Difference between revisions of "Wilhelmshaven Floating LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(9 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
* Ownership: Uniper | * Ownership: Uniper | ||
− | * Website: | + | * Website: https://www.uniper.energy/ |
* Location: Wilhelmshaven, | * Location: Wilhelmshaven, | ||
* Capacity: 6 million tons/annum | * Capacity: 6 million tons/annum | ||
Line 8: | Line 8: | ||
=== Brief Description === | === Brief Description === | ||
− | + | * The terminal consists of an FSRU, and a 30 km pipeline to connect it to the grid. | |
+ | * The FRSU will have a total natural gas-send-out capacity of up to 7.5 bcm/a and an LNG storage capacity of 174,000 m³ | ||
=== Technical Details === | === Technical Details === | ||
− | * Storage capacity: | + | * Storage capacity: 174,000 m³ |
* Unloading capacity: | * Unloading capacity: | ||
− | * Send out capacity: | + | * Send out capacity: 7.5 bcm/a |
* Constructor: | * Constructor: | ||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
− | + | * Uniper management expect the project to be completed by [[LNG Terminal Projects to be Completed in 2023 | 2023]] at the latest | |
+ | * The FRSU is supplied by Dynagas | ||
=== Suppliers / Customers === | === Suppliers / Customers === | ||
− | * Suppliers: | + | * Suppliers: Venture Global supplied the first cargo from the [[Calcasieu Pass LNG Export Terminal Project]] |
− | * Customers: | + | * Customers: An approximately 30 km long high-pressure gas pipeline will connect the FSRU to the natural gas pipeline network of Open Grid Europe (OGE) |
=== History === | === History === | ||
− | * | + | * 2022 - Uniper leases the FSRU |
+ | * 2022 - Permits awarded for project construction | ||
+ | * 2023 - The first commercial cargo arrived | ||
+ | * 2024 - KN took over management of the terminal | ||
=== Other Information === | === Other Information === | ||
Line 33: | Line 38: | ||
- | - | ||
=== Links === | === Links === | ||
+ | # [https://abarrelfull.blogspot.com/2022/07/dynagas-ltd-and-uniper-facilitated.html Dynagas Ltd. and Uniper facilitated the charter of two FSRUs for Germany] | ||
# [https://lng-news.blogspot.com/2022/07/construction-of-wilhelmshaven-lng.html Construction of Wilhelmshaven LNG terminal can start quickly] | # [https://lng-news.blogspot.com/2022/07/construction-of-wilhelmshaven-lng.html Construction of Wilhelmshaven LNG terminal can start quickly] | ||
+ | # [https://lng-news.blogspot.com/2023/01/first-lng-cargo-arrives-at-germanys-lng.html First LNG cargo arrives at Germany's LNG terminal in Wilhelmshaven] | ||
+ | # [https://lng-news.blogspot.com/2024/01/kn-becomes-commercial-manager-of-four.html KN Becomes Commercial Manager of Four German LNG Terminals] | ||
[[category:LNG]] | [[category:LNG]] | ||
[[category:Germany]] | [[category:Germany]] | ||
[[category:Uniper]] | [[category:Uniper]] |
Latest revision as of 09:40, 8 January 2024
Contents
Summary Information
- Ownership: Uniper
- Website: https://www.uniper.energy/
- Location: Wilhelmshaven,
- Capacity: 6 million tons/annum
- Status: Under construction
Brief Description
- The terminal consists of an FSRU, and a 30 km pipeline to connect it to the grid.
- The FRSU will have a total natural gas-send-out capacity of up to 7.5 bcm/a and an LNG storage capacity of 174,000 m³
Technical Details
- Storage capacity: 174,000 m³
- Unloading capacity:
- Send out capacity: 7.5 bcm/a
- Constructor:
Ongoing Projects/Project Status
- Uniper management expect the project to be completed by 2023 at the latest
- The FRSU is supplied by Dynagas
Suppliers / Customers
- Suppliers: Venture Global supplied the first cargo from the Calcasieu Pass LNG Export Terminal Project
- Customers: An approximately 30 km long high-pressure gas pipeline will connect the FSRU to the natural gas pipeline network of Open Grid Europe (OGE)
History
- 2022 - Uniper leases the FSRU
- 2022 - Permits awarded for project construction
- 2023 - The first commercial cargo arrived
- 2024 - KN took over management of the terminal
Other Information
-