Difference between revisions of "Quiluma and Maboqueiro Oil Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Operator: | + | * Operator: ENI |
− | * Country: | + | * Country: Angola |
* Location: | * Location: | ||
− | * Production start: | + | * Production start: 2026 |
− | * Partners: | + | * Partners: Eni (operator with 25.6%), Chevron (31%), Sonangol P&P (19.8%) and bp (11.8%) |
− | * Type: | + | * Type: Gas |
− | * Estimated Reserves: | + | * Estimated Reserves: 1.5 trillion cubic feet of gas |
− | * Production Volume: | + | * Production Volume: Expected production of 330 mmscf/day at plateau (approximately 4 billion cubic meters/year) |
=== Description === | === Description === | ||
− | * | + | * The project includes two offshore wellhead platforms, an onshore gas processing plant and a connection to [[Angola Soyo LNG Terminal]] for the marketing of condensates and gas via LNG cargoes |
=== Contractors === | === Contractors === | ||
− | * - | + | * '''Saipem:''' Engineering, procurement and construction, including hook-up and commissioning assistance, of the Quiluma platform and of the onshore natural gas processing plant |
=== History === | === History === | ||
* 2022 - Final investment decision for the project | * 2022 - Final investment decision for the project | ||
+ | * 2022 - Saipem awarded EPC contract | ||
=== Geology === | === Geology === | ||
Line 23: | Line 24: | ||
=== Links === | === Links === | ||
# [https://a-barrel-full.blogspot.com/2022/08/angola-totalenergies-is-rolling-out-its.html Angola: TotalEnergies is Rolling out its Multi-Energy Strategy by Launching Three Projects in Oil, Gas and Solar Energy] | # [https://a-barrel-full.blogspot.com/2022/08/angola-totalenergies-is-rolling-out-its.html Angola: TotalEnergies is Rolling out its Multi-Energy Strategy by Launching Three Projects in Oil, Gas and Solar Energy] | ||
+ | # [https://abarrelfull.blogspot.com/2025/01/saipem-three-new-epc-contracts-awarded.html Saipem: three new EPC contracts awarded in Angola for a total amount of around 900 million USD] | ||
Latest revision as of 16:11, 1 January 2025
Summary Information
- Operator: ENI
- Country: Angola
- Location:
- Production start: 2026
- Partners: Eni (operator with 25.6%), Chevron (31%), Sonangol P&P (19.8%) and bp (11.8%)
- Type: Gas
- Estimated Reserves: 1.5 trillion cubic feet of gas
- Production Volume: Expected production of 330 mmscf/day at plateau (approximately 4 billion cubic meters/year)
Description
- The project includes two offshore wellhead platforms, an onshore gas processing plant and a connection to Angola Soyo LNG Terminal for the marketing of condensates and gas via LNG cargoes
Contractors
- Saipem: Engineering, procurement and construction, including hook-up and commissioning assistance, of the Quiluma platform and of the onshore natural gas processing plant
History
- 2022 - Final investment decision for the project
- 2022 - Saipem awarded EPC contract