Ichthys LNG Terminal
Jump to navigation
Jump to search
Contents
Summary Information
- Ownership: Inpex / Total
- INPEX 68.380%
- TOTAL 30.000%
- Osaka Gas 1.200%
- Toho Gas 0.420%
- Website: http://www.inpex.co.jp/
- Location: Blaydin Point on Middle Arm Peninsula in Darwin
- Capacity: 8.4 million tonnes/annum
- Status: In operation
Brief Description
- An LNG terminal project in Australia , owned by Inpex
- Total project CAPEX: More than US$20 billion
Technical Details
- Storage capacity:
- Constructor: **JGC/KBR/CHIYODA:** Engineering, procurement and construction (EPC) activities
- **GE:** is to supply includes four Frame 7EA Gas Turbines and eight MR/PR Compressors for the LNG plant; 10 PGT25+G4 gas turbines and 10 compressors for upstream facilities; and 22 subsea production trees, five off-subsea manifolds, an integrated subsea control system and a 42-inch trunk line connection system
- **CB&I:** Engineering, procurement, construction and pre-commissioning for non-cryogenic storage tanks
- **John Holland**, in a 50:50 joint venture with Macmahon Holdings Ltd, has been awarded a $340 million site development civil works contract
- **Mitsubishi Heavy Industries, Ltd. (MHI)**, has received an order for nine compressors and seven motors to drive the compressors
- **Kentz:** Underground electrical and instrumentation package
- **UGL Kentz JV:** Structural, mechanical and piping (SMP) construction package
- **Technip:**
- Detailed engineering and procurement assistance for the topsides facilities of the 1.2 million barrels storage capacity Ichthys FPSO
- Preparation and execution of the offshore commissioning for the floating, production, storage and offloading (FPSO) unit and the central processing facility
- **Sulzer:** Supplies High Performance Pumps
- **ABB:** Power technologies and medium-voltage drive systems
- Licensor: Air Products
Ongoing Projects/Project Status
- The project was completed in 2018
Suppliers / Customers
- Suppliers:
- The Ichthys Gas Field which contains 12 trillion cubic feet of gas and more than 500 million barrels of condensate
- Customers:
- Chubu Electric Power Co., Inc. 0.49 million tonnes per annum
- Toho Gas Co.,Ltd. 0.28 million tones per annum
- CPC Corporation, Taiwan, 1.75 million tonnes per annum,
- INPEX and a TOTAL affiliate will also take a total of 1.8 million tonnes per annum of LNG
- Tokyo Electric Power Company, Inc . - 1.05 mtpa
- Tokyo Gas Co.,Ltd. - 1.05 mtpa
- The Kansai Electric Power Co., Inc. - 0.80 mtpa
- Osaka Gas Co.,Ltd. - 0.80 mtpa
- Kyushu Electric Power Company Inc. - 0.30 mtpa
History
- 2010, July - Environmental Impact Report Released
- 2010 October - Invitation to Tender for Semi-Submersible Central Processing Facility
- 2011 - The final Environmental Impact Statement (EIS) was delivered to the Australian and Northern Territory governments
- 2011 - INPEX announced that the Ichthys Project Joint Venture (*1) has a clear prospect of completing the sales of the entire 8.4 million tonnes per annum of LNG from the Ichthys Project
- 2011 - Final environmental approval given
- 2011 - INPEX signs sales agreement with five major Japanese utility companies
- 2011 - Osaka Gas takes a small equity stake
- 2012 - Sales agreement signed with CPC, Chubu Electric and Toho Gas
- 2012 - Toho Gas takes a stake in the project
- 2012 - GE Oil & Gas Wins Over $1 Billion in Contracts for the project
- 2012 - JGC/KBR/CHIYODA sign Engineering, procurement and construction (EPC) contract
- 2012 - Production licenses were granted for the Ichthys LNG Project by the Australian Government
- 2012 - John Holland JV Awarded $340 Million Ichthys Onshore LNG Facilities Site Development Contract
- 2012 - Air Products technology selected
- 2012 - Technip awarded a contract covers detailed engineering and procurement assistance for the topsidesfacilities of the 1.2 million barrels storage capacity Ichthys FPSO
- 2012 - Total acquires and additional 6% stake from Inpex
- 2014 - The hull of the FPSO is launched
- 2018 - First LNG produced
Other Information
- -
Links
- JGC/KBR/CHIYODA Joint Venture Awarded Front-End Engineering Design ("FEED") Services Contract for INPEX Ichthys Project
- Ichthys Project Environmental Impact Statement Released
- Financial Results for the six months ended September 30, 2008
- Total and INPEX launch the offshore FEED for the Ichthys LNG project in Australia
- Ichthys LNG Project Releases Invitation to Tender for Semi-Submersible Central Processing Facility
- ITT released for Ichthys CPF
- ABB wins orders worth $80 million for one of Australia’s largest oil and gas developments
- Community Concerns Addressed in Final Environmental Impact Statement For Ichthys LNG Project
- Two LNG Projects ‐ Ichthys and Abadi
- Liquefied Natural Gas (LNG) sales of Ichthys Project, Australia
- Federal environmental approval for Inpex's Ichthys project
- Clough DORIS receive LOI for Ichthys
- INPEX signs Liquefied Natural Gas (LNG) sales agreement with five major Japanese utility companies, Ichthys Project, Australia
- NPEX signs Liquefied Natural Gas (LNG) sales agreement with CPC, Chubu Electric and Toho Gas, Ichthys LNG Project, Australia
- Transfer of the Ichthys LNG project equity interest to Toho Gas Co., Ltd.
- Ichthys LNG Project Achieves FID and JGC/KBR/Chiyoda Joint Venture (JKC JV) Executes Letter of Award for Initial EPC Activities
- KBR and Its Joint Venture Partners (JKC JV) Sign Contract for EPC Activities for Ichthys LNG Project, Australia
- The Production Licenses granted on Ichthys LNG Project - Australia
- John Holland JV Awarded $340 Million Ichthys Onshore LNG Facilities Site Development Contract
- MCO Receives Order for 9 Compressors For Ichthys LNG Project in Australia
- Air Products Wins Technology Selection for Ichthys LNG Project in Australia
- Wood Group Mustang awarded topsides engineering for world’s largest semi-submersible production facility
- Technip awarded contract for Ichthys FPSO unit
- Australia: Total increases its stake in Ichthys to 30%
- Technip awarded important offshore contract for the Ichthys LNG Project in Australia
- Ichthys on Track as Offshore Facilities Take Shape
- CB&I Announces Contract in Australia
- Kentz awarded US$100m Contract on Ichthys LNG Project
- Sulzer Pumps Supplies High Performance Pumps to FPSO Vessel in Western Australia
- UGL Kentz JV awarded a US$640m contract for the Ichthys LNG Project
- Kentz awarded a further US$570m contract for the Ichthys LNG Project
- INPEX Launches Hull of Floating Production, Storage and Offloading (FPSO) Facility for Ichthys LNG Project
- INPEX-operated Ichthys LNG Project Commences Production