Difference between revisions of "Kirishi Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 25: | Line 25: | ||
=== Crude Supply === | === Crude Supply === | ||
- | - | ||
− | === Products Produced | + | === Products Produced === |
* unleaded motor gasoline, diesel fuel, jet fuel, mazut, petroleum bitumen, LPG | * unleaded motor gasoline, diesel fuel, jet fuel, mazut, petroleum bitumen, LPG | ||
− | === Projects | + | === Projects === |
* For full details see [[Kirishi Refinery Project]] | * For full details see [[Kirishi Refinery Project]] | ||
* The refinery is being upgraded with deeper refining complex enabling the Company to raise the conversion ratio and enhance production quality. | * The refinery is being upgraded with deeper refining complex enabling the Company to raise the conversion ratio and enhance production quality. | ||
* The complex is to be equipped with hydrocracking and visbreaking units, a vacuum unit, and a diesel fuel hydro-dewaxing unit. | * The complex is to be equipped with hydrocracking and visbreaking units, a vacuum unit, and a diesel fuel hydro-dewaxing unit. | ||
+ | |||
=== History === | === History === | ||
* 1966 - Refinery was commissioned | * 1966 - Refinery was commissioned |
Revision as of 17:03, 22 March 2020
Contents
Summary Information
- Ownership: Surgutneftegas
- Website:
- Location: Leningradskaya Oblast, North-West of Russia
- Capacity: 11.5 million tons/annum & 230,000 bbl/day
- Nelson Complexity:
- Refining Depth:
Brief Description
- A large high complexity refinery, capable of producing EURO V products.
Refining Units
- Atmospheric Distillation
- Reformer
- Diesel Hydrotreatment
- Isomerization
- Residue Hydrocracker - 60,000 bpd
- Visbreaker
- Amine regeneration unit
- Sulfur recovery unit
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
-
Products Produced
- unleaded motor gasoline, diesel fuel, jet fuel, mazut, petroleum bitumen, LPG
Projects
- For full details see Kirishi Refinery Project
- The refinery is being upgraded with deeper refining complex enabling the Company to raise the conversion ratio and enhance production quality.
- The complex is to be equipped with hydrocracking and visbreaking units, a vacuum unit, and a diesel fuel hydro-dewaxing unit.
History
- 1966 - Refinery was commissioned
- 1996 - Kirishi started production of diesel fuel with a maximum of 500 ppm of sulfur
- 2008 - Upgrading project launched
- 2013 - Kirishi Refinery Project completed
Other Information
-