Difference between revisions of "Gujarat Refinery Upgrade Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 9: | Line 9: | ||
* Project Stage: Completed 2011 | * Project Stage: Completed 2011 | ||
* Budget: | * Budget: | ||
+ | |||
=== The Project === | === The Project === | ||
* Project Type: Upgrade | * Project Type: Upgrade | ||
Line 36: | Line 37: | ||
# [http://www.iocl.com/AboutUs/GujaratRefinery.aspx Gujarat Refinery Webpage] | # [http://www.iocl.com/AboutUs/GujaratRefinery.aspx Gujarat Refinery Webpage] | ||
# [http://killajoules.wikidot.com/archive:foster-wheeler-receives-delayed-coker-award-from-ind Foster Wheeler Receives Delayed Coker Award from Indian Oil Corporation Limited] | # [http://killajoules.wikidot.com/archive:foster-wheeler-receives-delayed-coker-award-from-ind Foster Wheeler Receives Delayed Coker Award from Indian Oil Corporation Limited] | ||
− | # | + | # [[Punj Lloyd Refining References]] |
[[category:Refinery]] | [[category:Refinery]] | ||
[[category:India]] | [[category:India]] | ||
[[category:IOCL]] | [[category:IOCL]] |
Latest revision as of 09:29, 25 March 2020
Contents
Summary Information
- Ownership: Indian Oil Company
- Website: http://www.iocl.com/
- List of Indian Oil Company Refineries
- Wiki Page: Gujarat Refinery
- Location: Koyali near Vadodara in Western India
- Capacity: 13.7 million tons/annum & 274,000 bbl/day
- Nelson Complexity:
- Project Stage: Completed 2011
- Budget:
The Project
- Project Type: Upgrade
- Project Summary: A residuum upgrade project designed to eliminate heavy fuel oils
- Main Contractors:
- Foster Wheeler: license and basic engineering package for the new delayed coker
- Punj Lloyd: Residual basic and detailed engineering, procurement, construction and commissioning
Refining Units
- Delayed Coker - 3.7 mta
- Diesel Hydrotreater,
- Sulphur Recovery Plant
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
-
Products Produced
- Ultra low sulphur diesel
History
- 2007 - Foster Wheeler Ltd. was awarded a contract to provide a license and basic engineering package for the new delayed coker.
- 2011 - Project completed
Other Information
-