Difference between revisions of "Suizhong 36-1 Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: CNOOC * Country: China * Location: Bohai Bay * Production start: 1993 * Partners: * Type: Oil * Estimated Reserves: * Production Volume:...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: CNOOC | * Operator: CNOOC | ||
* Country: China | * Country: China | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* The field has been developed in two stages | * The field has been developed in two stages | ||
* Phase I consisted of three platforms | * Phase I consisted of three platforms | ||
Line 17: | Line 17: | ||
* Suizhong 36-1 Phase II Adjustment project involved the addition of 4 new platforms | * Suizhong 36-1 Phase II Adjustment project involved the addition of 4 new platforms | ||
− | + | === Contractors === | |
* **HHI:** CEP Platform - EPIC | * **HHI:** CEP Platform - EPIC | ||
* **COOEC:** | * **COOEC:** | ||
Line 26: | Line 26: | ||
* **TTOE:** SZ36-1 Transformer Lifting Project | * **TTOE:** SZ36-1 Transformer Lifting Project | ||
− | + | === History === | |
* 1987 - Suizhong 36-1 oilfield was discovered | * 1987 - Suizhong 36-1 oilfield was discovered | ||
* 1993 - Phase one oil production started | * 1993 - Phase one oil production started | ||
Line 34: | Line 34: | ||
* 2013 - Suizhong 36-1 Phase II Adjustment project Starts Production | * 2013 - Suizhong 36-1 Phase II Adjustment project Starts Production | ||
− | + | === Geology === | |
* The Suizhong 36-1 oil field is a large heavy oil field, characterized by loose oil reservoir, strong heterogeneity, high viscosity and low oil/gas ratio. | * The Suizhong 36-1 oil field is a large heavy oil field, characterized by loose oil reservoir, strong heterogeneity, high viscosity and low oil/gas ratio. | ||
− | + | === Links === | |
+ | # [[BOMESC Offshore Engineering Topsides Modules References]] | ||
# [[Hyundai Heavy Industries Platform References]] | # [[Hyundai Heavy Industries Platform References]] | ||
# [[International Protective Coatings Platform References]] | # [[International Protective Coatings Platform References]] | ||
Line 51: | Line 52: | ||
# [http://killajoules.wikidot.com/archive:equipment-malfunction-of-central-control-system-caus Equipment Malfunction of Central Control System Causes Minor Oil Leak in Suizhong 36-1 Oilfield] | # [http://killajoules.wikidot.com/archive:equipment-malfunction-of-central-control-system-caus Equipment Malfunction of Central Control System Causes Minor Oil Leak in Suizhong 36-1 Oilfield] | ||
# [http://killajoules.wikidot.com/archive:suizhong-36-1-phase-ii-adjustment-project-starts-pro Suizhong 36-1 Phase II Adjustment project Starts Production] | # [http://killajoules.wikidot.com/archive:suizhong-36-1-phase-ii-adjustment-project-starts-pro Suizhong 36-1 Phase II Adjustment project Starts Production] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:China]] | ||
+ | [[category:CNOOC]] |
Latest revision as of 13:52, 17 November 2023
Summary Information
- Operator: CNOOC
- Country: China
- Location: Bohai Bay
- Production start: 1993
- Partners:
- Type: Oil
- Estimated Reserves:
- Production Volume:
Description
- The field has been developed in two stages
- Phase I consisted of three platforms
- Phase II consists of one central processing platform, six wellhead platforms, one 70-kilometer oil pipeline to onshore, twelve subsea pipelines that run between platforms, five subsea electric cables, one onshore terminal
- The field acts as a hub for a number of satellites including LD 4-2, LD10-1 & LD5-2
- The development of LD 4-2 consists of 1 wellhead platform, a subsea pipeline and two cables
- Suizhong 36-1 Phase II Adjustment project involved the addition of 4 new platforms
Contractors
- **HHI:** CEP Platform - EPIC
- **COOEC:**
- Jacket & Modules for phase 1
- Topsides for phase 2
- SZ36-1 WHP - Jacket, Deck, Heli-deck & Topside
- **BOMESC:** SZ36-1 Living Quarters, including deck & helideck
- **TTOE:** SZ36-1 Transformer Lifting Project
History
- 1987 - Suizhong 36-1 oilfield was discovered
- 1993 - Phase one oil production started
- 2001 - Phase two production commenced
- 2005 - LD 5-2 & LD 4-2 came onstream
- 2011 - A minor oil leak occurred due to equipment malfunction
- 2013 - Suizhong 36-1 Phase II Adjustment project Starts Production
Geology
- The Suizhong 36-1 oil field is a large heavy oil field, characterized by loose oil reservoir, strong heterogeneity, high viscosity and low oil/gas ratio.
Links
- BOMESC Offshore Engineering Topsides Modules References
- Hyundai Heavy Industries Platform References
- International Protective Coatings Platform References
- Jotun Asia Platform References
- Tianjin Timeast Offshore Engineering Platform References
- The Discovery and Development of SZ 36-1 Oil Field in Liadodong Bay
- Suizhong 36-1 (Phase II-2) Begin Production
- CNOOC Limited Announces Start-up of Two New Wellhead Platforms of Suizhong 36-1 Field
- Suizhong 36-1 (Phase II) on Full-scale Production
- Commercial Production Started From LD 5-2 in Bohai Bay
- CNOOC Ltd. Starts Oil Production In LD 4-2 Ahead of Schedule
- Suizhong 36-1 Oilfield Production Reaches 50 Million Tons
- Equipment Malfunction of Central Control System Causes Minor Oil Leak in Suizhong 36-1 Oilfield
- Suizhong 36-1 Phase II Adjustment project Starts Production