Haldia Refinery Hydrocracker Project

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Ownership: Indian Oil Company
  • Website: http://www.iocl.com/
  • Wiki Page: Haldia Refinery
  • Location:
  • Capacity:
    • Before: 6.0 million tons/annum & 120,000 bbl/day
    • After: 7.5 million tons/annum & 150,000 bbl/day
  • Nelson Complexity:
  • Project Stage: Completed
  • Expected Completion: 2010
  • Budget:

The Project

  • Project Type: Upgrade and expansion
  • Project Summary:
    • Addition of a hydrocracker and hydrogen unit
    • Revamping the 2nd Crude Distillation Unit (CDU-II) from 2.5 MMTPA to 4.0 MMTPA
  • Main Contractors:
    • **Punj Lloyd:** Process design, detailed engineering, procurement, supply, third party inspection, transportation of all equipment/materials to site, materials management, construction, installation, testing, pre-commissioning, commissioning of the Hydrocracker & Hydrogen Unit

Refining Units

  • CDU - Revamp
  • Hydrocracker
  • Hydrogen Unit
  • Nitrogen Plant,
  • Sulphur Recovery Unit,
  • Effluent Treatment Plant,
  • Tertiary Treatment Plant with Reverse Osmosis process,
  • Gas Turbine,
  • LPG Mounded Bullets,
  • Feed Tanks

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • -


Products Produced

  • Enhance the Distillate Yield of the Refinery by about 3%
  • Produce Euro IV diesel

History

  • 2010 - The project was completed

Other Information

  • -

Links

  1. IndianOil Commissions Once-through Hydrocracker Unit at Haldia Refinery and expands its capacity to 7.5 MMTPA
  2. Punj Lloyd Refining References