Summary Information
+
=== Summary Information ===
* Operator: Tullow
+
* Operator: Harbour Energy
 
* Country: UK  
 
* Country: UK  
 
* Location: Southern North Sea
 
* Location: Southern North Sea
Line 9: Line 9:
 
* Production Volume:  
 
* Production Volume:  
  
+++ Description
+
=== Description ===
 +
* The fields are no longer in production
 
* The Caister platform is a small unmanned facility
 
* The Caister platform is a small unmanned facility
 
* Murdoch has two small unmanned platforms, one of which is for gas compression
 
* Murdoch has two small unmanned platforms, one of which is for gas compression
Line 17: Line 18:
 
* Gas is transported to the [[Theddlethorpe Gas Processing Plant]].
 
* Gas is transported to the [[Theddlethorpe Gas Processing Plant]].
  
+++ Contractors
+
=== Contractors ===
* **HSM Offshore:** Murdoch CMS III Compression module
+
* '''HSM Offshore:''' Murdoch CMS III Compression module
* **Seaway Heavy Lifting:** T & I - CMS-2 Compression Platform and Murdoch Modules and Caissons
+
* '''Seaway Heavy Lifting:''' T & I - CMS-2 Compression Platform and Murdoch Modules and Caissons
* **FoundOcean:** Murdoch Riser
+
* '''FoundOcean:''' Murdoch Riser
* **Bibby Offshore:** Hunter Flowline Isolation
+
* '''Bibby Offshore:''' Hunter Flowline Isolation
* **J P Kenny:** Materials selection, detailed design and specification pipework associated with wellhead protection structures
+
* '''J P Kenny:''' Materials selection, detailed design and specification pipework associated with wellhead protection structures
* **Stolt Offshore:** CMS III subsea installation
+
* '''Stolt Offshore:''' CMS III subsea installation
* **Global Maritime:** Warranty surveyor for installation of infield flowlines (10”/12”) and umbilical, and subsequent trenching operations - CMS-III Project
+
* '''Global Maritime:''' Warranty surveyor for installation of infield flowlines (10”/12”) and umbilical, and subsequent trenching operations - CMS-III Project
  
  
+++ History
+
=== History ===
 
* 1992 - Project development approved by UK Government for both Murdoch & Caister
 
* 1992 - Project development approved by UK Government for both Murdoch & Caister
 
* 1993 - First gas produced
 
* 1993 - First gas produced
Line 33: Line 34:
 
* 2001 - BP sells ARCO's share of the field to Tullow
 
* 2001 - BP sells ARCO's share of the field to Tullow
 
* 2002 - First gas produced from Murdoch K
 
* 2002 - First gas produced from Murdoch K
 +
* 2005 - Approval for Hunter development
 +
* 2020 - Approval granted for Caister decommissioning
 +
* 2022 - Approval granted for decommissioning
  
+++ Geology
+
=== Geology ===
 
*  
 
*  
  
+++ Links
+
=== Links ===
 
# [[UK Oil and Gas Fields by Approval Date]]
 
# [[UK Oil and Gas Fields by Approval Date]]
 +
# [[UK Oil and Gas Field Approved Decommissioning Programmes]]
 
# [[List Of Oil and Gas Production Platforms In The UK]]
 
# [[List Of Oil and Gas Production Platforms In The UK]]
 
# [[FoundOcean Subsea References]]
 
# [[FoundOcean Subsea References]]
Line 50: Line 55:
 
# [http://killajoules.wikidot.com/archive:bp-fulfils-ec-undertaking-with-gas-sale-to-tullow-oi BP Fulfils EC Undertaking With Gas Sale To Tullow Oil]
 
# [http://killajoules.wikidot.com/archive:bp-fulfils-ec-undertaking-with-gas-sale-to-tullow-oi BP Fulfils EC Undertaking With Gas Sale To Tullow Oil]
 
# [http://killajoules.wikidot.com/archive:production-commences-from-new-north-sea-gas-field Production Commences from New North Sea Gas Field]
 
# [http://killajoules.wikidot.com/archive:production-commences-from-new-north-sea-gas-field Production Commences from New North Sea Gas Field]
 +
 +
[[category:Field]]
 +
[[category:UK]]
 +
[[category:Harbour Energy]]
 +
[[category:Decommissioned]]

Latest revision as of 16:25, 1 July 2024

Summary Information

  • Operator: Harbour Energy
  • Country: UK
  • Location: Southern North Sea
  • Production start: 1993
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The fields are no longer in production
  • The Caister platform is a small unmanned facility
  • Murdoch has two small unmanned platforms, one of which is for gas compression
  • The CMS III development involved the development of five gas fields: Errol, McAdam, H, Q and, K, with all the fields tied back to the existing Caister Murdoch System
  • The Katy Gas Field, Ketch Gas Field, Cavendish Gas Field and the Kelvin Gas Field are subsea tie backs that use the production and transportation facilities of the Caister Murdoch System (CMS)
  • The **Hunter Gas Field** is a single subsea well tied back via an 8" flexible pipeline and umbilical to the existing Murdoch K subsea template
  • Gas is transported to the Theddlethorpe Gas Processing Plant.

Contractors

  • HSM Offshore: Murdoch CMS III Compression module
  • Seaway Heavy Lifting: T & I - CMS-2 Compression Platform and Murdoch Modules and Caissons
  • FoundOcean: Murdoch Riser
  • Bibby Offshore: Hunter Flowline Isolation
  • J P Kenny: Materials selection, detailed design and specification pipework associated with wellhead protection structures
  • Stolt Offshore: CMS III subsea installation
  • Global Maritime: Warranty surveyor for installation of infield flowlines (10”/12”) and umbilical, and subsequent trenching operations - CMS-III Project


History

  • 1992 - Project development approved by UK Government for both Murdoch & Caister
  • 1993 - First gas produced
  • 2001 - Permission granted for CMS III
  • 2001 - BP sells ARCO's share of the field to Tullow
  • 2002 - First gas produced from Murdoch K
  • 2005 - Approval for Hunter development
  • 2020 - Approval granted for Caister decommissioning
  • 2022 - Approval granted for decommissioning

Geology

Links

  1. UK Oil and Gas Fields by Approval Date
  2. UK Oil and Gas Field Approved Decommissioning Programmes
  3. List Of Oil and Gas Production Platforms In The UK
  4. FoundOcean Subsea References
  5. HSM Offshore Platform References
  6. Seaway Heavy Lifting Oil And Gas References
  7. Bibby Offshore Subsea References
  8. J P Kenny Subsea References
  9. Global Maritime Pipeline References
  10. Serimax Pipeline References
  11. Licences P 450, P 451, P 452 And P 691 - Licences Having Effect Under The Petroleum Act 1998
  12. BP Fulfils EC Undertaking With Gas Sale To Tullow Oil
  13. Production Commences from New North Sea Gas Field