(Created page with "Summary Information * Operator: Taqa * Country: UK * Location: North Sea * Production start: 1996 * Partners: * Type: Oil & Gas * Estimated Reserves: * Production Volume:...")
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
 
* Operator: Taqa
 
* Operator: Taqa
 
* Country: UK
 
* Country: UK
Line 9: Line 9:
 
* Production Volume:  
 
* Production Volume:  
  
+++ Description
+
=== Description ===
 
* The field was initially developed from two pools of oil: Harding Central and South. Since then, two further pools have been developed: Harding South East and by extended reach drilling, Harding North.  
 
* The field was initially developed from two pools of oil: Harding Central and South. Since then, two further pools have been developed: Harding South East and by extended reach drilling, Harding North.  
 +
* The '''Morrone field''' (block 9/23b) is 5 km south of the Harding platform. The initial phase of development will consist of an extended reach well drilled from Harding.
 
* The oil from the Harding field requires a form of offshore storage. This is because the crude is heavy and naphthenic
 
* The oil from the Harding field requires a form of offshore storage. This is because the crude is heavy and naphthenic
 
* The field utilises a steel self elevating production jackup
 
* The field utilises a steel self elevating production jackup
Line 16: Line 17:
 
* From here, gas is transported to the [[Sage St Fergus Gas Processing Terminal]] via the [[Scottish Area Gas Evacuation (SAGE) Pipeline]]
 
* From here, gas is transported to the [[Sage St Fergus Gas Processing Terminal]] via the [[Scottish Area Gas Evacuation (SAGE) Pipeline]]
  
+++ Contractors
+
=== Contractors ===
 
* **Hyundai:** Construction of the production drilling and accommodation facility  
 
* **Hyundai:** Construction of the production drilling and accommodation facility  
 
* **Aker Marine:** Harding installation
 
* **Aker Marine:** Harding installation
Line 22: Line 23:
 
* **AMEC:**  Engineering and project management contract for Harding offshore gas project
 
* **AMEC:**  Engineering and project management contract for Harding offshore gas project
  
+++ History
+
=== History ===
 
* 1987 - Harding was discovered
 
* 1987 - Harding was discovered
 
* 1993 - HHI awarded platform contract
 
* 1993 - HHI awarded platform contract
Line 28: Line 29:
 
* 2006 - BP & Maersk Oil Approve Front End Engineering & Design for Harding Area Gas Project
 
* 2006 - BP & Maersk Oil Approve Front End Engineering & Design for Harding Area Gas Project
 
* 2012 - BP sells the field to Taqa
 
* 2012 - BP sells the field to Taqa
 +
* 2013 - Approval awarded for Morrone field
  
+++ Geology
+
=== Geology
 
*  
 
*  
  
+++ Links
+
=== Links ===
 
# [http://www.bp.com/liveassets/bp_internet/globalbp/STAGING/global_assets/downloads/U/uk_asset_harding.pdf The Harding Field, BP]
 
# [http://www.bp.com/liveassets/bp_internet/globalbp/STAGING/global_assets/downloads/U/uk_asset_harding.pdf The Harding Field, BP]
 +
# [[UK Oil and Gas Fields by Approval Date]]
 
# [[Hyundai Heavy Industries Platform References]]
 
# [[Hyundai Heavy Industries Platform References]]
 
# [[List Of Oil Production Platforms In The UK]]
 
# [[List Of Oil Production Platforms In The UK]]

Revision as of 14:06, 31 August 2023

Summary Information

  • Operator: Taqa
  • Country: UK
  • Location: North Sea
  • Production start: 1996
  • Partners:
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The field was initially developed from two pools of oil: Harding Central and South. Since then, two further pools have been developed: Harding South East and by extended reach drilling, Harding North.
  • The Morrone field (block 9/23b) is 5 km south of the Harding platform. The initial phase of development will consist of an extended reach well drilled from Harding.
  • The oil from the Harding field requires a form of offshore storage. This is because the crude is heavy and naphthenic
  • The field utilises a steel self elevating production jackup
  • Gas is exported by a subsea tie-back of the Devenick Gas Field and a gas export pipeline to connect the gas platform to the Brae gas transmission pipeline
  • From here, gas is transported to the Sage St Fergus Gas Processing Terminal via the Scottish Area Gas Evacuation (SAGE) Pipeline

Contractors

  • **Hyundai:** Construction of the production drilling and accommodation facility
  • **Aker Marine:** Harding installation
  • **Aker Solutions:** Gas Processing - conceptual, FEED and detailed engineering
  • **AMEC:** Engineering and project management contract for Harding offshore gas project

History

  • 1987 - Harding was discovered
  • 1993 - HHI awarded platform contract
  • 2005 - AMEC wins engineering and project management contract for gas project
  • 2006 - BP & Maersk Oil Approve Front End Engineering & Design for Harding Area Gas Project
  • 2012 - BP sells the field to Taqa
  • 2013 - Approval awarded for Morrone field

=== Geology

Links

  1. The Harding Field, BP
  2. UK Oil and Gas Fields by Approval Date
  3. Hyundai Heavy Industries Platform References
  4. List Of Oil Production Platforms In The UK
  5. FoundOcean Europe Subsea References
  6. Aker Solutions Oil And Gas Processing References
  7. AMEC wins engineering and project management contract for BP Harding offshore gas project
  8. BP & Maersk Oil Approve Front End Engineering & Design for Harding Area Gas Project
  9. BP to Sell Package of Central North Sea Assets to Taqa for $1.1 Billion
  10. Update On UK North Sea Harding Platform Incident