=== EPC ===
 
=== EPC ===
  
#* [[Arzew LNG Terminal]]
+
# [[Arzew LNG Terminal]]  
** SONATRACH
+
#* SONATRACH
** GL-3Z ARZEW (ALGERIA)
+
#* GL-3Z ARZEW (ALGERIA)
** Capacity: 4.7 MTPA.
+
#* Capacity: 4.7 MTPA.
** Liquefaction Technology: APCI (C3MR), GE Frame 7 gas turbine.
+
#* Liquefaction Technology: APCI (C3MR), GE Frame 7 gas turbine.
** Tanks: 2 LNG x 160,000 cu.m each.
+
#* Tanks: 2 LNG x 160,000 cu.m each.
** Product Export Jetty.
+
#* Product Export Jetty.
** Contract: EPC.
+
#* Contract: EPC.
** JV Partner: Chiyoda.
+
#* JV Partner: Chiyoda.
** In execution since end 2008.
+
#* In execution since end 2008.
#*’‘‘[[Rasgas LNG Terminals]]’’’
+
# [[Rasgas LNG Terminals]]  
** RAS LAFFAN LNG CO. LTD.
+
#* RAS LAFFAN LNG CO. LTD.
** RASGAS ONSHORE EXPANSION PROJECT (TRAINS 3,4,5) RAS LAFFAN (QATAR)
+
#* RASGAS ONSHORE EXPANSION PROJECT (TRAINS 3,4,5) RAS LAFFAN (QATAR)
** Capacity: 4.7 MTPA each train.
+
#* Capacity: 4.7 MTPA each train.
** Liquefaction Technology: APCI (C3MR), GE Frame 7 gas turbines, water cooled.
+
#* Liquefaction Technology: APCI (C3MR), GE Frame 7 gas turbines, water cooled.
** Tanks: 2 LNG x 140,000 cu.m each.
+
#* Tanks: 2 LNG x 140,000 cu.m each.
** Contract: EPC.
+
#* Contract: EPC.
** JV Partner: Chiyoda.
+
#* JV Partner: Chiyoda.
** Completed, respectively, in 2004, 2005, 2006.
+
#* Completed, respectively, in 2004, 2005, 2006.
** This project, which included the design and installation of LNG trains whose capacity ranked among the largest trains operating in the world, contributed to launch Qatar into a new era as an LNG exporter.
+
#* This project, which included the design and installation of LNG trains whose capacity ranked among the largest trains operating in the world, contributed to launch Qatar into a new era as an LNG exporter.
#*’‘‘[[Nigeria LNG Terminal]]’’’
+
# [[Nigeria LNG Terminal]]  
** NIGERIA LNG LTD.
+
#* NIGERIA LNG LTD.
** LNG PRODUCTION (6 TRAINS) BONNY ISLAND (NIGERIA)
+
#* LNG PRODUCTION (6 TRAINS) BONNY ISLAND (NIGERIA)
** TRAINS 1&2
+
#* TRAINS 1&2
** Capacity: 2.9 MTPA each train.  
+
#* Capacity: 2.9 MTPA each train.  
** Liquefaction Technology: APCI (C3MR), GE Frame 6 & GE Frame 7 gas turbines, water cooled.
+
#* Liquefaction Technology: APCI (C3MR), GE Frame 6 & GE Frame 7 gas turbines, water cooled.
** Tanks: 2 LNG x 84,000 cu.m each.
+
#* Tanks: 2 LNG x 84,000 cu.m each.
** Product Export Jetty.
+
#* Product Export Jetty.
** Contract: FEED + EPC.
+
#* Contract: FEED + EPC.
** JV Partner: Technip, KBR, JGC. Completed in 1999.
+
#* JV Partner: Technip, KBR, JGC. Completed in 1999.
#*’‘‘[[Nigeria LNG Terminal]]’’’
+
# [[Nigeria LNG Terminal]]  
** NIGERIA LNG LTD.
+
#* NIGERIA LNG LTD.
** LNG PRODUCTION (6 TRAINS) BONNY ISLAND (NIGERIA)
+
#* LNG PRODUCTION (6 TRAINS) BONNY ISLAND (NIGERIA)
** TRAIN 3
+
#* TRAIN 3
** Capacity: 2.9 MTPA.
+
#* Capacity: 2.9 MTPA.
** Liquefaction Technology: APCI (C3MR), GE Frame 6 & GE Frame 7 gas turbines, water cooled.
+
#* Liquefaction Technology: APCI (C3MR), GE Frame 6 & GE Frame 7 gas turbines, water cooled.
** Tanks: 1 LNG x 84,000 cu.m.
+
#* Tanks: 1 LNG x 84,000 cu.m.
** Product Export Jetty.
+
#* Product Export Jetty.
** Contract: FEED + EPC.
+
#* Contract: FEED + EPC.
** JV Partner: Technip, KBR, JGC. Completed in 2003.
+
#* JV Partner: Technip, KBR, JGC. Completed in 2003.
#*’‘‘[[Nigeria LNG Terminal]]’’’
+
# [[Nigeria LNG Terminal]]  
** NIGERIA LNG LTD.
+
#* NIGERIA LNG LTD.
** LNG PRODUCTION (6 TRAINS) BONNY ISLAND (NIGERIA)
+
#* LNG PRODUCTION (6 TRAINS) BONNY ISLAND (NIGERIA)
** TRAINS 4&5
+
#* TRAINS 4&5
** Capacity: 4 MTPA each train.
+
#* Capacity: 4 MTPA each train.
** Liquefaction Technology: Shell/APCI (C3MR), GE Frame 7 gas turbines, air cooled.
+
#* Liquefaction Technology: Shell/APCI (C3MR), GE Frame 7 gas turbines, air cooled.
** Contract: FEED + EPC.
+
#* Contract: FEED + EPC.
** JV Partner: Technip, KBR, JGC. Completed in 2006.
+
#* JV Partner: Technip, KBR, JGC. Completed in 2006.
#*’‘‘[[Nigeria LNG Terminal]]’’’
+
# [[Nigeria LNG Terminal]]  
** NIGERIA LNG LTD.
+
#* NIGERIA LNG LTD.
** LNG PRODUCTION (6 TRAINS) BONNY ISLAND (NIGERIA)
+
#* LNG PRODUCTION (6 TRAINS) BONNY ISLAND (NIGERIA)
** TRAIN 6
+
#* TRAIN 6
** Capacity: 4 MTPA.
+
#* Capacity: 4 MTPA.
** Liquefaction Technology: Shell/APCI (C3MR), GE Frame 7 gas turbines, air cooled.
+
#* Liquefaction Technology: Shell/APCI (C3MR), GE Frame 7 gas turbines, air cooled.
** Tanks: 1 LNG x 84,000 cu.m.
+
#* Tanks: 1 LNG x 84,000 cu.m.
** Contract: FEED + EPC.
+
#* Contract: FEED + EPC.
** JV Partner: Technip, KBR, JGC. Completed in 2008.
+
#* JV Partner: Technip, KBR, JGC. Completed in 2008.
#*’‘‘[[Nigeria LNG Terminal]]’’’
+
# [[Nigeria LNG Terminal]]  
** NIGERIA LNG LTD.
+
#* NIGERIA LNG LTD.
** LNG PRODUCTION (6 TRAINS) BONNY ISLAND (NIGERIA)
+
#* LNG PRODUCTION (6 TRAINS) BONNY ISLAND (NIGERIA)
** TRAIN 7 PLUS
+
#* TRAIN 7 PLUS
** Capacity: 8.5 MTPA.
+
#* Capacity: 8.5 MTPA.
** Liquefaction Technology: Shell (PMR).
+
#* Liquefaction Technology: Shell (PMR).
** Contract: FEED.
+
#* Contract: FEED.
** JV Partner: Technip, KBR, JGC. Completed in 2007.
+
#* JV Partner: Technip, KBR, JGC. Completed in 2007.
** With the start-up of train 6, the Nigeria LNG complex has reached an overall capacity of 22 MTPA of LNG, which will grow to more than 30 MTPA, once the Nigeria LNG Seven Plus Project will be completed.
+
#* With the start-up of train 6, the Nigeria LNG complex has reached an overall capacity of 22 MTPA of LNG, which will grow to more than 30 MTPA, once the Nigeria LNG Seven Plus Project will be completed.
** This overall investment has enabled Nigeria LNG Ltd. to become one of the top LNG producers in the world.
+
#* This overall investment has enabled Nigeria LNG Ltd. to become one of the top LNG producers in the world.
#*’‘‘[[Marsa El Brega LNG Terminal]]’’’
+
# [[Marsa El Brega LNG Terminal]]  
** ESSO STANDARD INC.
+
#* ESSO STANDARD INC.
** LNG PRODUCTION PLANT MARSA EL BREGA (LIBYA)
+
#* LNG PRODUCTION PLANT MARSA EL BREGA (LIBYA)
** Capacity: 2.5 MTPA.
+
#* Capacity: 2.5 MTPA.
** Liquefaction Technology: APCI (SMR).
+
#* Liquefaction Technology: APCI (SMR).
** Contract: For construction of the grass-roots complex.  
+
#* Contract: For construction of the grass-roots complex.  
** Completed in 1970.
+
#* Completed in 1970.
  
  
+++ Design
+
=== Design ===
  
 
# AZURE Project for EEC, 1.0 / 3.0 MTPA LNG train: Conceptual Design (1999).
 
# AZURE Project for EEC, 1.0 / 3.0 MTPA LNG train: Conceptual Design (1999).
#*’‘‘[[Olokola LNG Terminal]]’’’
+
# [[Olokola LNG Terminal]]  
** OK LNG
+
#* OK LNG
** OLO KOLA PROCESS PLANT FEED (2 TRAINS) (NIGERIA)  
+
#* OLO KOLA PROCESS PLANT FEED (2 TRAINS) (NIGERIA)  
** Capacity: 2 trains x 6.3 MTPA each.
+
#* Capacity: 2 trains x 6.3 MTPA each.
** Liquefaction Technology: APCI (C3MR).
+
#* Liquefaction Technology: APCI (C3MR).
** Contract: FEED and pre-EPC Services.
+
#* Contract: FEED and pre-EPC Services.
** JV Partner: Technip. Completed in 2008.
+
#* JV Partner: Technip. Completed in 2008.
#*’‘‘[[Pars LNG Terminal]]’’’
+
# [[Pars LNG Terminal]]  
** PARS LNG
+
#* PARS LNG
** two 5 MTPA LNG trains,  
+
#* two 5 MTPA LNG trains,  
** Axens (Liquefin) Technology:  
+
#* Axens (Liquefin) Technology:  
** FEED Review and EPC Bid (All Electric Drives).
+
#* FEED Review and EPC Bid (All Electric Drives).
#*’‘‘[[Iran NIOC LNG Terminal]]’’’
+
# [[Iran NIOC LNG Terminal]]  
** IRAN LNG
+
#* IRAN LNG
** two 5 MTPA LNG trains
+
#* two 5 MTPA LNG trains
** Linde (MFC) Technology
+
#* Linde (MFC) Technology
** FEED Updating (All Electric Drives).
+
#* FEED Updating (All Electric Drives).
 
# IRIS LNG, four 5 MTPA LNG trains, Linde (MFC) Technology: Conceptual Design (All Electric Drives).
 
# IRIS LNG, four 5 MTPA LNG trains, Linde (MFC) Technology: Conceptual Design (All Electric Drives).
 
# LIBYA LNG, three 5 MTPA LNG trains, APCI (C3MR) Technology: Basic Design.
 
# LIBYA LNG, three 5 MTPA LNG trains, APCI (C3MR) Technology: Basic Design.
 
# LNG Plant for ENI E&P, one 5 MTPA LNG train, APCI (C3MR) Technology: Conceptual Design.
 
# LNG Plant for ENI E&P, one 5 MTPA LNG train, APCI (C3MR) Technology: Conceptual Design.
  
+++ Gasification
+
=== Gasification ===
  
#*’‘‘[[Swinoujscie Polskie Lng Terminal]]’’’
+
# [[Świnoujście Polskie LNG Terminal]]  
** POLSKIE LNG  
+
#* POLSKIE LNG  
** POLSKIE LNG TERMINAL SWINOUJCIE (POLAND)
+
#* POLSKIE LNG TERMINAL SWINOUJCIE (POLAND)
** LNG Send Out Capacity: 3.83 MTPA.
+
#* LNG Send Out Capacity: 3.83 MTPA.
** Vaporizers: 5 SCVs of 250 t/h each.
+
#* Vaporizers: 5 SCVs of 250 t/h each.
** Tanks: 2 x 160,000 cu.m (9% Ni Full Containment Tanks).
+
#* Tanks: 2 x 160,000 cu.m (9% Ni Full Containment Tanks).
** Contract: EPC LSTK.
+
#* Contract: EPC LSTK.
** JV Partners: Techint, PBG SA, PBG Export. Under Execution.
+
#* JV Partners: Techint, PBG SA, PBG Export. Under Execution.
** The first LNG Terminal and LNG Tanks ever built in Poland.
+
#* The first LNG Terminal and LNG Tanks ever built in Poland.
#*’‘‘[[Fos Cavaou LNG Terminal]]’’’
+
# [[Fos Cavaou LNG Terminal]]  
** GAZ DE FRANCE/TOTAL
+
#* GAZ DE FRANCE/TOTAL
** FOS CAVAOU LNG IMPORT TERMINAL FOS SUR MER, MARSEILLE (FRANCE)
+
#* FOS CAVAOU LNG IMPORT TERMINAL FOS SUR MER, MARSEILLE (FRANCE)
** LNG Send Out Capacity: 6.6 MTPA.  
+
#* LNG Send Out Capacity: 6.6 MTPA.  
** Vaporizers: 4 ORVs of 343 t/h each.
+
#* Vaporizers: 4 ORVs of 343 t/h each.
** Tanks: 3 x 110,000 cu.m (9% Ni Full Containment Tanks).  
+
#* Tanks: 3 x 110,000 cu.m (9% Ni Full Containment Tanks).  
** Marine Works: LNG offloading jetty.
+
#* Marine Works: LNG offloading jetty.
** Contract: EPC LSTK.
+
#* Contract: EPC LSTK.
** JV Partner: Tecnimont Sofregaz. Under execution.
+
#* JV Partner: Tecnimont Sofregaz. Under execution.
** The biggest ORVs ever designed and built.
+
#* The biggest ORVs ever designed and built.
#*’‘‘[[Canaport LNG]]’’’
+
# [[Canaport LNG]]  
** REPSOL / IRVING OIL
+
#* REPSOL / IRVING OIL
** CANAPORT LNG TERMINAL
+
#* CANAPORT LNG TERMINAL
** ST.JOHN, NEW BRUNSWICK (CANADA)
+
#* ST.JOHN, NEW BRUNSWICK (CANADA)
** LNG Send Out Capacity: 7.7 MTPA
+
#* LNG Send Out Capacity: 7.7 MTPA
** Vaporizers: 6+1 SCVs of 126 t/h each.
+
#* Vaporizers: 6+1 SCVs of 126 t/h each.
** Tanks: 3 x 160,000 cu.m (9% Ni Full Containment Tanks).
+
#* Tanks: 3 x 160,000 cu.m (9% Ni Full Containment Tanks).
** Contract: EPC LSTK.
+
#* Contract: EPC LSTK.
** JV Partner: SNC Lavalin. On stream in 2009.
+
#* JV Partner: SNC Lavalin. On stream in 2009.
** The first LNG regasification plant ever built in Canada.  
+
#* The first LNG regasification plant ever built in Canada.  
** The schedule and construction organization had been tailored to take into account the harsh Canadian winter conditions.
+
#* The schedule and construction organization had been tailored to take into account the harsh Canadian winter conditions.
#*’‘‘[[Freeport LNG Terminal]]’’’
+
# [[Freeport LNG Terminal]]  
** FREEPORT LNG
+
#* FREEPORT LNG
** LNG IMPORT TERMINAL QUINTANA ISLAND, TEXAS (USA)
+
#* LNG IMPORT TERMINAL QUINTANA ISLAND, TEXAS (USA)
** LNG Send Out Capacity: 11.0 MTPA.
+
#* LNG Send Out Capacity: 11.0 MTPA.
** Vaporizers: 7 shell + tube vaporizers water/glycol loop heated of 200 t/h each.
+
#* Vaporizers: 7 shell + tube vaporizers water/glycol loop heated of 200 t/h each.
** Tanks: 2 x 160,000 cu.m (9% Ni Full Containment Tanks).
+
#* Tanks: 2 x 160,000 cu.m (9% Ni Full Containment Tanks).
** Marine Works: LNG offloading jetty.
+
#* Marine Works: LNG offloading jetty.
** Contract: EPC LSTK.
+
#* Contract: EPC LSTK.
** JV Partner: Technip Zachry. On stream in 2008.
+
#* JV Partner: Technip Zachry. On stream in 2008.
** The first design and installation of vacuum insulated unloading line.
+
#* The first design and installation of vacuum insulated unloading line.
** The terminal is fully operated with shell and tubes vaporizers.
+
#* The terminal is fully operated with shell and tubes vaporizers.
#*’‘‘[[Fluxys Zeebrugge LNG Terminal]]’’’
+
# [[Fluxys Zeebrugge LNG Terminal]]  
** FLUXYS LNG  
+
#* FLUXYS LNG  
** LNG IMPORT TERMINAL
+
#* LNG IMPORT TERMINAL
** ZEEBRUGGE (BELGIUM)
+
#* ZEEBRUGGE (BELGIUM)
** LNG Send Out Capacity: 5.7 MTPA (additional capacity).
+
#* LNG Send Out Capacity: 5.7 MTPA (additional capacity).
** Vaporizers: 5 SCVs of 182 t/h each.
+
#* Vaporizers: 5 SCVs of 182 t/h each.
** Tanks: 1 x 140,000 cu.m semi buried (9% Ni Full Containment Tank).
+
#* Tanks: 1 x 140,000 cu.m semi buried (9% Ni Full Containment Tank).
** Contract: EPC LSTK.
+
#* Contract: EPC LSTK.
** Consortium Partner: MBG, Fontech Soletanche. On stream since 2008.
+
#* Consortium Partner: MBG, Fontech Soletanche. On stream since 2008.
** Extension of an existing terminal.
+
#* Extension of an existing terminal.
** The project has been performed in a plant in operation.
+
#* The project has been performed in a plant in operation.
#*’‘‘[[Guangdong Dapeng LNG Terminal]]’’’
+
# [[Guangdong Dapeng LNG Terminal]]  
** DAPENG GUANDONG LNG,  LNG IMPORT TERMINAL
+
#* DAPENG GUANDONG LNG,  LNG IMPORT TERMINAL
** CHENGTOUJIAO, GUANGDONG PROVINCE (CHINA)
+
#* CHENGTOUJIAO, GUANGDONG PROVINCE (CHINA)
** LNG Send Out Capacity: 4.0 MTPA.
+
#* LNG Send Out Capacity: 4.0 MTPA.
** Vaporizers: 5 ORVs of 180 t/h each, 1 SCV of 120 t/h.
+
#* Vaporizers: 5 ORVs of 180 t/h each, 1 SCV of 120 t/h.
** Tanks: 3 x 160,000 cu.m (9% Ni Full Containment Tanks). Marine Works: LNG unloading jetty with mooring facilities for 160,000 cu.m LNG carriers, dredging 1.5 MM cu.m.
+
#* Tanks: 3 x 160,000 cu.m (9% Ni Full Containment Tanks). Marine Works: LNG unloading jetty with mooring facilities for 160,000 cu.m LNG carriers, dredging 1.5 MM cu.m.
** Contract: EPC LSTK.
+
#* Contract: EPC LSTK.
** JV Partner: Tecnimont. On stream since 2006.
+
#* JV Partner: Tecnimont. On stream since 2006.
** First LNG terminal ever built in the People’s Republic of China. All tanks are erected on seismic insulators.
+
#* First LNG terminal ever built in the People’s Republic of China. All tanks are erected on seismic insulators.
#*’‘‘[[Hazira LNG Terminal]]’’’
+
# [[Hazira LNG Terminal]]  
** HAZIRA LNG IMPORT TERMINAL GUJARAT PROVINCE (INDIA)
+
#* HAZIRA LNG IMPORT TERMINAL GUJARAT PROVINCE (INDIA)
** LNG Send Out Capacity: 2.0 MTPA.
+
#* LNG Send Out Capacity: 2.0 MTPA.
** Vaporizers: 2 ORVs of 138 t/h each, 1 SCV of 138 t/h.
+
#* Vaporizers: 2 ORVs of 138 t/h each, 1 SCV of 138 t/h.
** Tanks: 2 x 160,000 cu.m (9% Ni Full Containment Tanks). Marine Works: Complete harbour, LNG offloading jetty for 150,000 cu.m LNG carriers, breakwaters.
+
#* Tanks: 2 x 160,000 cu.m (9% Ni Full Containment Tanks). Marine Works: Complete harbour, LNG offloading jetty for 150,000 cu.m LNG carriers, breakwaters.
** Contract: EPC LSTK.
+
#* Contract: EPC LSTK.
** JV Partner: Tecnimont. On stream since 2005.
+
#* JV Partner: Tecnimont. On stream since 2005.
** This terminal included all necessary utilities production, due to the remote location.
+
#* This terminal included all necessary utilities production, due to the remote location.
** Construction of a complete harbour facility including the breakwater and the LNG unloading jetty.
+
#* Construction of a complete harbour facility including the breakwater and the LNG unloading jetty.
#*’‘‘[[Bilbao LNG Terminal]]’’’
+
# [[Bilbao LNG Terminal]]  
** BAHIA DE BISKAIA GAS (BBG)
+
#* BAHIA DE BISKAIA GAS (BBG)
** BILBAO LNG IMPORT TERMINAL BILBAO (SPAIN)
+
#* BILBAO LNG IMPORT TERMINAL BILBAO (SPAIN)
** LNG Send Out Capacity: 4.0 MTPA.
+
#* LNG Send Out Capacity: 4.0 MTPA.
** Vaporizers: 4 ORVs of 200,000 Ncu.m/h, 1 SCV of 135,000 Ncu.m/h.
+
#* Vaporizers: 4 ORVs of 200,000 Ncu.m/h, 1 SCV of 135,000 Ncu.m/h.
** Tanks: 2 x 150,000 cu.m (9% Ni Full Containment Tanks). Marine Works: LNG offloading jetty with mooring facilities for 135,000 cu.m LNG carriers.
+
#* Tanks: 2 x 150,000 cu.m (9% Ni Full Containment Tanks). Marine Works: LNG offloading jetty with mooring facilities for 135,000 cu.m LNG carriers.
** Contract: EPC LSTK.
+
#* Contract: EPC LSTK.
** JV Partner: Initec, Tecnimont. On stream since 2003.
+
#* JV Partner: Initec, Tecnimont. On stream since 2003.
** First LNG tanks hydrotest performed using sea water.
+
#* First LNG tanks hydrotest performed using sea water.
#*’‘‘[[Revithoussa LNG Terminal]]’’’
+
# [[Revithoussa LNG Terminal]]  
** DEPA
+
#* DEPA
** LNG IMPORT TERMINAL REVITHOUSSA ISLAND (GREECE)
+
#* LNG IMPORT TERMINAL REVITHOUSSA ISLAND (GREECE)
** LNG Send Out Capacity: 0.5 MTPA.
+
#* LNG Send Out Capacity: 0.5 MTPA.
** Vaporizers: 2 ORVs of 60 t/h each, 2 SCVs of 60 t/h each.
+
#* Vaporizers: 2 ORVs of 60 t/h each, 2 SCVs of 60 t/h each.
** Marine Works: Mooring quay.
+
#* Marine Works: Mooring quay.
** Contract: EPC LSTK.
+
#* Contract: EPC LSTK.
** JV Partner: Sofregaz. The JV was in consortium with Technical Union.
+
#* JV Partner: Sofregaz. The JV was in consortium with Technical Union.
** On stream since 1999.
+
#* On stream since 1999.
** First LNG terminal ever built in Greece. The terminal is located on an island.
+
#* First LNG terminal ever built in Greece. The terminal is located on an island.
#*’‘‘[[Marmara LNG Terminal]]’’’
+
# [[Marmara LNG Terminal]]  
** BOTAS
+
#* BOTAS
** LNG IMPORT TERMINAL MARMARA EREGLISI (TURKEY)
+
#* LNG IMPORT TERMINAL MARMARA EREGLISI (TURKEY)
** LNG Send Out Capacity: 1.6 MTPA.
+
#* LNG Send Out Capacity: 1.6 MTPA.
** Vaporizers: 2 ORVs of 180 t/h, 4 SCVs of 100 t/h each.
+
#* Vaporizers: 2 ORVs of 180 t/h, 4 SCVs of 100 t/h each.
** Tanks: 3 x 85,000 cu.m (9% Ni Double Containment Tanks).
+
#* Tanks: 3 x 85,000 cu.m (9% Ni Double Containment Tanks).
** Marine Works: 300 m long LNG unloading jetty.
+
#* Marine Works: 300 m long LNG unloading jetty.
** Contract: EPC LSTK.
+
#* Contract: EPC LSTK.
** Consortium Partner for Construction: STFA. On stream since 1994.
+
#* Consortium Partner for Construction: STFA. On stream since 1994.
** First LNG terminal ever built in Turkey.
+
#* First LNG terminal ever built in Turkey.
#*’‘‘[[Pyeongtaek LNG Terminal]]’’’
+
# [[Pyeongtaek LNG Terminal]]  
** KOGAS
+
#* KOGAS
** LNG IMPORT TERMINAL PYEONG TAEK (SOUTH KOREA)
+
#* LNG IMPORT TERMINAL PYEONG TAEK (SOUTH KOREA)
** LNG Send Out Capacity: 2.8 MTPA.
+
#* LNG Send Out Capacity: 2.8 MTPA.
** Vaporizers: 2 ORVs of 130 t/h each, 2 SCVs of 140 t/h each.
+
#* Vaporizers: 2 ORVs of 130 t/h each, 2 SCVs of 140 t/h each.
** Tanks: 10 x 110,000 cu.m (Membrane LNG tanks).
+
#* Tanks: 10 x 110,000 cu.m (Membrane LNG tanks).
** Marine Works: LNG offloading jetty.
+
#* Marine Works: LNG offloading jetty.
** Contract: EPC LSTK.
+
#* Contract: EPC LSTK.
** On stream since 1987.
+
#* On stream since 1987.
** First LNG terminal ever built in Korea.
+
#* First LNG terminal ever built in Korea.
** Membrane LNG tanks erected on seismic insulators.
+
#* Membrane LNG tanks erected on seismic insulators.
#*’‘‘[[Panigaglia LNG Terminal]]’’’
+
# [[Panigaglia LNG Terminal]]  
** SNAM S.P.A.
+
#* SNAM S.P.A.
** LNG IMPORT TERMINAL PANIGAGLIA, LA SPEZIA (ITALY)
+
#* LNG IMPORT TERMINAL PANIGAGLIA, LA SPEZIA (ITALY)
** LNG Send Out Capacity: 2.8 MTPA.
+
#* LNG Send Out Capacity: 2.8 MTPA.
** Vaporizers: 4 SCVs of 110 t/h each.
+
#* Vaporizers: 4 SCVs of 110 t/h each.
** Tanks: 2 x 50,000 cu.m (The 9 Ni tanks were transformed into double integrity type, with the addition of a pre-stressed concrete wall together with the modernization of the loading/unloading system).
+
#* Tanks: 2 x 50,000 cu.m (The 9 Ni tanks were transformed into double integrity type, with the addition of a pre-stressed concrete wall together with the modernization of the loading/unloading system).
** Contract: LSTK contract for basic and detailed engineering, procurement services, erection supervision, commissioning and start-up.
+
#* Contract: LSTK contract for basic and detailed engineering, procurement services, erection supervision, commissioning and start-up.
** On stream since 1971.
+
#* On stream since 1971.
** First LNG terminal ever built in Italy.
+
#* First LNG terminal ever built in Italy.
#*’‘‘[[Livorno LNG Terminal]]’’’
+
# [[Livorno LNG Terminal]]  
** OLT (OFFSHORE LNG TOSCANA)
+
#* OLT (OFFSHORE LNG TOSCANA)
** LIVORNO FSRU
+
#* LIVORNO FSRU
** 20 KM OFFSHORE LIVORNO (ITALY)
+
#* 20 KM OFFSHORE LIVORNO (ITALY)
** Average natural gas Send Out: 3.2 MTPA.
+
#* Average natural gas Send Out: 3.2 MTPA.
** Peak Send Out Rate: 4.0 MTPA.
+
#* Peak Send Out Rate: 4.0 MTPA.
** Hull: Golar Frost LNG carrier, 301 m (with turret & thruster) x 48 m, 137,000 cu.m net LNG capacity.
+
#* Hull: Golar Frost LNG carrier, 301 m (with turret & thruster) x 48 m, 137,000 cu.m net LNG capacity.
** Compacted Topsides Module: 30 m.
+
#* Compacted Topsides Module: 30 m.
** LNG Transfer System: Marinized loading arms.
+
#* LNG Transfer System: Marinized loading arms.
** Mooring: External turret.
+
#* Mooring: External turret.
** Contract: EPC LSTK.
+
#* Contract: EPC LSTK.
** In execution since 2008.
+
#* In execution since 2008.
  
  
 
+++ LNG Tanks
 
+++ LNG Tanks
  
#*’‘‘[[Angola Soyo LNG Terminal]]’’’
+
# [[Angola Soyo LNG Terminal]]  
** ANGOLA LNG
+
#* ANGOLA LNG
** LNG TANKS
+
#* LNG TANKS
** SOYO (ANGOLA)
+
#* SOYO (ANGOLA)
** Tanks: 2 x 150,000 cu.m (9% Ni Full Containment). 2 LPG Full Containment Tanks (Low Temperature Carbon Steel Inner tank).
+
#* Tanks: 2 x 150,000 cu.m (9% Ni Full Containment). 2 LPG Full Containment Tanks (Low Temperature Carbon Steel Inner tank).
** Contract: This contract is for construction only and includes also the construction of two LPG Full Containment tanks.
+
#* Contract: This contract is for construction only and includes also the construction of two LPG Full Containment tanks.
** Consortium Partners: NAMKWENG, LION.
+
#* Consortium Partners: NAMKWENG, LION.
** In execution since 2008.
+
#* In execution since 2008.
** First LNG and LPG tanks ever built in Angola.
+
#* First LNG and LPG tanks ever built in Angola.
#*’‘‘[[Arzew LNG Terminal]]’’’
+
# [[Arzew LNG Terminal]]  
** SONATRACH
+
#* SONATRACH
** GL-3Z
+
#* GL-3Z
** ARZEW (ALGERIA)
+
#* ARZEW (ALGERIA)
** Tanks: 2 x 160,000 cu.m (9% Ni Full Containment).
+
#* Tanks: 2 x 160,000 cu.m (9% Ni Full Containment).
** Contract: EPC LSTK.
+
#* Contract: EPC LSTK.
** In execution since 2008.
+
#* In execution since 2008.
** The contract included also the design and erection of LPG Full Containment tanks.
+
#* The contract included also the design and erection of LPG Full Containment tanks.
#*’‘‘[[Cartagena LNG Terminal]]’’’
+
# [[Cartagena LNG Terminal]]  
** ENAGAS
+
#* ENAGAS
** CARTAGENA III LNG TANK MURCIA (SPAIN)
+
#* CARTAGENA III LNG TANK MURCIA (SPAIN)
** Tanks: 1 x 128,500 cu.m (9% Ni Full Containment).
+
#* Tanks: 1 x 128,500 cu.m (9% Ni Full Containment).
** Contract: EPC LSTK.
+
#* Contract: EPC LSTK.
** JV Partner: Initec.
+
#* JV Partner: Initec.
** On stream since 2005.
+
#* On stream since 2005.
** Tank built while the plant was in operation.
+
#* Tank built while the plant was in operation.
#*’‘‘[[Huelva LNG Terminal]]’’’
+
# [[Huelva LNG Terminal]]  
** ENAGAS
+
#* ENAGAS
** HUELVA III - HUELVA IV LNG TANKS ANDALUCIA (SPAIN)
+
#* HUELVA III - HUELVA IV LNG TANKS ANDALUCIA (SPAIN)
** Tanks: 2 x 150,000 cu.m (9% Ni Full Containment).
+
#* Tanks: 2 x 150,000 cu.m (9% Ni Full Containment).
** Contract: EPC LSTK.
+
#* Contract: EPC LSTK.
** JV Partner: Initec.
+
#* JV Partner: Initec.
** On stream since 2004 (the first tank) and 2006 (the second tank).
+
#* On stream since 2004 (the first tank) and 2006 (the second tank).
** Tanks built while the plant was in operation.
+
#* Tanks built while the plant was in operation.
#*’‘‘[[Damietta Segas LNG Terminal]]’’’
+
# [[Damietta Segas LNG Terminal]]  
** SEGAS
+
#* SEGAS
** LNG TANKS
+
#* LNG TANKS
** DAMIETTA (EGYPT)
+
#* DAMIETTA (EGYPT)
** Tanks: 2 x 150,000 cu.m (Full Containment).
+
#* Tanks: 2 x 150,000 cu.m (Full Containment).
** Contract: EPC LSTK.
+
#* Contract: EPC LSTK.
** JV Partner: Bouygues Travaux Publics. The JV was in consortium with Egyptian construction companies: Orascom Construction Industry for civil works and DSD Ferrometalco for mechanical works. On stream since 2004.
+
#* JV Partner: Bouygues Travaux Publics. The JV was in consortium with Egyptian construction companies: Orascom Construction Industry for civil works and DSD Ferrometalco for mechanical works. On stream since 2004.
** First LNG tanks ever built in Egypt.
+
#* First LNG tanks ever built in Egypt.
#*’‘‘[[Qatargas 1 Ras Laffan LNG Terminal]]’’’
+
# [[Qatargas 1 Ras Laffan LNG Terminal]]  
** QATARGAS
+
#* QATARGAS
** RAS LAFFAN LNG STORAGE TANKS RAS LAFFAN (QATAR)
+
#* RAS LAFFAN LNG STORAGE TANKS RAS LAFFAN (QATAR)
** Tanks: 4 x 85,000 cu.m (9% Ni Full Containment).
+
#* Tanks: 4 x 85,000 cu.m (9% Ni Full Containment).
** Contract: EPC LSTK.
+
#* Contract: EPC LSTK.
** JV Partner: Bouygues Travaux Publics. The JV was in consortium with construction companies: MIDMAC and MEACON.
+
#* JV Partner: Bouygues Travaux Publics. The JV was in consortium with construction companies: MIDMAC and MEACON.
** On stream since 1996 (the first 3 tanks) and 1998 (the fourth tank).
+
#* On stream since 1996 (the first 3 tanks) and 1998 (the fourth tank).
** The fourth tank built while the plant was in operation.
+
#* The fourth tank built while the plant was in operation.
#*’‘‘[[Montoir De Bretagne LNG Terminal]]’’’
+
# [[Montoir De Bretagne LNG Terminal]]  
** GAZ DE FRANCE
+
#* GAZ DE FRANCE
** LNG TANKS
+
#* LNG TANKS
** MONTOIR (FRANCE)
+
#* MONTOIR (FRANCE)
** Tanks: 2 x 120,000 cu.m (Membrane Technology).
+
#* Tanks: 2 x 120,000 cu.m (Membrane Technology).
** Contract: EPC LSTK.
+
#* Contract: EPC LSTK.
** On stream since 1981.
+
#* On stream since 1981.
** First above ground membrane LNG.
+
#* First above ground membrane LNG.

Latest revision as of 14:49, 8 July 2022

EPC

  1. Arzew LNG Terminal
    • SONATRACH
    • GL-3Z ARZEW (ALGERIA)
    • Capacity: 4.7 MTPA.
    • Liquefaction Technology: APCI (C3MR), GE Frame 7 gas turbine.
    • Tanks: 2 LNG x 160,000 cu.m each.
    • Product Export Jetty.
    • Contract: EPC.
    • JV Partner: Chiyoda.
    • In execution since end 2008.
  2. Rasgas LNG Terminals
    • RAS LAFFAN LNG CO. LTD.
    • RASGAS ONSHORE EXPANSION PROJECT (TRAINS 3,4,5) RAS LAFFAN (QATAR)
    • Capacity: 4.7 MTPA each train.
    • Liquefaction Technology: APCI (C3MR), GE Frame 7 gas turbines, water cooled.
    • Tanks: 2 LNG x 140,000 cu.m each.
    • Contract: EPC.
    • JV Partner: Chiyoda.
    • Completed, respectively, in 2004, 2005, 2006.
    • This project, which included the design and installation of LNG trains whose capacity ranked among the largest trains operating in the world, contributed to launch Qatar into a new era as an LNG exporter.
  3. Nigeria LNG Terminal
    • NIGERIA LNG LTD.
    • LNG PRODUCTION (6 TRAINS) BONNY ISLAND (NIGERIA)
    • TRAINS 1&2
    • Capacity: 2.9 MTPA each train.
    • Liquefaction Technology: APCI (C3MR), GE Frame 6 & GE Frame 7 gas turbines, water cooled.
    • Tanks: 2 LNG x 84,000 cu.m each.
    • Product Export Jetty.
    • Contract: FEED + EPC.
    • JV Partner: Technip, KBR, JGC. Completed in 1999.
  4. Nigeria LNG Terminal
    • NIGERIA LNG LTD.
    • LNG PRODUCTION (6 TRAINS) BONNY ISLAND (NIGERIA)
    • TRAIN 3
    • Capacity: 2.9 MTPA.
    • Liquefaction Technology: APCI (C3MR), GE Frame 6 & GE Frame 7 gas turbines, water cooled.
    • Tanks: 1 LNG x 84,000 cu.m.
    • Product Export Jetty.
    • Contract: FEED + EPC.
    • JV Partner: Technip, KBR, JGC. Completed in 2003.
  5. Nigeria LNG Terminal
    • NIGERIA LNG LTD.
    • LNG PRODUCTION (6 TRAINS) BONNY ISLAND (NIGERIA)
    • TRAINS 4&5
    • Capacity: 4 MTPA each train.
    • Liquefaction Technology: Shell/APCI (C3MR), GE Frame 7 gas turbines, air cooled.
    • Contract: FEED + EPC.
    • JV Partner: Technip, KBR, JGC. Completed in 2006.
  6. Nigeria LNG Terminal
    • NIGERIA LNG LTD.
    • LNG PRODUCTION (6 TRAINS) BONNY ISLAND (NIGERIA)
    • TRAIN 6
    • Capacity: 4 MTPA.
    • Liquefaction Technology: Shell/APCI (C3MR), GE Frame 7 gas turbines, air cooled.
    • Tanks: 1 LNG x 84,000 cu.m.
    • Contract: FEED + EPC.
    • JV Partner: Technip, KBR, JGC. Completed in 2008.
  7. Nigeria LNG Terminal
    • NIGERIA LNG LTD.
    • LNG PRODUCTION (6 TRAINS) BONNY ISLAND (NIGERIA)
    • TRAIN 7 PLUS
    • Capacity: 8.5 MTPA.
    • Liquefaction Technology: Shell (PMR).
    • Contract: FEED.
    • JV Partner: Technip, KBR, JGC. Completed in 2007.
    • With the start-up of train 6, the Nigeria LNG complex has reached an overall capacity of 22 MTPA of LNG, which will grow to more than 30 MTPA, once the Nigeria LNG Seven Plus Project will be completed.
    • This overall investment has enabled Nigeria LNG Ltd. to become one of the top LNG producers in the world.
  8. Marsa El Brega LNG Terminal
    • ESSO STANDARD INC.
    • LNG PRODUCTION PLANT MARSA EL BREGA (LIBYA)
    • Capacity: 2.5 MTPA.
    • Liquefaction Technology: APCI (SMR).
    • Contract: For construction of the grass-roots complex.
    • Completed in 1970.


Design

  1. AZURE Project for EEC, 1.0 / 3.0 MTPA LNG train: Conceptual Design (1999).
  2. Olokola LNG Terminal
    • OK LNG
    • OLO KOLA PROCESS PLANT FEED (2 TRAINS) (NIGERIA)
    • Capacity: 2 trains x 6.3 MTPA each.
    • Liquefaction Technology: APCI (C3MR).
    • Contract: FEED and pre-EPC Services.
    • JV Partner: Technip. Completed in 2008.
  3. Pars LNG Terminal
    • PARS LNG
    • two 5 MTPA LNG trains,
    • Axens (Liquefin) Technology:
    • FEED Review and EPC Bid (All Electric Drives).
  4. Iran NIOC LNG Terminal
    • IRAN LNG
    • two 5 MTPA LNG trains
    • Linde (MFC) Technology
    • FEED Updating (All Electric Drives).
  5. IRIS LNG, four 5 MTPA LNG trains, Linde (MFC) Technology: Conceptual Design (All Electric Drives).
  6. LIBYA LNG, three 5 MTPA LNG trains, APCI (C3MR) Technology: Basic Design.
  7. LNG Plant for ENI E&P, one 5 MTPA LNG train, APCI (C3MR) Technology: Conceptual Design.

Gasification

  1. Świnoujście Polskie LNG Terminal
    • POLSKIE LNG
    • POLSKIE LNG TERMINAL SWINOUJCIE (POLAND)
    • LNG Send Out Capacity: 3.83 MTPA.
    • Vaporizers: 5 SCVs of 250 t/h each.
    • Tanks: 2 x 160,000 cu.m (9% Ni Full Containment Tanks).
    • Contract: EPC LSTK.
    • JV Partners: Techint, PBG SA, PBG Export. Under Execution.
    • The first LNG Terminal and LNG Tanks ever built in Poland.
  2. Fos Cavaou LNG Terminal
    • GAZ DE FRANCE/TOTAL
    • FOS CAVAOU LNG IMPORT TERMINAL FOS SUR MER, MARSEILLE (FRANCE)
    • LNG Send Out Capacity: 6.6 MTPA.
    • Vaporizers: 4 ORVs of 343 t/h each.
    • Tanks: 3 x 110,000 cu.m (9% Ni Full Containment Tanks).
    • Marine Works: LNG offloading jetty.
    • Contract: EPC LSTK.
    • JV Partner: Tecnimont Sofregaz. Under execution.
    • The biggest ORVs ever designed and built.
  3. Canaport LNG
    • REPSOL / IRVING OIL
    • CANAPORT LNG TERMINAL
    • ST.JOHN, NEW BRUNSWICK (CANADA)
    • LNG Send Out Capacity: 7.7 MTPA
    • Vaporizers: 6+1 SCVs of 126 t/h each.
    • Tanks: 3 x 160,000 cu.m (9% Ni Full Containment Tanks).
    • Contract: EPC LSTK.
    • JV Partner: SNC Lavalin. On stream in 2009.
    • The first LNG regasification plant ever built in Canada.
    • The schedule and construction organization had been tailored to take into account the harsh Canadian winter conditions.
  4. Freeport LNG Terminal
    • FREEPORT LNG
    • LNG IMPORT TERMINAL QUINTANA ISLAND, TEXAS (USA)
    • LNG Send Out Capacity: 11.0 MTPA.
    • Vaporizers: 7 shell + tube vaporizers water/glycol loop heated of 200 t/h each.
    • Tanks: 2 x 160,000 cu.m (9% Ni Full Containment Tanks).
    • Marine Works: LNG offloading jetty.
    • Contract: EPC LSTK.
    • JV Partner: Technip Zachry. On stream in 2008.
    • The first design and installation of vacuum insulated unloading line.
    • The terminal is fully operated with shell and tubes vaporizers.
  5. Fluxys Zeebrugge LNG Terminal
    • FLUXYS LNG
    • LNG IMPORT TERMINAL
    • ZEEBRUGGE (BELGIUM)
    • LNG Send Out Capacity: 5.7 MTPA (additional capacity).
    • Vaporizers: 5 SCVs of 182 t/h each.
    • Tanks: 1 x 140,000 cu.m semi buried (9% Ni Full Containment Tank).
    • Contract: EPC LSTK.
    • Consortium Partner: MBG, Fontech Soletanche. On stream since 2008.
    • Extension of an existing terminal.
    • The project has been performed in a plant in operation.
  6. Guangdong Dapeng LNG Terminal
    • DAPENG GUANDONG LNG, LNG IMPORT TERMINAL
    • CHENGTOUJIAO, GUANGDONG PROVINCE (CHINA)
    • LNG Send Out Capacity: 4.0 MTPA.
    • Vaporizers: 5 ORVs of 180 t/h each, 1 SCV of 120 t/h.
    • Tanks: 3 x 160,000 cu.m (9% Ni Full Containment Tanks). Marine Works: LNG unloading jetty with mooring facilities for 160,000 cu.m LNG carriers, dredging 1.5 MM cu.m.
    • Contract: EPC LSTK.
    • JV Partner: Tecnimont. On stream since 2006.
    • First LNG terminal ever built in the People’s Republic of China. All tanks are erected on seismic insulators.
  7. Hazira LNG Terminal
    • HAZIRA LNG IMPORT TERMINAL GUJARAT PROVINCE (INDIA)
    • LNG Send Out Capacity: 2.0 MTPA.
    • Vaporizers: 2 ORVs of 138 t/h each, 1 SCV of 138 t/h.
    • Tanks: 2 x 160,000 cu.m (9% Ni Full Containment Tanks). Marine Works: Complete harbour, LNG offloading jetty for 150,000 cu.m LNG carriers, breakwaters.
    • Contract: EPC LSTK.
    • JV Partner: Tecnimont. On stream since 2005.
    • This terminal included all necessary utilities production, due to the remote location.
    • Construction of a complete harbour facility including the breakwater and the LNG unloading jetty.
  8. Bilbao LNG Terminal
    • BAHIA DE BISKAIA GAS (BBG)
    • BILBAO LNG IMPORT TERMINAL BILBAO (SPAIN)
    • LNG Send Out Capacity: 4.0 MTPA.
    • Vaporizers: 4 ORVs of 200,000 Ncu.m/h, 1 SCV of 135,000 Ncu.m/h.
    • Tanks: 2 x 150,000 cu.m (9% Ni Full Containment Tanks). Marine Works: LNG offloading jetty with mooring facilities for 135,000 cu.m LNG carriers.
    • Contract: EPC LSTK.
    • JV Partner: Initec, Tecnimont. On stream since 2003.
    • First LNG tanks hydrotest performed using sea water.
  9. Revithoussa LNG Terminal
    • DEPA
    • LNG IMPORT TERMINAL REVITHOUSSA ISLAND (GREECE)
    • LNG Send Out Capacity: 0.5 MTPA.
    • Vaporizers: 2 ORVs of 60 t/h each, 2 SCVs of 60 t/h each.
    • Marine Works: Mooring quay.
    • Contract: EPC LSTK.
    • JV Partner: Sofregaz. The JV was in consortium with Technical Union.
    • On stream since 1999.
    • First LNG terminal ever built in Greece. The terminal is located on an island.
  10. Marmara LNG Terminal
    • BOTAS
    • LNG IMPORT TERMINAL MARMARA EREGLISI (TURKEY)
    • LNG Send Out Capacity: 1.6 MTPA.
    • Vaporizers: 2 ORVs of 180 t/h, 4 SCVs of 100 t/h each.
    • Tanks: 3 x 85,000 cu.m (9% Ni Double Containment Tanks).
    • Marine Works: 300 m long LNG unloading jetty.
    • Contract: EPC LSTK.
    • Consortium Partner for Construction: STFA. On stream since 1994.
    • First LNG terminal ever built in Turkey.
  11. Pyeongtaek LNG Terminal
    • KOGAS
    • LNG IMPORT TERMINAL PYEONG TAEK (SOUTH KOREA)
    • LNG Send Out Capacity: 2.8 MTPA.
    • Vaporizers: 2 ORVs of 130 t/h each, 2 SCVs of 140 t/h each.
    • Tanks: 10 x 110,000 cu.m (Membrane LNG tanks).
    • Marine Works: LNG offloading jetty.
    • Contract: EPC LSTK.
    • On stream since 1987.
    • First LNG terminal ever built in Korea.
    • Membrane LNG tanks erected on seismic insulators.
  12. Panigaglia LNG Terminal
    • SNAM S.P.A.
    • LNG IMPORT TERMINAL PANIGAGLIA, LA SPEZIA (ITALY)
    • LNG Send Out Capacity: 2.8 MTPA.
    • Vaporizers: 4 SCVs of 110 t/h each.
    • Tanks: 2 x 50,000 cu.m (The 9 Ni tanks were transformed into double integrity type, with the addition of a pre-stressed concrete wall together with the modernization of the loading/unloading system).
    • Contract: LSTK contract for basic and detailed engineering, procurement services, erection supervision, commissioning and start-up.
    • On stream since 1971.
    • First LNG terminal ever built in Italy.
  13. Livorno LNG Terminal
    • OLT (OFFSHORE LNG TOSCANA)
    • LIVORNO FSRU
    • 20 KM OFFSHORE LIVORNO (ITALY)
    • Average natural gas Send Out: 3.2 MTPA.
    • Peak Send Out Rate: 4.0 MTPA.
    • Hull: Golar Frost LNG carrier, 301 m (with turret & thruster) x 48 m, 137,000 cu.m net LNG capacity.
    • Compacted Topsides Module: 30 m.
    • LNG Transfer System: Marinized loading arms.
    • Mooring: External turret.
    • Contract: EPC LSTK.
    • In execution since 2008.


+++ LNG Tanks

  1. Angola Soyo LNG Terminal
    • ANGOLA LNG
    • LNG TANKS
    • SOYO (ANGOLA)
    • Tanks: 2 x 150,000 cu.m (9% Ni Full Containment). 2 LPG Full Containment Tanks (Low Temperature Carbon Steel Inner tank).
    • Contract: This contract is for construction only and includes also the construction of two LPG Full Containment tanks.
    • Consortium Partners: NAMKWENG, LION.
    • In execution since 2008.
    • First LNG and LPG tanks ever built in Angola.
  2. Arzew LNG Terminal
    • SONATRACH
    • GL-3Z
    • ARZEW (ALGERIA)
    • Tanks: 2 x 160,000 cu.m (9% Ni Full Containment).
    • Contract: EPC LSTK.
    • In execution since 2008.
    • The contract included also the design and erection of LPG Full Containment tanks.
  3. Cartagena LNG Terminal
    • ENAGAS
    • CARTAGENA III LNG TANK MURCIA (SPAIN)
    • Tanks: 1 x 128,500 cu.m (9% Ni Full Containment).
    • Contract: EPC LSTK.
    • JV Partner: Initec.
    • On stream since 2005.
    • Tank built while the plant was in operation.
  4. Huelva LNG Terminal
    • ENAGAS
    • HUELVA III - HUELVA IV LNG TANKS ANDALUCIA (SPAIN)
    • Tanks: 2 x 150,000 cu.m (9% Ni Full Containment).
    • Contract: EPC LSTK.
    • JV Partner: Initec.
    • On stream since 2004 (the first tank) and 2006 (the second tank).
    • Tanks built while the plant was in operation.
  5. Damietta Segas LNG Terminal
    • SEGAS
    • LNG TANKS
    • DAMIETTA (EGYPT)
    • Tanks: 2 x 150,000 cu.m (Full Containment).
    • Contract: EPC LSTK.
    • JV Partner: Bouygues Travaux Publics. The JV was in consortium with Egyptian construction companies: Orascom Construction Industry for civil works and DSD Ferrometalco for mechanical works. On stream since 2004.
    • First LNG tanks ever built in Egypt.
  6. Qatargas 1 Ras Laffan LNG Terminal
    • QATARGAS
    • RAS LAFFAN LNG STORAGE TANKS RAS LAFFAN (QATAR)
    • Tanks: 4 x 85,000 cu.m (9% Ni Full Containment).
    • Contract: EPC LSTK.
    • JV Partner: Bouygues Travaux Publics. The JV was in consortium with construction companies: MIDMAC and MEACON.
    • On stream since 1996 (the first 3 tanks) and 1998 (the fourth tank).
    • The fourth tank built while the plant was in operation.
  7. Montoir De Bretagne LNG Terminal
    • GAZ DE FRANCE
    • LNG TANKS
    • MONTOIR (FRANCE)
    • Tanks: 2 x 120,000 cu.m (Membrane Technology).
    • Contract: EPC LSTK.
    • On stream since 1981.
    • First above ground membrane LNG.