Difference between revisions of "Plantation Oil Products Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Source: Louisiana * Destination: Washington DC * Ownership: Kinder Morgan * Website: http://www.kindermorgan.com/ * Length: kilometres (3,100 miles)...") |
Abarrelfull (talk | contribs) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 14: | Line 14: | ||
* It delivers approximately 700,000 barrels per day of gasoline, jet fuel, diesel and biodiesel through its 3,100-mile pipeline network, which originates in Louisiana and ends in the Washington, D.C. area. | * It delivers approximately 700,000 barrels per day of gasoline, jet fuel, diesel and biodiesel through its 3,100-mile pipeline network, which originates in Louisiana and ends in the Washington, D.C. area. | ||
* Along the way it serves various metropolitan areas including Birmingham, Alabama; Atlanta, Georgia; Charlotte, North Carolina; and the Washington D.C. area. | * Along the way it serves various metropolitan areas including Birmingham, Alabama; Atlanta, Georgia; Charlotte, North Carolina; and the Washington D.C. area. | ||
| − | * Plantation | + | * Plantation Pipeline connects to 90 shipper delivery terminals throughout eight states |
* Products come into the Plantation system from nine refineries in Mississippi and Louisiana, from other products pipeline systems, and via marine facilities on the Mississippi River. | * Products come into the Plantation system from nine refineries in Mississippi and Louisiana, from other products pipeline systems, and via marine facilities on the Mississippi River. | ||
+++ Refineries Connected to the Pipeline | +++ Refineries Connected to the Pipeline | ||
| − | * [[Alliance Refinery]], [[Baton Rouge Refinery]], [[New Orleans Refinery]], [[Pascagoula Refinery]], [[Placid Refining]] | + | * [[Alliance Refinery]], [[Baton Rouge Refinery]], [[New Orleans Refinery]], [[Pascagoula Refinery]], [[Placid Refining Co]] |
+++ Pipeline Status | +++ Pipeline Status | ||
| Line 25: | Line 25: | ||
+++ History | +++ History | ||
| − | * - | + | * 2020 - Roanoke Expansion completed |
+++ Other Information | +++ Other Information | ||
| Line 33: | Line 33: | ||
+++ Links | +++ Links | ||
| + | # [[EIA Liquids Pipeline Projects 2015-2020]] | ||
# [http://www.kindermorgan.com/business/products_pipelines/plantation.aspx Plantation Pipe Line Company (PPL)] | # [http://www.kindermorgan.com/business/products_pipelines/plantation.aspx Plantation Pipe Line Company (PPL)] | ||
Latest revision as of 17:02, 28 May 2024
Summary Information
- Source: Louisiana
- Destination: Washington DC
- Ownership: Kinder Morgan
- Website: http://www.kindermorgan.com/
- Length: kilometres (3,100 miles)
- Capacity: 700,000 barrels of oil per day
- Crude Type: Refined Products
+++ Brief Description
- Plantation Pipe Line Company (PPL) is is one of the largest refined petroleum products pipelines in the United States.
- It delivers approximately 700,000 barrels per day of gasoline, jet fuel, diesel and biodiesel through its 3,100-mile pipeline network, which originates in Louisiana and ends in the Washington, D.C. area.
- Along the way it serves various metropolitan areas including Birmingham, Alabama; Atlanta, Georgia; Charlotte, North Carolina; and the Washington D.C. area.
- Plantation Pipeline connects to 90 shipper delivery terminals throughout eight states
- Products come into the Plantation system from nine refineries in Mississippi and Louisiana, from other products pipeline systems, and via marine facilities on the Mississippi River.
+++ Refineries Connected to the Pipeline
- Alliance Refinery, Baton Rouge Refinery, New Orleans Refinery, Pascagoula Refinery, Placid Refining Co
+++ Pipeline Status
- In operation
+++ History
- 2020 - Roanoke Expansion completed
+++ Other Information
- -
+++ Links