* '''Stolt Offshore:''' Engineering, fabrication and installation of five offshore platforms with two linking bridges, the modification of three existing platforms and the installation of 100 kms of subsea pipelines | * '''Stolt Offshore:''' Engineering, fabrication and installation of five offshore platforms with two linking bridges, the modification of three existing platforms and the installation of 100 kms of subsea pipelines | ||
* '''IHI:''' FPSO construction | * '''IHI:''' FPSO construction | ||
+ | |||
+ | ==== Sanha Lean Gas Connection (SLGC) project ==== | ||
+ | * '''Subsea 7:''' construction and installation of the Lean Gas Platform (LGP) system | ||
=== History === | === History === | ||
* 2002 - Stolt Offshore Awarded Contract for offshore platforms | * 2002 - Stolt Offshore Awarded Contract for offshore platforms | ||
* 2005 - Sanha produces first condensate | * 2005 - Sanha produces first condensate | ||
+ | * 2021 - Subsea 7 awarded SLGC contract | ||
* 2024 - Sanha Lean Gas Connection (SLGC) project completed | * 2024 - Sanha Lean Gas Connection (SLGC) project completed | ||
Line 34: | Line 38: | ||
# [http://killajoules.wikidot.com/archive:chevrontexaco-announces-first-oil-from-angolas-bombo ChevronTexaco Announces First Oil from Angolas Bomboco Field] | # [http://killajoules.wikidot.com/archive:chevrontexaco-announces-first-oil-from-angolas-bombo ChevronTexaco Announces First Oil from Angolas Bomboco Field] | ||
# [http://killajoules.wikidot.com/archive:chevrontexaco-press-release-chevrontexaco-announces ChevronTexaco Announces First Condensate From Angolas Sanha Field] | # [http://killajoules.wikidot.com/archive:chevrontexaco-press-release-chevrontexaco-announces ChevronTexaco Announces First Condensate From Angolas Sanha Field] | ||
+ | # [https://abarrelfull.blogspot.com/2025/01/subsea-7-awarded-contract-offshore.html Subsea 7 awarded contract offshore Angola] | ||
# [https://a-barrel-full.blogspot.com/2025/01/sanha-lean-gas-connection-achieves.html Sanha lean gas connection achieves first gas] | # [https://a-barrel-full.blogspot.com/2025/01/sanha-lean-gas-connection-achieves.html Sanha lean gas connection achieves first gas] | ||
Latest revision as of 16:00, 1 January 2025
Contents
Summary Information
- Operator: Chevron
- Country: Angola
- Location: Block 0, Offshore
- Production start: 2005
- Partners: Sonangol, Chevron, Agip and Total
- Type: Oil, Gas and Condensate
- Estimated Reserves:
- Production Volume:
Description
- The development includes the Sanha Condensate Field and the Bomboco Oil Field
- The complex comprises a drilling production platform (DPP), a process and compression platform (PCP), and a quarters platform.
- The Sanha complex is capable of re-injecting 500 million cubic feet of produced gas per day.
- The field utilises the Sanha LPG FPSO, the worlds first LPG processing FPSO
- With the completion of the Sanha Lean Gas Connection (SLGC) project, gas is supplied to Angola Soyo LNG Terminal
Contractors
- SBM Offshore: Provision of FPSO
- Stolt Offshore: Engineering, fabrication and installation of five offshore platforms with two linking bridges, the modification of three existing platforms and the installation of 100 kms of subsea pipelines
- IHI: FPSO construction
Sanha Lean Gas Connection (SLGC) project
- Subsea 7: construction and installation of the Lean Gas Platform (LGP) system
History
- 2002 - Stolt Offshore Awarded Contract for offshore platforms
- 2005 - Sanha produces first condensate
- 2021 - Subsea 7 awarded SLGC contract
- 2024 - Sanha Lean Gas Connection (SLGC) project completed