Sanha-Bomboco Oil and Gas Field
Jump to navigation
Jump to search
Contents
Summary Information
- Operator: Chevron
- Country: Angola
- Location: Block 0, Offshore
- Production start: 2005
- Partners: Sonangol, Chevron, Agip and Total
- Type: Oil, Gas and Condensate
- Estimated Reserves:
- Production Volume:
Description
- The development includes the Sanha Condensate Field and the Bomboco Oil Field
- The complex comprises a drilling production platform (DPP), a process and compression platform (PCP), and a quarters platform.
- The Sanha complex is capable of re-injecting 500 million cubic feet of produced gas per day.
- The field utilises the Sanha LPG FPSO, the worlds first LPG processing FPSO
- With the completion of the Sanha Lean Gas Connection (SLGC) project, gas is supplied to Angola Soyo LNG Terminal
Contractors
- SBM Offshore: Provision of FPSO
- Stolt Offshore: Engineering, fabrication and installation of five offshore platforms with two linking bridges, the modification of three existing platforms and the installation of 100 kms of subsea pipelines
- IHI: FPSO construction
Sanha Lean Gas Connection (SLGC) project
- Subsea 7: construction and installation of the Lean Gas Platform (LGP) system
History
- 2002 - Stolt Offshore Awarded Contract for offshore platforms
- 2005 - Sanha produces first condensate
- 2021 - Subsea 7 awarded SLGC contract
- 2024 - Sanha Lean Gas Connection (SLGC) project completed