Difference between revisions of "LNG Terminal Projects Completed in 2018"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with " # Corpus Christi LNG Terminal") |
Abarrelfull (talk | contribs) |
||
| (7 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
| + | === Introduction === | ||
| + | * Global Liquefaction capacity increased by 55.0 million tons in 2018 | ||
| + | * Global Regasification capacity increased by 16.3 million tons in 2018 | ||
| + | === Export Terminals === | ||
| + | # [[Cameroon Hilli FLNG Terminal]] | ||
# [[Corpus Christi LNG Terminal]] | # [[Corpus Christi LNG Terminal]] | ||
| + | # [[Ichthys LNG Terminal]] | ||
| + | # [[Wheatstone LNG Terminal]], second train | ||
| + | |||
| + | === Import Terminals === | ||
| + | # [[Dortyol LNG Terminal]] | ||
| + | # The expansion of [[Revithoussa LNG Terminal]] was completed | ||
Latest revision as of 08:30, 27 June 2022
Introduction
- Global Liquefaction capacity increased by 55.0 million tons in 2018
- Global Regasification capacity increased by 16.3 million tons in 2018
Export Terminals
- Cameroon Hilli FLNG Terminal
- Corpus Christi LNG Terminal
- Ichthys LNG Terminal
- Wheatstone LNG Terminal, second train
Import Terminals
- Dortyol LNG Terminal
- The expansion of Revithoussa LNG Terminal was completed