Difference between revisions of "Sanha-Bomboco Oil and Gas Field"

From A Barrel Full
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 11: Line 11:
 
=== Description ===
 
=== Description ===
 
* The development includes the Sanha Condensate Field and the Bomboco Oil Field
 
* The development includes the Sanha Condensate Field and the Bomboco Oil Field
 +
* The complex comprises a drilling production platform (DPP), a process and compression platform (PCP), and a quarters platform.
 
* The Sanha complex is capable of re-injecting 500 million cubic feet of produced gas per day.
 
* The Sanha complex is capable of re-injecting 500 million cubic feet of produced gas per day.
 
* The field utilises the [[Sanha LPG FPSO]], the worlds first LPG processing FPSO
 
* The field utilises the [[Sanha LPG FPSO]], the worlds first LPG processing FPSO
Line 19: Line 20:
 
* '''Stolt Offshore:''' Engineering, fabrication and installation of five offshore platforms with two linking bridges, the modification of three existing platforms and the installation of 100 kms of  subsea pipelines
 
* '''Stolt Offshore:''' Engineering, fabrication and installation of five offshore platforms with two linking bridges, the modification of three existing platforms and the installation of 100 kms of  subsea pipelines
 
* '''IHI:''' FPSO construction
 
* '''IHI:''' FPSO construction
 +
 +
==== Sanha Lean Gas Connection (SLGC) project ====
 +
* '''Subsea 7:''' construction and installation of the Lean Gas Platform (LGP) system
  
 
=== History ===
 
=== History ===
 
* 2002 - Stolt Offshore Awarded Contract for offshore platforms
 
* 2002 - Stolt Offshore Awarded Contract for offshore platforms
 
* 2005 - Sanha produces first condensate
 
* 2005 - Sanha produces first condensate
 +
* 2021 - Subsea 7 awarded SLGC contract
 
* 2024 - Sanha Lean Gas Connection (SLGC) project completed
 
* 2024 - Sanha Lean Gas Connection (SLGC) project completed
  
Line 33: Line 38:
 
# [http://killajoules.wikidot.com/archive:chevrontexaco-announces-first-oil-from-angolas-bombo ChevronTexaco Announces First Oil from Angolas Bomboco Field]
 
# [http://killajoules.wikidot.com/archive:chevrontexaco-announces-first-oil-from-angolas-bombo ChevronTexaco Announces First Oil from Angolas Bomboco Field]
 
# [http://killajoules.wikidot.com/archive:chevrontexaco-press-release-chevrontexaco-announces  ChevronTexaco Announces First Condensate From Angolas Sanha Field]
 
# [http://killajoules.wikidot.com/archive:chevrontexaco-press-release-chevrontexaco-announces  ChevronTexaco Announces First Condensate From Angolas Sanha Field]
 +
# [https://abarrelfull.blogspot.com/2025/01/subsea-7-awarded-contract-offshore.html Subsea 7 awarded contract offshore Angola]
 
# [https://a-barrel-full.blogspot.com/2025/01/sanha-lean-gas-connection-achieves.html Sanha lean gas connection achieves first gas]
 
# [https://a-barrel-full.blogspot.com/2025/01/sanha-lean-gas-connection-achieves.html Sanha lean gas connection achieves first gas]
  

Latest revision as of 16:00, 1 January 2025

Summary Information

  • Operator: Chevron
  • Country: Angola
  • Location: Block 0, Offshore
  • Production start: 2005
  • Partners: Sonangol, Chevron, Agip and Total
  • Type: Oil, Gas and Condensate
  • Estimated Reserves:
  • Production Volume:

Description

  • The development includes the Sanha Condensate Field and the Bomboco Oil Field
  • The complex comprises a drilling production platform (DPP), a process and compression platform (PCP), and a quarters platform.
  • The Sanha complex is capable of re-injecting 500 million cubic feet of produced gas per day.
  • The field utilises the Sanha LPG FPSO, the worlds first LPG processing FPSO
  • With the completion of the Sanha Lean Gas Connection (SLGC) project, gas is supplied to Angola Soyo LNG Terminal

Contractors

  • SBM Offshore: Provision of FPSO
  • Stolt Offshore: Engineering, fabrication and installation of five offshore platforms with two linking bridges, the modification of three existing platforms and the installation of 100 kms of subsea pipelines
  • IHI: FPSO construction

Sanha Lean Gas Connection (SLGC) project

  • Subsea 7: construction and installation of the Lean Gas Platform (LGP) system

History

  • 2002 - Stolt Offshore Awarded Contract for offshore platforms
  • 2005 - Sanha produces first condensate
  • 2021 - Subsea 7 awarded SLGC contract
  • 2024 - Sanha Lean Gas Connection (SLGC) project completed

Geology

Links

  1. Serimax Pipeline References
  2. Stolt Offshore Awarded $240 Million Contract In Angola
  3. ChevronTexaco Announces First Oil from Angolas Bomboco Field
  4. ChevronTexaco Announces First Condensate From Angolas Sanha Field
  5. Subsea 7 awarded contract offshore Angola
  6. Sanha lean gas connection achieves first gas