Difference between revisions of "Quiluma and Maboqueiro Oil Fields"

From A Barrel Full
Jump to navigation Jump to search
Line 6: Line 6:
 
* Partners: Eni (operator with 25.6%), Chevron (31%), Sonangol P&P (19.8%) and bp (11.8%)
 
* Partners: Eni (operator with 25.6%), Chevron (31%), Sonangol P&P (19.8%) and bp (11.8%)
 
* Type: Gas
 
* Type: Gas
* Estimated Reserves:  
+
* Estimated Reserves: 1.5 trillion cubic feet of gas
 
* Production Volume: Expected production of 330 mmscf/day at plateau (approximately 4 billion cubic meters/year)
 
* Production Volume: Expected production of 330 mmscf/day at plateau (approximately 4 billion cubic meters/year)
  

Revision as of 16:26, 8 August 2022

Summary Information

  • Operator: ENI
  • Country: Angola
  • Location:
  • Production start: 2026
  • Partners: Eni (operator with 25.6%), Chevron (31%), Sonangol P&P (19.8%) and bp (11.8%)
  • Type: Gas
  • Estimated Reserves: 1.5 trillion cubic feet of gas
  • Production Volume: Expected production of 330 mmscf/day at plateau (approximately 4 billion cubic meters/year)

Description

  • The project includes two offshore wellhead platforms, an onshore gas processing plant and a connection to Angola Soyo LNG Terminal for the marketing of condensates and gas via LNG cargoes

Contractors

  • -

History

  • 2022 - Final investment decision for the project

Geology

Links

  1. Angola: TotalEnergies is Rolling out its Multi-Energy Strategy by Launching Three Projects in Oil, Gas and Solar Energy