* 2012 - BP sells the field to Taqa | * 2012 - BP sells the field to Taqa | ||
* 2013 - Approval awarded for Morrone field | * 2013 - Approval awarded for Morrone field | ||
| + | * 2015 - Approval granted for decommissioning | ||
=== Geology | === Geology | ||
| Line 37: | Line 38: | ||
# [http://www.bp.com/liveassets/bp_internet/globalbp/STAGING/global_assets/downloads/U/uk_asset_harding.pdf The Harding Field, BP] | # [http://www.bp.com/liveassets/bp_internet/globalbp/STAGING/global_assets/downloads/U/uk_asset_harding.pdf The Harding Field, BP] | ||
# [[UK Oil and Gas Fields by Approval Date]] | # [[UK Oil and Gas Fields by Approval Date]] | ||
| + | # [[UK Oil and Gas Field Approved Decommissioning Programmes]] | ||
# [[Hyundai Heavy Industries Platform References]] | # [[Hyundai Heavy Industries Platform References]] | ||
# [[List Of Oil Production Platforms In The UK]] | # [[List Of Oil Production Platforms In The UK]] | ||
| Line 49: | Line 51: | ||
[[Category:UK]] | [[Category:UK]] | ||
[[Category:Taqa]] | [[Category:Taqa]] | ||
| + | [[category:Decommissioned]] | ||
Latest revision as of 13:00, 25 June 2024
Summary Information
- Operator: Taqa
- Country: UK
- Location: North Sea
- Production start: 1996
- Partners:
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- The field was initially developed from two pools of oil: Harding Central and South. Since then, two further pools have been developed: Harding South East and by extended reach drilling, Harding North.
- The Morrone field (block 9/23b) is 5 km south of the Harding platform. The initial phase of development will consist of an extended reach well drilled from Harding.
- The oil from the Harding field requires a form of offshore storage. This is because the crude is heavy and naphthenic
- The field utilises a steel self elevating production jackup
- Gas is exported by a subsea tie-back of the Devenick Gas Field and a gas export pipeline to connect the gas platform to the Brae gas transmission pipeline
- From here, gas is transported to the SAGE St Fergus Gas Processing Terminal via the Scottish Area Gas Evacuation (SAGE) Pipeline
Contractors
- **Hyundai:** Construction of the production drilling and accommodation facility
- **Aker Marine:** Harding installation
- **Aker Solutions:** Gas Processing - conceptual, FEED and detailed engineering
- **AMEC:** Engineering and project management contract for Harding offshore gas project
History
- 1987 - Harding was discovered
- 1993 - HHI awarded platform contract
- 2005 - AMEC wins engineering and project management contract for gas project
- 2006 - BP & Maersk Oil Approve Front End Engineering & Design for Harding Area Gas Project
- 2012 - BP sells the field to Taqa
- 2013 - Approval awarded for Morrone field
- 2015 - Approval granted for decommissioning
=== Geology
Links
- The Harding Field, BP
- UK Oil and Gas Fields by Approval Date
- UK Oil and Gas Field Approved Decommissioning Programmes
- Hyundai Heavy Industries Platform References
- List Of Oil Production Platforms In The UK
- FoundOcean Europe Subsea References
- Aker Solutions Oil And Gas Processing References
- AMEC wins engineering and project management contract for BP Harding offshore gas project
- BP & Maersk Oil Approve Front End Engineering & Design for Harding Area Gas Project
- BP to Sell Package of Central North Sea Assets to Taqa for $1.1 Billion
- Update On UK North Sea Harding Platform Incident