LNG Terminal Projects Completed in 2019
Jump to navigation
Jump to search
Introduction
- Global Liquefaction capacity increased by 23.0 million tons in 2019
- Global Regasification capacity increased by 28.0 million tons in 2019
Export Terminals
- Cameron LNG Export Terminal Project
- The second train of Corpus Christi LNG Terminal
- Elba Island LNG Terminal
- Freeport LNG Terminal
- Prelude Floating LNG Terminal
- The fifth train of Sabine Pass LNG Terminal
Import Terminals
- Chennai LNG Terminal
- The third pahse of the Dahej LNG Terminal was completed
- Ennore LNG Terminal
- Kalingrad Floating LNG Terminal
- Summit LNG Terminal
- Phase 2 expansion of Taichung LNG Terminal