Difference between revisions of "PM-3 CAA Oil And Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Operator: | + | * Operator: Repsol |
* Country: Malaysia | * Country: Malaysia | ||
* Location: PM-3 | * Location: PM-3 | ||
Line 46: | Line 46: | ||
=== Links === | === Links === | ||
+ | # [[Aquila Mooring Solutions FPSO References]] | ||
# [[MMCOG Platform References]] | # [[MMCOG Platform References]] | ||
# [[Icon Engineering Platform References]] | # [[Icon Engineering Platform References]] | ||
Line 61: | Line 62: | ||
# [http://killajoules.wikidot.com/archive:fso-orkid-successfully-received-first-oil FSO Orkid successfully received first oil] | # [http://killajoules.wikidot.com/archive:fso-orkid-successfully-received-first-oil FSO Orkid successfully received first oil] | ||
# [https://abarrelfull.blogspot.com/2023/10/repsol-reaches-agreement-with-talisman.html Repsol reaches an agreement with Talisman Energy to acquire the Canadian oil company] | # [https://abarrelfull.blogspot.com/2023/10/repsol-reaches-agreement-with-talisman.html Repsol reaches an agreement with Talisman Energy to acquire the Canadian oil company] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:Malaysia]] | ||
+ | [[category:Repsol]] |
Revision as of 10:01, 13 November 2023
Summary Information
- Operator: Repsol
- Country: Malaysia
- Location: PM-3
- Production start: 1997
- Partners:
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- The PM-3 CAA project, which involves development of the West Bunga Kekwa, East Bunga Kekwa-Cai Nuoc, East Bunga Raya, West Bunga Raya, NW Bunga Raya, Bunga Tulip and Bunga Seroja fields
- Four wellhead platforms, a central processing platform, compression annex platform, floating storage offloading vessel and inter-field pipelines have been installed.
- These facilities have a production capacity of 60,000 bbls/d of oil and 270 mmcf/d of gas.
- The Bunga Orkid/Bunga Pakma gas field complex was developed as phase three and includes Bunga Orkid-A platform and FSO Orkid
- Gas is supplied via a 24-inch 170 km pipeline from PM-3 CAA to the Resak Platform
Contractors
- **MMCOG:**
- Detailed Design of Bunga Kekwa 'C' (BK-C) Annex Topside
- Detailed Design of Bunga Kekwa 'C' (BK-C) Annex Substructure
- **Hyundai Heavy Industries:** Phase 2 Topside
- **FoundOcean:** Bunga Raya 'A'
- **MMHE:**
- B. Raya E - Jacket
- Conversion of FSO Orkid
- **SDE:** Bunga Raya E - Deck, Topside
- **Kavin Engineering:** TML Bunga RAYA-A (BR-A) Platform, Sand Cleaning System
- **Petrofac RNZ:** Bunga Tulip “A” Development
- **Bluewater:** External Turret Mooring system for FSO Orkid
- **BC Petrochemical:** Chemical Injection System
- **ICON Engineering:**
- Conceptual design & installation engineering, followed by the structural & geotechnical detailed design for the BR-A Annexe Monopods
- Bunga Kekwa C Annexe Platform, Conceptual Design and Installation
History
- 1997 - Phase 1 oil production commenced
- 2003 - phase 2 start up
- 2006 - Bunga Tulip came onstream
- 2008 - FSO Orkid was completed
- 2009 - Phase 3 production starts
- 2014 - Repsol acquired Talisman and became a partner
Geology
Links
- Aquila Mooring Solutions FPSO References
- MMCOG Platform References
- Icon Engineering Platform References
- Jotun Platform References
- Hyundai Heavy Industries Platform References
- FoundOcean Subsea References
- Kavin Engineering Oil And Gas Processing References
- Anggerik Laksana Platform References
- Bluewater Mooring References
- Petrofac RNZ Offshore And Platform References
- BC Petrochemical Oil And Gas Processing References
- Fiberbond Offshore Platform References
- Talisman Announces First Oil From The PM-3 CAA Phase 2 & 3 Project In The Overlapping Area Between Malaysia And Vietnam
- MMHE Completed Another Conversion
- FSO Orkid successfully received first oil
- Repsol reaches an agreement with Talisman Energy to acquire the Canadian oil company