Difference between revisions of "Quiluma and Maboqueiro Oil Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Operator: | + | * Operator: ENI |
− | * Country: | + | * Country: Angola |
* Location: | * Location: | ||
− | * Production start: | + | * Production start: 2026 |
− | * Partners: | + | * Partners: Eni (operator with 25.6%), Chevron (31%), Sonangol P&P (19.8%) and bp (11.8%) |
− | * Type: | + | * Type: Gas |
− | * Estimated Reserves: | + | * Estimated Reserves: 1.5 trillion cubic feet of gas |
− | * Production Volume: | + | * Production Volume: Expected production of 330 mmscf/day at plateau (approximately 4 billion cubic meters/year) |
=== Description === | === Description === |
Latest revision as of 16:26, 8 August 2022
Summary Information
- Operator: ENI
- Country: Angola
- Location:
- Production start: 2026
- Partners: Eni (operator with 25.6%), Chevron (31%), Sonangol P&P (19.8%) and bp (11.8%)
- Type: Gas
- Estimated Reserves: 1.5 trillion cubic feet of gas
- Production Volume: Expected production of 330 mmscf/day at plateau (approximately 4 billion cubic meters/year)
Description
- The project includes two offshore wellhead platforms, an onshore gas processing plant and a connection to Angola Soyo LNG Terminal for the marketing of condensates and gas via LNG cargoes
Contractors
- -
History
- 2022 - Final investment decision for the project