Summary Information

  • Operator: EnQuest
  • Country: UK
  • Location: North Sea
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

Contractors

  • **Technip:**
    • Installation of two 10” production flexible flowlines, one 8” water injection flexible flowline and one further 8” production flexible flowline,
    • Installation of three 8” flexible risers,
    • Installation of two production control umbilicals/risers,
    • Installation of four power cables and associated dynamic risers,
    • Procurement, fabrication and installation of a 175 ton manifold structure,
    • Associated trenching operations, tie-ins, testing and commissioning.
  • **Jumbo:** FPSO mooring, installation and hook-up contract

History

  • 1992 - Decommissioning was approved for the Argyll Oil Field
  • 2012 - Field development approval given
  • 2012 - Technip awarded subsea contract
  • 2012 - Jumbo awarded FPSO mooring, installation and hook-up contract

Geology

Links

  1. UK Oil and Gas Field Approved Decommissioning
  2. Technip awarded contract for EnQuest’s Alma and Galia development in UK North Sea
  3. Jumbo main installation contractor for EnQuest Producer