Ninian Crude Oil Pipeline
Revision as of 14:30, 3 May 2024 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Source: Ninian Oil Field * Destination: Sullom Voe Oil Terminal * Ownership: CNR * Website: http://www.cnrl.com/ * Length: 175 kilometres ( mile...")
Summary Information
- Source: Ninian Oil Field
- Destination: Sullom Voe Oil Terminal
- Ownership: CNR
- Website: http://www.cnrl.com/
- Length: 175 kilometres ( miles)
- Capacity: 910,000 barrels of oil per day
- Crude Type:
+++ Brief Description
- The 36-inch diameter, 175 kilometre long Ninian Pipeline runs from CNR International's Ninian Central Platform to Sullom Voe Terminal.
- The pipeline carries crude oil from the Ninian Oil Field, Greater Alwyn Oil and Gas Fields, Heather Oil and Gas Field and Magnus Oil Field
+++ Pipeline Status
- In operation
+++ History
- 1978 - Pipeline operations began
- 1996 - Oryx acquired Chevron's share
- 2002 - CNRL becomes the major shareholder
+++ Other Information
- -
+++ Links