#* 1,172 miles, 30 inches, Crude 180,000 bpd
 
#* 1,172 miles, 30 inches, Crude 180,000 bpd
 
#* The Dakota Access Pipeline increased volumes by 180,000 by adding horsepower along with a few modifications and upgrades at pump stations along the existing line.
 
#* The Dakota Access Pipeline increased volumes by 180,000 by adding horsepower along with a few modifications and upgrades at pump stations along the existing line.
# Cushing South Phase I Energy Transfer Partners; Centurion Pipeline L.P. Other, Reversal Completed 2021 Q2 CRD 65,000 Cushing South Pipeline project Phase I moves 65,000 b/d of crude from terminals in Platteville, Colorado, and Cushing, Oklahoma, to a terminal in Nederland, Texas. The project includes new interconnections between ET and Centurion pipelines and a reversal of the Centurion South pipeline.
+
# '''[[Centurion Crude Oil Pipeline]]'''
 +
#* Cushing South Phase I
 +
#* Energy Transfer Partners; Centurion Pipeline L.P. Other,  
 +
#* Reversal - Completed - 2021 - Q2
 +
#* CRD - 65,000bpd
 +
#* Cushing South Pipeline project Phase I moves 65,000 b/d of crude from terminals in Platteville, Colorado, and Cushing, Oklahoma, to a terminal in Nederland, Texas. The project includes new interconnections between ET and Centurion pipelines and a reversal of the Centurion South pipeline.
 
# Baymark Pipeline Enterprise Products Partners; Lavaca Pipe Line Company Expansion Completed 2021 Q3 91 12 HGL Ethylene 100,000 The Baymark ethylene pipeline originates in the Bayport area of southeast Harris County, Texas, and extends approximately 90 miles to Markham, Texas, in Matagorda County.
 
# Baymark Pipeline Enterprise Products Partners; Lavaca Pipe Line Company Expansion Completed 2021 Q3 91 12 HGL Ethylene 100,000 The Baymark ethylene pipeline originates in the Bayport area of southeast Harris County, Texas, and extends approximately 90 miles to Markham, Texas, in Matagorda County.
# EPIC NGL Pipeline—Corpus Christi/Robstown to Sweeny EPIC Pipeline New Completed 2021 Q3 20 HGL Y-grade 220,000 20-inch pipeline moves Y-grade from Corpus Christi/Robstown to Sweeny (both in Texas) for fractionation.
+
# [[EPIC NGL Pipeline]]
# # EPIC Ethane Pipeline—Corpus Christi/Robstown to Taft EPIC Pipeline New Completed 2021 Q3 30 12 HGL Ethane 120,000 12-inch pipeline moves ethane from Corpus Christi/Robstown, Texas, to Gulf Coast Growth Ventures cracker at Taft, Texas.
+
#* EPIC NGL Pipeline—Corpus Christi/Robstown to Sweeny
 +
#* EPIC Pipeline
 +
#* New, Completed - Q3 2021
 +
#* 20 HGL Y-grade 220,000  
 +
#* 20-inch pipeline moves Y-grade from Corpus Christi/Robstown to Sweeny (both in Texas) for fractionation.
 +
# [[EPIC NGL Pipeline]]
 +
#* EPIC Ethane Pipeline—Corpus Christi/Robstown to Taft
 +
#* EPIC Pipeline
 +
#* New, Completed - Q3 2021
 +
#* 30 miles, 12 inches, HGL, Ethane, 120,000 bpd
 +
#* 12-inch pipeline moves ethane from Corpus Christi/Robstown, Texas, to Gulf Coast Growth Ventures cracker at Taft, Texas.
 
# Cushing Connect Pipeline Holly Energy, Plains All American (Cushing Connect Pipeline & Terminal LLC JV) New Completed 2021 Q3 50 CRD 160,000 Cushing Connect Pipeline & Terminal LLC is a JV between Holly Energy and Plains All American, which connects Holly's Tulsa refinery to Cushing (both in Oklahoma).
 
# Cushing Connect Pipeline Holly Energy, Plains All American (Cushing Connect Pipeline & Terminal LLC JV) New Completed 2021 Q3 50 CRD 160,000 Cushing Connect Pipeline & Terminal LLC is a JV between Holly Energy and Plains All American, which connects Holly's Tulsa refinery to Cushing (both in Oklahoma).
 
# The Southern Star Pipeline Jefferson Gulf Coast Energy Partners New Completed 2021 Q2 14 24 CRD 288,000 14-mile, 24-inch pipeline that connects Jefferson Energy terminal to the Motiva Port Neches terminal in Port Neches, Texas.
 
# The Southern Star Pipeline Jefferson Gulf Coast Energy Partners New Completed 2021 Q2 14 24 CRD 288,000 14-mile, 24-inch pipeline that connects Jefferson Energy terminal to the Motiva Port Neches terminal in Port Neches, Texas.

Latest revision as of 06:51, 29 May 2024

  1. Enbridge Line 3 Oil Pipeline
    • Replacement Project
    • Enbridge
    • Expansion - Completed - Q4 - 2021
    • 1,097 miles - 36 inches
    • Crude - 370,000 bpd
    • Restored pipeline to historical capacity by replacing the pipe along most of the route. The pipeline goes from Edmonton, Alberta, Canada, to Superior, Wisconsin, with 365 miles of pipeline is in the United States.
  2. Southern Access Crude Oil Pipeline
    • Southern Access (Line 61) Upgrade Project, expansion 4
    • Enbridge
    • Expansion - Completed - Q4 - 2021
    • 454 miles, 42 inches, Crude 250,000 bpd
    • Capacity increased from 950,000 b/d to 1,200,000 b/d. Expanded pump stations to increase capacity.
  3. Revolution System Energy Transfer Partners New Completed 2021 Q1 15 12 HGL Y-grade 60,000 A 12-inch, 15 mile pipeline out of Revolution Cryogenic plant south to storage and injection site (all in Washington County, Pennsylvania.) .
  4. Mariner East 2 Pipeline (Bypass) Energy Transfer Partners New Completed 2021 Q3 350 20 HGL Propane, butanes, natural gasoline 125,000 Expanded pipeline has full capacity of 275,000 b/d.
  5. Dakota Access Crude Oil Pipeline
    • Energy Transfer Partners, MarEn Bakken Company (owned by Enbridge and Marathon Pipeline), Phillips 66 (Bakken Pipeline JV)
    • Expansion - Completed - Q3 - 2021
    • 1,172 miles, 30 inches, Crude 180,000 bpd
    • The Dakota Access Pipeline increased volumes by 180,000 by adding horsepower along with a few modifications and upgrades at pump stations along the existing line.
  6. Centurion Crude Oil Pipeline
    • Cushing South Phase I
    • Energy Transfer Partners; Centurion Pipeline L.P. Other,
    • Reversal - Completed - 2021 - Q2
    • CRD - 65,000bpd
    • Cushing South Pipeline project Phase I moves 65,000 b/d of crude from terminals in Platteville, Colorado, and Cushing, Oklahoma, to a terminal in Nederland, Texas. The project includes new interconnections between ET and Centurion pipelines and a reversal of the Centurion South pipeline.
  7. Baymark Pipeline Enterprise Products Partners; Lavaca Pipe Line Company Expansion Completed 2021 Q3 91 12 HGL Ethylene 100,000 The Baymark ethylene pipeline originates in the Bayport area of southeast Harris County, Texas, and extends approximately 90 miles to Markham, Texas, in Matagorda County.
  8. EPIC NGL Pipeline
    • EPIC NGL Pipeline—Corpus Christi/Robstown to Sweeny
    • EPIC Pipeline
    • New, Completed - Q3 2021
    • 20 HGL Y-grade 220,000
    • 20-inch pipeline moves Y-grade from Corpus Christi/Robstown to Sweeny (both in Texas) for fractionation.
  9. EPIC NGL Pipeline
    • EPIC Ethane Pipeline—Corpus Christi/Robstown to Taft
    • EPIC Pipeline
    • New, Completed - Q3 2021
    • 30 miles, 12 inches, HGL, Ethane, 120,000 bpd
    • 12-inch pipeline moves ethane from Corpus Christi/Robstown, Texas, to Gulf Coast Growth Ventures cracker at Taft, Texas.
  10. Cushing Connect Pipeline Holly Energy, Plains All American (Cushing Connect Pipeline & Terminal LLC JV) New Completed 2021 Q3 50 CRD 160,000 Cushing Connect Pipeline & Terminal LLC is a JV between Holly Energy and Plains All American, which connects Holly's Tulsa refinery to Cushing (both in Oklahoma).
  11. The Southern Star Pipeline Jefferson Gulf Coast Energy Partners New Completed 2021 Q2 14 24 CRD 288,000 14-mile, 24-inch pipeline that connects Jefferson Energy terminal to the Motiva Port Neches terminal in Port Neches, Texas.
  12. Capline Oil Pipeline
    • Capline reversal
    • Marathon Pipeline (MPLX)
    • Reversal - Completed - 2021 - Q4
    • 632 miles, 40 inches, CRD - 1,300,000 bpd
    • Reversal of 1,300,000 b/d pipeline so that it flows south. Initial capacity in 2021 Q4 is 300,000 b/d. .
  13. Seahawk Pipeline Max Midstream Conversion Completed 2021 Q1 20 12 CRD 140,000 Converted 21 mile, 12-inch pipeline from Edna Terminal to Seahawk Terminal (both in Texas) from natural gas to crude.
  14. Ambassador Pipeline Phase 1 NGL Energy Partners Reversal Completed 2021 Q4 119 8 HGL Propane The first phase of the Ambassador pipeline reversal moves consumer-grade propane from Marysville to Wheeler (both in Michigan). This project is part of the complete reversal of Ambassador Pipeline, which when completed will go from Marysville to Kalkaska (both in Michigan).
  15. Stateline-to-Riverview Tioga Lateral OneOK Expansion Completed 2021 Q2 75 16 HGL Y-grade 90,000 A 75-mile, 16-inch diameter NGL pipeline lateral and associated facilities with capacity of up to 90,000 b/d of NGL in Williams County, North Dakota.
  16. Vito Oil Field
    • Vito Oil Pipeline
    • Enbridge
    • New - Completed - 2022 - Q4
    • 51 miles, 18 inches, CRD - 120,000bpd
    • 51-mile, 18-inch offshore pipeline with a capacity of 120,000 b/d was developed along with the Vito Platform.
  17. Ted Collins Pipeline Energy Transfer Partners New Completed 2022 Q2 80 CRD 275,000 80-mile pipeline connects the Nederland Terminal to the Houston Ship Channel (both in Texas). Project downsized to 275,000 b/d in Q1 2020 from 500,000 b/d and renamed "Ted Collins Link".
  18. Cushing South Phase II Energy Transfer Partners; Centurion Pipeline L.P. Expansion Completed 2022 Q1 CRD 55,000 Cushing South Pipeline project Phase II increased pipeline capacity by 55,000 b/d for a total of 120,000 b/d. This project primarily utilized existing facilities to provide additional connectivity across Energy Transfer’s mid-continent and Gulf Coast crude oil network.
  19. Appalachia to Texas Ethane Pipeline (ATEX)
    • Appalachia to Texas Express (ATEX) expansion
    • Enterprise Products Partners
    • Expansion - Completed - 2022 - Q2
    • 1,205 miles, 20, 16, 14 inches
    • HGL, Ethane - 45,000 bpd
    • The 45,000 project expansion went into service in second quarter of 2022. The incremental capacity increase was achieved through improvements and modifications to existing infrastructure.
  20. Borger Express Pipeline Navigator Energy Services New NNI 2022 195 16 CRD 90,000 195-mile, 16-inch pipeline with capacity of up to 90,000 b/d will connect Cushing Hub in Oklahoma to regional refineries.
  21. Texas Western Pipeline System (TW Products) Enterprise Products Partners Conversion, Reversal Announced 2023 Q4 PRD gasoline, diesel 60,000 Enterprise announced the partial conversion of some capacity on its Mid-America Pipeline (MAPL) NGL system to carry refined products from the Texas Gulf Coast into the mid-continent and into the Rockies. Estimated in service in the second half of 2023.
  22. Seahawk Pipeline—Thunderdome Lateral- VEX Max Midstream Conversion Construction 2023 Q3 20 14 CRD 90,000 Will convert an existing 14-inch natural gas pipeline to crude pipeline and interconnection into VEX line to move crude to Edna terminal, with ultimate deliveries to the Seahawk terminal using the existing 12” Seahawk pipeline.
  23. Ambassador Pipeline Phase 2 NGL Energy Partners Reversal Construction 2023 Q4 106 8 HGL Propane The second phase of the Ambassador pipeline reversal will move consumer-grade propane from Wheeler to Kalkaska (both in Michigan). This project is part of the complete reversal of Ambassador Pipeline, which when completed will go from Marysville to Kalkaska (both in Michigan).
  24. Seminoe Pipeline Phillips 66 Expansion Announced 2023 Q2 8 PRD 5,800 This is an 5,800 b/d expansion of the 8 inch Seminoe Pipeline which transports refined products from Billings, Montana to Casper, Wyoming. The Seminoe Pipeline system is a 33,000-b/d pipeline.
  25. Keystone Port Neches Link TC Energy, Motiva New Completed 2023 Q1 5 36, 30 CRD 630,000 "The pipeline begins at the Sunoco Logistics terminal on the Twin City Highway in Nederland and ends at Motiva’s terminal in Port Neches (both in Texas), a distance of approximately 5 miles. The Motiva section is a 30-inch diameter pipe and TC Energy section is 36-inch diameter pipe. "
  26. Diamondback Pipeline TransMontaigne Conversion Announced 2023 Q4 16 8, 6 PRD Gasoline, diesel 32,000 Would convert an 8-inch diameter propane pipeline (capacity 20,000 b/d) and a parallel, idle 6-inch diameter pipeline (capacity 12,000 b/d) to carry gasoline and diesel. Pipelines would go from Brownsville, Texas, to the United States-Mexico border (Matamoros, Mexico).
  27. Houston to El Paso refined petroleum products pipeline system Magellan Expansion Announced 2024 Q1 30 16 PRD gasoline, diesel 30,000 New 30-mile, 16-inch pipeline along existing route between Odessa and Crane, Texas that will expand capacity by 30,000 b/d. Currently capable of transporting approximately 70,000 barrels per day (bpd) of refined petroleum products, such as gasoline and diesel fuel, from Gulf Coast and Mid-Continent refineries to El Paso, is expanding operating capabilities to El Paso to a new capacity of approximately 100,000 b/d.
  28. Seahawk Pipeline—Thunderdome Lateral- Gray Oak Max Midstream Conversion Construction 2024 Q1 20 16 CRD 396,000 Will convert an existing 16-inch pipeline natural gas pipeline to crude pipeline. Pipeline will go from Gray Oak Louise to Edna terminal (both in Texas), with ultimate deliveries to the Seahawk terminal using the existing 12” Seahawk pipeline.
  29. Daytona NGL Pipeline Targa Resources New Construction 2024 Q4 400 30 HGL Y-grade 400,000 Targa announced plans to construct the Daytona NGL Pipeline as an addition to Targa's existing common carrier Grand Prix NGL Pipeline system. The Daytona NGL Pipeline will transport NGLs from the Permian Basin and connect to the 30-inch diameter segment of Targa's Grand Prix NGL Pipeline in North Texas, where volumes will be transported to Targa’s fractionation and storage complex in Mont Belvieu. The Daytona NGL Pipeline is expected to be in service by the end of 2024
  30. Texas Gulflink Project Sentinel Midstream New Announced 2026 Q3 45 42 CRD 2,000,000 Texas GulfLink, LLC will transport oil to one of two floating single point mooring (SPM) buoys in the Gulf of Mexico, approximately 12 miles of onshore pipeline and 33 miles offshore, via a 42-inch pipeline from a storage facility near Jones Creek in Brazoria County, Texas.
  31. Sea Port Oil Terminal (SPOT) Enbridge; Enterprise Products Partners New Announced 2027 Q1 112 36,36 CRD 2,000,000 The infrastructure to support the proposed Sea Port Oil Terminal (SPOT) deepwater import/export terminal will include a new 36-inch, 50-mile pipeline from Enterprise Crude Houston (ECHO) terminal to Oyster Creek Terminal and two collocated 36-inch, 12-mile pipelines from Oyster Creek Terminal to an offshore pipe connection (all in Texas). The project will also include two new collocated, bi-directional, 36-inch, 50-mile offshore pipelines to the proposed offshore terminal.