Difference between revisions of "LNG Terminal Projects Completed in 2017"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 10: | Line 10: | ||
# Train one of the [[Yamal LNG Terminal]] | # Train one of the [[Yamal LNG Terminal]] | ||
| + | ==== Import Terminals ==== | ||
| − | + | Qidong LNG | |
| − | + | Guangdong Yuedong LNG | |
| + | # [[Dunkerque LNG Terminal]] | ||
| + | Boryeong | ||
| + | RGT-2 (Pengerang LNG) | ||
| + | Delimara LNG | ||
| + | PGPC Port Qasim | ||
| + | Singapore LNG Expansion | ||
| + | Map Ta Phut LNG Expansion 1 | ||
| + | Etki LNG | ||
Revision as of 15:05, 21 December 2021
Introduction
- 24.5 million tons of liquefaction capacity was commissioned
Export Terminals
- The 3rd train of Gorgon LNG Terminal started operations
- Train 9 of the Malaysia LNG Terminal,
- Malaysia Satu FLNG Terminal
- Trains 3 & 4 of the Sabine Pass LNG Terminal
- Train one of the Yamal LNG Terminal
Import Terminals
Qidong LNG Guangdong Yuedong LNG
Boryeong RGT-2 (Pengerang LNG) Delimara LNG PGPC Port Qasim Singapore LNG Expansion Map Ta Phut LNG Expansion 1 Etki LNG