Difference between revisions of "Sanha-Bomboco Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: Chevron | * Operator: Chevron | ||
* Country: Angola | * Country: Angola | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* The development includes the Sanha Condensate Field and the Bomboco Oil Field | * The development includes the Sanha Condensate Field and the Bomboco Oil Field | ||
* The Sanha complex is capable of re-injecting 500 million cubic feet of produced gas per day. | * The Sanha complex is capable of re-injecting 500 million cubic feet of produced gas per day. | ||
* The field utilises the [[Sanha LPG FPSO]], the worlds first LPG processing FPSO | * The field utilises the [[Sanha LPG FPSO]], the worlds first LPG processing FPSO | ||
+ | * With the completion of the Sanha Lean Gas Connection (SLGC) project, gas is supplied to [[Angola Soyo LNG Terminal]] | ||
− | + | === Contractors === | |
− | * | + | * '''SBM Offshore:''' Provision of FPSO |
− | * | + | * '''Stolt Offshore:''' Engineering, fabrication and installation of five offshore platforms with two linking bridges, the modification of three existing platforms and the installation of 100 kms of subsea pipelines |
− | * | + | * '''IHI:''' FPSO construction |
− | + | === History === | |
* 2002 - Stolt Offshore Awarded Contract for offshore platforms | * 2002 - Stolt Offshore Awarded Contract for offshore platforms | ||
* 2005 - Sanha produces first condensate | * 2005 - Sanha produces first condensate | ||
+ | * 2024 - Sanha Lean Gas Connection (SLGC) project completed | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [[Serimax Pipeline References]] | # [[Serimax Pipeline References]] | ||
# [http://killajoules.wikidot.com/archive:stolt-offshore-awarded-240-million-contract-in-angol/ Stolt Offshore Awarded $240 Million Contract In Angola] | # [http://killajoules.wikidot.com/archive:stolt-offshore-awarded-240-million-contract-in-angol/ Stolt Offshore Awarded $240 Million Contract In Angola] | ||
# [http://killajoules.wikidot.com/archive:chevrontexaco-announces-first-oil-from-angolas-bombo ChevronTexaco Announces First Oil from Angolas Bomboco Field] | # [http://killajoules.wikidot.com/archive:chevrontexaco-announces-first-oil-from-angolas-bombo ChevronTexaco Announces First Oil from Angolas Bomboco Field] | ||
# [http://killajoules.wikidot.com/archive:chevrontexaco-press-release-chevrontexaco-announces ChevronTexaco Announces First Condensate From Angolas Sanha Field] | # [http://killajoules.wikidot.com/archive:chevrontexaco-press-release-chevrontexaco-announces ChevronTexaco Announces First Condensate From Angolas Sanha Field] | ||
+ | # [https://a-barrel-full.blogspot.com/2025/01/sanha-lean-gas-connection-achieves.html Sanha lean gas connection achieves first gas] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:Angola]] | ||
+ | [[category:Chevron]] |
Revision as of 15:54, 1 January 2025
Summary Information
- Operator: Chevron
- Country: Angola
- Location: Block 0, Offshore
- Production start: 2005
- Partners: Sonangol, Chevron, Agip and Total
- Type: Oil, Gas and Condensate
- Estimated Reserves:
- Production Volume:
Description
- The development includes the Sanha Condensate Field and the Bomboco Oil Field
- The Sanha complex is capable of re-injecting 500 million cubic feet of produced gas per day.
- The field utilises the Sanha LPG FPSO, the worlds first LPG processing FPSO
- With the completion of the Sanha Lean Gas Connection (SLGC) project, gas is supplied to Angola Soyo LNG Terminal
Contractors
- SBM Offshore: Provision of FPSO
- Stolt Offshore: Engineering, fabrication and installation of five offshore platforms with two linking bridges, the modification of three existing platforms and the installation of 100 kms of subsea pipelines
- IHI: FPSO construction
History
- 2002 - Stolt Offshore Awarded Contract for offshore platforms
- 2005 - Sanha produces first condensate
- 2024 - Sanha Lean Gas Connection (SLGC) project completed