Quiluma and Maboqueiro Oil Fields

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: ENI
  • Country: Angola
  • Location:
  • Production start: 2026
  • Partners: Eni (operator with 25.6%), Chevron (31%), Sonangol P&P (19.8%) and bp (11.8%)
  • Type: Gas
  • Estimated Reserves: 1.5 trillion cubic feet of gas
  • Production Volume: Expected production of 330 mmscf/day at plateau (approximately 4 billion cubic meters/year)

Description

  • The project includes two offshore wellhead platforms, an onshore gas processing plant and a connection to Angola Soyo LNG Terminal for the marketing of condensates and gas via LNG cargoes

Contractors

  • Saipem: Engineering, procurement and construction, including hook-up and commissioning assistance, of the Quiluma platform and of the onshore natural gas processing plant

History

  • 2022 - Final investment decision for the project
  • 2022 - Saipem awarded EPC contract