/T Epic Jun. 1996 - Jan. 1997
Offshore Pipeline : 12” X 36.7 Km
- Pinghu Oil and Gas Field
- China
- China National Offshore Oil Corp. (Cnooc)
- Offshore Platform Platform & Pile : 12,800 M/T EPIC
- Jun. 1996 - Jul. 1998
- South West Ampa Gas Field
- Brunei
- Shell
- Development Of Facilities For Amdp-30
- Platform & Pile, Conductor Pipeline : 3 Km, Power Cable : 3 Km, Total : 1,670 M/T
- Epic
- Jul. 1996 - Jun. 1997
- Mumbai High Oil Field
- India
- ONGC
- Booster Compressor Platform - A & B, Platform : 2 Ea, Piles, Module : 8 Ea, Living Quarter : 2 Ea, Bridge : 4 Ea,Total : 14,165 M/T, EPIC
- May 1997 - May 1999
- Weizhou 12-1 Oil Field
- China
- China National Offshore Oil Corp.
- Topside & Living Quarter : 5,630 M/T, Accommodation : 80 Men
- Construction (Cnooc), Epic
- Jul. 1997 - Mar. 1999
- Benchamas Oil and Gas Field
- Thailand
- Pogo Producing Co.
- Platform (2 Ea) & Bridge (2 Ea) : 8,350 M/T Epic
- Sep. 1997 - May 1999
- Bhn Revamp Platform - Operator : Ongc, India Living Quarter : 900 M/T Epic Oct. 1998 - Apr. 2000 Accommodation :104 Men - Contractor : Mdl
- South Natuna Sea Block B PSC Oil and Gas Fields
- Indonesia
- Conoco
- West Natuna Block B Facilities
- Mogpu : 23,150 M/T, Modification : 2 Ea
- Epic
- Feb. 1999 - May 2001
- Subsea Tie-Back System
- Suizhong 36 1 Oil Field
- China
- China National Offshore Oil Corp.
- Cep Topside (3 Modules) : 5,880 M/T EPIC
- Jun. 1999 - Oct. 2000
- F2A Hanze Oil Field
- Netherlands
- Veba Oil
- Gravity-Based Structure Platform & Deck : 21,000 M/T, Production Capacity : 30,000 Bopd, Storage Capacity : 150,000 Bbl, EPIC
- Jul. 1999 - Jun. 2001
- Bongkot Gas Field Phase-3b
- Thailand
- Pttep
- Wellhead Platform , Platform (2 Ea) : 3,235 M/T, Pipeline : 16”~ 18” X 23 Km, Platform Modification : 2 Ea, Epic
- Aug. 1999 - Jun. 2001
- Soroosh-Nowrooz
- Iran Epic-1
- Shell Exploration B.V,
- Platform : 4 Ea, Bridge & Tower Subsea Total : 4,124 M/T, P/L : 16” X 12 Km, Epic
- Sep. 2000 - Mar. 2002
- Eardo Project
- Korea
- Korea Offshore Research
- Platform & Pile : 3,030 M/T Epic
- Sep. 2000 - Mar. 2003
- Bayu Undan Gas Field
- Australia
- Phillips Petroleum
- IPD/CUQ Topsides Fabrication, (PPCO), DPP & CUP Topside : 24,300 M/T Ec
- Oct. 2000 - Jul. 2003
- Lan Tay Gas and Condensate Field
- Vietnam
- British Petroleum
- Production Platform : 11,000 M/T Package 1 & Package 2, Topside : 5,700 M/T, Epic
- Dec. 2000 - Jun. 2002
- Donghae 1 Gas Field
- Korea
- Korea National Oil Corporation,
- Platform : 10,100 M/T, Pipeline : 14” X 68 Km, Flowlines : 6” X 4 Km, Onshore Terminal, Epic
- Mar. 2001 - Nov. 2003
- PM 3 CAA Oil and Gas Fields
- Malaysia
- Lundin Oil Company
- Pm-3 Cpp Field Development (Phase 2) Topside
- 7,673 M/T
- Epic
- Jul. 2001 - Sep. 2003
- Al Shaheen Oil Field
- Qatar
- Maersk Oil
- Block 5 Field Development
- Platform : 10 Ea, Gas Comp. Module : 4 Ea, Total : 37,005 M/T
- Epic
- Sep. 2001 - Jun. 2003
- Bahr Essalam Gas Field
- Libya
- ENI
- Sabratha Platform: 30,832 M/T EPIC
- Jan. 2002 - Sep. 2004
- Huizhou 19-3/2/1 Oil Field
- China
- CNOOC
- Platform Cact-Og, Modification Of Platform : 2 Ea, 4 Legged Platform (2 Ea) : 24,000 M/T, Pipeline (2 Lines) : 18” & 14” X 41.1 Km, Subsea Cable : 31.8 Km, Epic
- Aug. 2002 - Jun. 2004
- Msp Platform Oil & Natural Gas Corporation Limited, India Platform, Pile & Bridge : 13,560 M/T Epic Jun. 2003 - Apr. 2005
- Gauri Oil and Gas Field
- India
- Cairn Energy India
- Gauri-A Pipeline Installation, Topside : 550 M/T, Pipeline :12” X 5.4 Km, Riser : 2 - IC
- Dec. 2003 - Mar. 2004
- Rong Doi Gas Field
- Vietnam
- Korea National Oil Corporation
- Platform (2 Ea) & Bridge Total : 17,200 M/T, Pipeline : 18” X 58 Km Epic
- Sep. 2004 - Sep. 2006
- East Area Epc-1b
- Nigeria
- Mobil Producing Unlimited (Mpn),
- Platform : 2 Ea, Topside : 1 Ea, Bridge : 3 Ea Total : 13,540 M/T, Epic
- Dec. 2004 - Jul. 2007
- Okan and Mefa Gas Fields Phase 3a (Egp3a)
- Nigeria
- Chevron
- Offshore Platform (2 Ea), Jacket & Pile : 4,392 M/T Epic, F/O Installation
- Mar. 2005 - Mar. 2007
- Yadana Gas Field
- Myanmar
- Total
- MP Compression Platform, Pile & Bridge : 8,120 Ton EPIC
- Oct. 2005 - Mar. 2008
- Umm Shaif Oil Field
- UAE
- ADMA-OPCO
- Gas Injection Facilities, Platform (3ea) Pipeline : 23 km 79
- EPIC
- Sep. 2006 ~ Jun. 2010
- 39,000
- Ofon Oil and Gas Field
- Elf Petroleum
- Nigeria
- Ofon Phase 2 – OFP2 Topside - 13,400t
- EPC
- Jun. 2007 ~ Nov. 2014
Limited Nigeria Topside
North Rankin ‘B’ Gas Comp. P/F Woodside Australia Topside & DSF epC Dec. 2007 ~ Dec. 2011 23,752 Bongkot 4A P/F PTTEP Thailand Platform & Bridge (3ea) EPIC Sep. 2008 ~ Sep. 2011 29,501 SHWE Platform Daewoo International (Myanmar E&P) Myanmar Platform Pipeline : 126.5 km 83 EPIC Oct. 2009 ~ Apr. 2013 50,750 Barzan Offshore RasGas Qatar Topside (3ea) & L/Q Pipelines : 178.5 km 84 EPIC Jan. 2011 ~ Nov. 2014 8,75 5 Clair Ridge Platform BP North Sea Platform (2ea) EPC Mar. 2011 ~ Feb. 2016 43,100 DSO Platform Chevron Nigeria Platform (2ea) EPC Jan. 2011 ~ Aug. 2014 14,881 Booster Compression Platform Carigali-Hess Malaysia Platform EPC Sep. 2012 ~ Sep. 2015 24,237 Hebron Topside DES (Derrick Equipment Set) Worley Parsons (ExxonMobil) Canada DES : 25 m x 20 m x 80 m epC Feb. 2013 ~ Feb. 2015 3,200 Su Tu Nau (T&I) PTSC M&C (CLJOC) Vietnam Jacket Installation T & I Jul. 2013 ~ Oct. 2013 5,938 Bergading CPP & WHP Hess E&P Malaysia Platform (2ea) & Bridge EPIC May. 2014 ~ Nov. 2016 32,536 NASR Full Field Development – PKG2 ADMA-OPCO UAE Platform (3ea) & Bridge (11ea) EPIC Jul. 2014 ~ May. 2019 63,064 Badamyar Development Project Total Myanmar Platform (2ea) & Bridge & Pile EPC Sep. 2014 ~ Apr. 2017 13,913 Baronia CPP-B P/F Petronas Carigali Malaysia Platform EPIC Nov. 2014 ~ Nov. 2017 22,749