Haltenpipe Gas Pipeline

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Source: Heidrun Oil Field
  • Destination: Tjeldbergodden
  • Ownership: Gassco
  • Website: http://www.gassco.no/
  • Length: 250 kilometres ( miles)
  • Capacity: 7 MSm^^3^^ per day
  • Status: Operating

+++ Details

  • The Haltenpipe line is 250 kilometres long and carries gas from the [[[Heidrun Oil Field]]] in the Norwegian Sea to Tjeldbergodden in mid-Norway.

+++ Contractors

  • **Saipem:** Transportation and Installation
  • **Global Maritime:** Safety assessment of marine operations and marine risks

+++ History

  • 1995 - The Haltenpipe joint venture was established
  • 1996 - Pipeline started operations

+++ Other Information

  • -

+++ Links

  1. Haltenpipe
  2. Global Maritime Pipeline References
  3. Saipem Europe Pipeline References