Difference between revisions of "Borouge Petrochemical Complex"

From A Barrel Full
Jump to navigation Jump to search
Line 20: Line 20:
  
 
=== Products Produced ===
 
=== Products Produced ===
* -
+
* Polyethylene and polypropylene
  
 
=== Projects ===
 
=== Projects ===
Line 31: Line 31:
 
=== History ===
 
=== History ===
 
* 2001 - The Borouge complex begins production
 
* 2001 - The Borouge complex begins production
 +
* 2007 - Contracts awarded for Borouge 2
 +
* 2010 - Borouge 2 began production
  
 
=== Links ===
 
=== Links ===
 +
# [https://abarrelfull.blogspot.com/2023/05/borouge-and-lindeconsolidated.html Borouge and Linde/Consolidated Constructors Int’l Company (CCC) formally sign USD 1.3 billion cracker contract]
 
# [https://abarrelfull.blogspot.com/2023/05/borouge-awards-two-major-contracts-for.html Borouge awards two major contracts for Borouge 2 expansion project]
 
# [https://abarrelfull.blogspot.com/2023/05/borouge-awards-two-major-contracts-for.html Borouge awards two major contracts for Borouge 2 expansion project]
  

Revision as of 09:07, 16 May 2023

Summary Information


Brief Description

  • A large olefins, polyolefins complex. It was built in three stages and a fourth is under construction.

Production Units

  • Borouge 1: Ethane cracker 600,000 kt, polyethylene unit 600 kt
  • Borouge 2
  • Borouge 3


Raw Materials Supply

  • Ethane is provide by ADNOC from its gas processing units
  • Propylene is supplied from the Al-Ruwais Refinery

Products Produced

  • Polyethylene and polypropylene

Projects

Other Information

  • -

History

  • 2001 - The Borouge complex begins production
  • 2007 - Contracts awarded for Borouge 2
  • 2010 - Borouge 2 began production

Links

  1. Borouge and Linde/Consolidated Constructors Int’l Company (CCC) formally sign USD 1.3 billion cracker contract
  2. Borouge awards two major contracts for Borouge 2 expansion project