Difference between revisions of "LNG Terminal Projects Completed in 2017"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 18: | Line 18: | ||
# [[Etki LNG Terminal]] | # [[Etki LNG Terminal]] | ||
# [[Guangdong Yuedong LNG]] | # [[Guangdong Yuedong LNG]] | ||
+ | # [[Map Ta Phut Thailand LNG Terminal]], expansion | ||
# [[Pengerang Johur LNG Terminal]] | # [[Pengerang Johur LNG Terminal]] | ||
# [[Port Qasim Floating LNG Terminal]] | # [[Port Qasim Floating LNG Terminal]] | ||
# [[Qidong LNG]] | # [[Qidong LNG]] | ||
# [[Singapore LNG Terminal]], expansion | # [[Singapore LNG Terminal]], expansion | ||
− | |||
− | |||
− | |||
− | |||
− |
Revision as of 14:45, 25 June 2022
Introduction
- 24.5 million tons of liquefaction capacity was commissioned
Export Terminals
- The 3rd train of Gorgon LNG Terminal started operations
- Train 9 of the Malaysia LNG Terminal,
- Malaysia Satu FLNG Terminal
- Trains 3 & 4 of the Sabine Pass LNG Terminal
- Wheatstone LNG Terminal
- Train one of the Yamal LNG Terminal