Suizhong 36-1 Oil Field
Jump to navigation
Jump to search
Summary Information
- Operator: CNOOC
- Country: China
- Location: Bohai Bay
- Production start: 1993
- Partners:
- Type: Oil
- Estimated Reserves:
- Production Volume:
Description
- The field has been developed in two stages
- Phase I consisted of three platforms
- Phase II consists of one central processing platform, six wellhead platforms, one 70-kilometer oil pipeline to onshore, twelve subsea pipelines that run between platforms, five subsea electric cables, one onshore terminal
- The field acts as a hub for a number of satellites including LD 4-2, LD10-1 & LD5-2
- The development of LD 4-2 consists of 1 wellhead platform, a subsea pipeline and two cables
- Suizhong 36-1 Phase II Adjustment project involved the addition of 4 new platforms
Contractors
- **HHI:** CEP Platform - EPIC
- **COOEC:**
- Jacket & Modules for phase 1
- Topsides for phase 2
- SZ36-1 WHP - Jacket, Deck, Heli-deck & Topside
- **BOMESC:** SZ36-1 Living Quarters, including deck & helideck
- **TTOE:** SZ36-1 Transformer Lifting Project
History
- 1987 - Suizhong 36-1 oilfield was discovered
- 1993 - Phase one oil production started
- 2001 - Phase two production commenced
- 2005 - LD 5-2 & LD 4-2 came onstream
- 2011 - A minor oil leak occurred due to equipment malfunction
- 2013 - Suizhong 36-1 Phase II Adjustment project Starts Production
Geology
- The Suizhong 36-1 oil field is a large heavy oil field, characterized by loose oil reservoir, strong heterogeneity, high viscosity and low oil/gas ratio.
Links
- BOMESC Offshore Engineering Topsides Modules References
- Hyundai Heavy Industries Platform References
- International Protective Coatings Platform References
- Jotun Asia Platform References
- Tianjin Timeast Offshore Engineering Platform References
- The Discovery and Development of SZ 36-1 Oil Field in Liadodong Bay
- Suizhong 36-1 (Phase II-2) Begin Production
- CNOOC Limited Announces Start-up of Two New Wellhead Platforms of Suizhong 36-1 Field
- Suizhong 36-1 (Phase II) on Full-scale Production
- Commercial Production Started From LD 5-2 in Bohai Bay
- CNOOC Ltd. Starts Oil Production In LD 4-2 Ahead of Schedule
- Suizhong 36-1 Oilfield Production Reaches 50 Million Tons