Difference between revisions of "Gujarat Refinery"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information Also known as Vadodara Refinery Ownership: Indian Oil Company Website: http://www.iocl.com/ Location: Koyali in Western India Capacity: 13.7 million tons/a...")
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
Also known as Vadodara Refinery
+
* Ownership: Indian Oil Company
Ownership: Indian Oil Company
+
* Website: http://www.iocl.com/
Website: http://www.iocl.com/
+
* List of [[Indian Oil Company Refineries]]
Location: Koyali in Western India
+
* Location: Koyali near Vadodara in Western India
Capacity: 13.7 million tons/annum & 274,000 bbl/day
+
* Capacity: 13.7 million tons/annum & 274,000 bbl/day
Nelson Complexity:
+
* Nelson Complexity:
Refining Depth:
+
* Refining Depth:
Brief Description
+
=== Brief Description ===
The Gujarat Refinery at Koyali in Western India is Indian Oil’s largest refinery. It produces both fuels & petrochemicals
+
* The Gujarat Refinery at Koyali in Western India is Indian Oil’s largest refinery. It produces both fuels & petrochemicals
Refining Units
+
=== Refining Units ===
Atmospheric Distillation
+
* Atmospheric Distillation
Vacuum Distillation
+
* Vacuum Distillation
Fluidised Catalytic Cracker,
+
* Fluidised Catalytic Cracker,
Hydrocracker
+
* Hydrocracker
Diesel Desulphurisation Unit
+
* Delayed Coker
Gasoline Desulphurisation Unit
+
* Diesel Desulphurisation Unit
Terminal Capacity
+
* Gasoline Desulphurisation Unit
Crude Oil:
+
=== Terminal Capacity ===
Refined Products:
+
* Crude Oil:
Crude Supply
+
* Refined Products:
The refinery processes indigenous and imported, both low sulphur and high sulphur grades of crude oil.
+
=== Crude Supply ===
Products Produced
+
* The refinery processes indigenous and imported, both low sulphur and high sulphur grades of crude oil.
LPG, Gasoline, Diesel, Jet fuel
+
=== Products Produced ===
Ongoing Projects
+
* LPG, Gasoline, Diesel, Jet fuel
The refinery is to be expanded to 360,000 bbls per day, see Gujarat Refinery Expansion Project
+
=== Projects ===
 +
* The refinery is to be expanded to 360,000 bbls per day, see [[Gujarat Refinery Expansion Project]]
 
Indian Oil plans to connect the refinery to the coast by the Kandla-Viramgam-Siddhpur Pipeline
 
Indian Oil plans to connect the refinery to the coast by the Kandla-Viramgam-Siddhpur Pipeline
Gujarat Refinery is implementing a mega project to comply regulations for supplying eco-friendly fuels and to upgrade the bottom of the barrel to improve the gross margin of the Refinery
+
* In 2011, Gujarat Refinery completed a mega project to comply regulations for supplying eco-friendly fuels and to upgrade the bottom of the barrel to improve the gross margin of the Refinery
For details see Gujarat Refinery Upgrade Project
+
* For details see [[Gujarat Refinery Upgrade Project]]
Other Information
+
=== Other Information ===
 
-
 
-
History
+
=== History ===
1966 - Gujarat refinery is commissioned
+
* 1966 - Gujarat refinery is commissioned
1981 - Expansion of Refinery from 4.3 to 7.3 Million TPA + 1 Million TPA FCC Unit
+
* 1981 - Expansion of Refinery from 4.3 to 7.3 Million TPA + 1 Million TPA FCC Unit
1988 - Revamp of Refinery from 7.3 to 9.5 Million TPA
+
* 1988 - Revamp of Refinery from 7.3 to 9.5 Million TPA
1992 - UDEX Unit Revamp
+
* 1992 - UDEX Unit Revamp
1993 - 1.2 Million TPA Hydrocracker & Hexane unit commissioned
+
* 1993 - 1.2 Million TPA Hydrocracker & Hexane unit commissioned
1999 - Refinery Expansion by 3 Million TPA
+
* 1999 - Refinery Expansion by 3 Million TPA
1999 - 1.2 Million TPA DHDS & Sulphur Block Project
+
* 1999 - 1.2 Million TPA DHDS & Sulphur Block Project
2006 - Clean gasoline project
+
* 2006 - Clean gasoline project
2007 - L&T awarded sulphur recovery contract
+
* 2007 - L&T awarded sulphur recovery contract
Relevant Links
+
* 2011 - Delayed coker commissioned
Koyali plant to turn Virtual Coastal Refinery
+
* 2018 - DHDS unit revamp completed
Engineers India Refining References
+
=== Links ===
Punj Lloyd Refining References
+
# [http://www.indianexpress.com/news/koyali-plant-to-turn-virtual-coastal-refinery/712392/ Koyali plant to turn Virtual Coastal Refinery]
Daelim Oil And Gas Projects
+
# [[Engineers India Refining References]]
L&T bags Rs. 6930 million order from IOCL
+
# [[Punj Lloyd Refining References]]
IndianOil Board gives its nod for Gujarat Refinery expansion by 4.3 MMTPA
+
# [[Daelim Oil And Gas Projects]]
 +
# [http://killajoules.wikidot.com/archive:l-t-bags-rs-6930-million-order-from-iocl L&T bags Rs. 6930 million order from IOCL]
 +
# [http://killajoules.wikidot.com/archive:indianoil-board-gives-its-nod-for-gujarat-refinery-e IndianOil Board gives its nod for Gujarat Refinery expansion by 4.3 MMTPA]
 +
 
 +
[[category:Refinery]]
 +
[[category:India]]
 +
[[category:IOCL]]

Revision as of 09:21, 25 March 2020

Summary Information

Brief Description

  • The Gujarat Refinery at Koyali in Western India is Indian Oil’s largest refinery. It produces both fuels & petrochemicals

Refining Units

  • Atmospheric Distillation
  • Vacuum Distillation
  • Fluidised Catalytic Cracker,
  • Hydrocracker
  • Delayed Coker
  • Diesel Desulphurisation Unit
  • Gasoline Desulphurisation Unit

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • The refinery processes indigenous and imported, both low sulphur and high sulphur grades of crude oil.

Products Produced

  • LPG, Gasoline, Diesel, Jet fuel

Projects

Indian Oil plans to connect the refinery to the coast by the Kandla-Viramgam-Siddhpur Pipeline

  • In 2011, Gujarat Refinery completed a mega project to comply regulations for supplying eco-friendly fuels and to upgrade the bottom of the barrel to improve the gross margin of the Refinery
  • For details see Gujarat Refinery Upgrade Project

Other Information

-

History

  • 1966 - Gujarat refinery is commissioned
  • 1981 - Expansion of Refinery from 4.3 to 7.3 Million TPA + 1 Million TPA FCC Unit
  • 1988 - Revamp of Refinery from 7.3 to 9.5 Million TPA
  • 1992 - UDEX Unit Revamp
  • 1993 - 1.2 Million TPA Hydrocracker & Hexane unit commissioned
  • 1999 - Refinery Expansion by 3 Million TPA
  • 1999 - 1.2 Million TPA DHDS & Sulphur Block Project
  • 2006 - Clean gasoline project
  • 2007 - L&T awarded sulphur recovery contract
  • 2011 - Delayed coker commissioned
  • 2018 - DHDS unit revamp completed

Links

  1. Koyali plant to turn Virtual Coastal Refinery
  2. Engineers India Refining References
  3. Punj Lloyd Refining References
  4. Daelim Oil And Gas Projects
  5. L&T bags Rs. 6930 million order from IOCL
  6. IndianOil Board gives its nod for Gujarat Refinery expansion by 4.3 MMTPA