Difference between revisions of "Kirishi Refinery"

From A Barrel Full
Jump to navigation Jump to search
Line 25: Line 25:
 
=== Crude Supply ===
 
=== Crude Supply ===
 
-
 
-
=== Products Produced
+
=== Products Produced ===
 
* unleaded motor gasoline, diesel fuel, jet fuel, mazut, petroleum bitumen, LPG
 
* unleaded motor gasoline, diesel fuel, jet fuel, mazut, petroleum bitumen, LPG
=== Projects
+
=== Projects ===
 
* For full details see [[Kirishi Refinery Project]]
 
* For full details see [[Kirishi Refinery Project]]
 
* The refinery is being upgraded with deeper refining complex enabling the Company to raise the conversion ratio and enhance production quality.
 
* The refinery is being upgraded with deeper refining complex enabling the Company to raise the conversion ratio and enhance production quality.
 
* The complex is to be equipped with hydrocracking and visbreaking units, a vacuum unit, and a diesel fuel hydro-dewaxing unit.
 
* The complex is to be equipped with hydrocracking and visbreaking units, a vacuum unit, and a diesel fuel hydro-dewaxing unit.
 +
 
=== History ===
 
=== History ===
 
* 1966 - Refinery was commissioned
 
* 1966 - Refinery was commissioned

Revision as of 17:03, 22 March 2020

Summary Information

Brief Description

  • A large high complexity refinery, capable of producing EURO V products.

Refining Units

  • Atmospheric Distillation
  • Reformer
  • Diesel Hydrotreatment
  • Isomerization
  • Residue Hydrocracker - 60,000 bpd
  • Visbreaker
  • Amine regeneration unit
  • Sulfur recovery unit

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

-

Products Produced

  • unleaded motor gasoline, diesel fuel, jet fuel, mazut, petroleum bitumen, LPG

Projects

  • For full details see Kirishi Refinery Project
  • The refinery is being upgraded with deeper refining complex enabling the Company to raise the conversion ratio and enhance production quality.
  • The complex is to be equipped with hydrocracking and visbreaking units, a vacuum unit, and a diesel fuel hydro-dewaxing unit.

History

  • 1966 - Refinery was commissioned
  • 1996 - Kirishi started production of diesel fuel with a maximum of 500 ppm of sulfur
  • 2008 - Upgrading project launched
  • 2013 - Kirishi Refinery Project completed

Other Information

-

Links

  1. Refinery webpage
  2. Refinery Company webpage
  3. Globalstroy Engineering Refinery References
  4. VNIPIneft Refinery Project References
  5. Foster Wheeler Awarded Contract for Supply of Nine Fired Heaters to Russian Refinery