East Belumut Oil Field
Jump to navigation
Jump to search
Summary Information
- Operator: Newfield
- Country: Malaysia
- Location: PM 323
- Production start: 2008
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- East Belumut is located approximately 160 miles offshore Peninsular Malaysia in 240 feet of water.
- The field is producing approximately 20,000 barrels of oil per day gross
- Crude is exported via a 10” pipeline to the Tinggi - A Platform
+++ Contractors
- **MMCOG:**
- Provision of Engineering Design for Equipment and System Enhancement for East Belumut - A Platform
- Provision of Engineering Services for Topside Modifications
- Provision for Front End Engineering Design Services
- **THHE:** East Belumut A CPP TOPSIDE
- **Seaway Heavy Lifting:** Installation of East Belumut-A Deck and LQ module
+++ History
- 2005 - Profit sharing contract signed
- 2008 - First oil produced
- 2010 - Pipeline damaged in an accident
- 2013 - Sapurakencana acquires the field
+++ Geology
+++ Links
- MMCOG Platform References
- Seaway Heavy Lifting Oil And Gas References
- TH Heavy Engineering Platform References
- FoundOcean Subsea References
- Newfield Signs Production Sharing Contract on PM 323 Offshore Malaysia
- Newfield Commences Production From New Development Offshore Malaysia
- Newfield Exploration Reports Pipeline Damage Offshore Malaysia
- Sapurakencana Petroleum Berhad Signs Share Purchase Agreement With Newfield Exploration Company