VNIPIneft Refinery Project References
Jump to navigation
Jump to search
- Taneco Nizhnekamsk Refinery
- OAO TatneftHydrocrackingComplex, 2.9 MTA – 2014
- Scope of Work: Authority Engineering,Detailed Design, Procurement, Supervision.
- Ryazan Refinery
- ZAO RNPK VGO Hydrocracking Complex,2 MTA – 2014
- Scope of Work: Authority Engineering
- Volgograd Refinery
- OOO LUKOIL-Volgogradneftepererabotka Integrated CDU/VDU, 6 MTA - 2014
- Scope of Work: Authority Engineering and Detailed Design
- Moscow Refinery
- OAO Gazprom Neft – Moscow Refinery Isomerization Unit, 650 kTA – 2013
- OAOVNIPIneftScopeofWork: Basic Design Acceptance, Detailed Design,Supervision
- Moscow Refinery
- OAO Gazprom Neft – Moscow Refinery Diesel Hydrotreating Unit, 320 kTA- 2013
- Scope of Work: Authority Engineering and Detailed Design, Supervision
- Volgograd Refinery
- OOO LUKOIL-Volgogradneftepererabotka Atmospheric – Vacuum Distillation Unit - 2012
- Scope of Work: Authority Engineering
- Angarsk Petrochemical Refinery
- OAO Angarskneftekhimproyekt Diesel Hydrotreating Unit- 2012
- Scope of Work: Authority Engineering
- Moscow Refinery
- OAO Gazprom Neft – Moscow Refinery PSA Unit - 2011
- Scope of Work: Authority Engineering and Detailed Design, Supervision
- Taneco Nizhnekamsk Refinery
- OJSC TANECO CDU/VDU, 7 MTA - 2010
- Scope of Work: Basic Design, Authority Engineering and Detailed Design, Procurement, Supervision
- Kirishi Refinery
- OOO PO Kirishinefteorgsintez
- Capacity: 4.9 MTA (vacuum distillation), 2.2 MTA (visbreaking)
- Scope of Work: Basic Design Acceptance; Detailed Design, Procurement.
- Commissioning date: 2009
- Ryazan Refinery
- ZAO RNPK Deep Conversion Complex
- Capacity: 2.5 MTA
- Scope of Work: Basic Design Acceptance, Authority Engineering and Detailed Design (jointly with CB&I Lummus); Procurement; Supervision.
- Commissioning date: 2005-2006
- Nizhnekamsk Refinery
- OAO TAIF-NK Catalytic Cracking Complex
- Capacity: 850 kTA
- Scope of Work: Acting as a General Designer; Basic Design(jointly with OAO VNIINP);Detailed Design; Procurement; Supervision.
- Commissioning date: 2005
- Yanos Yaroslavl Refinery
- OAO Slavneft-Yaroslavnefteorgsintez Deep Conversion Complex
- Capacity: 2.1 MTA
- Scope of Work: Basic Design Acceptance, Detailed Design(jointly with Toyo Engineering Corporation); Supervision.
- Commissioning date: 2005
- Perm Refinery
- OOO LUKOIL-Permnefteorgsintez VGO Hydrocracking Complex
- Capacity: 3.5 MTA - Plant
- Scope of Work: Acting as a General Designer; Basic Design Acceptance; Detailed Design, Procurement, Supervision.
- Commissioning date: 2004
- Ryazan Refinery
- ZAO RNPK Catalytic Cracking Complex Capacity: 2.5 MTA
- Scope of Work: Detailed Design, Supervision.
- Commissioning date: 2001