Tengiz Gas Processing Plant

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Ownership: KMG
  • Website: https://www.kmg.kz/
  • Location: Tengiz, Kazakhstan
  • Capacity: 957 MMSCF per day

Brief Description

  • The plant is designed to separate out the ethane from the raw gas to supply a new petrochemicals plant, the Kazakhstan Silleno Petrochemical Project
  • The plant will produce 1.6 mtpa of ethane and 360 ktpa of propane.
  • The project is scheduled for completion in 2029

Related Oil and Gas Fields

Ongoing Projects

  • The plant is under construction
  • JGC was awarded FEED
  • TECNIMONT is responsible for the Engineering, Procurement and Commissioning

Other Information

  • -

History

  • 2020 - Agreement signed between KMG and Tengiz
  • 2021 - JGC awarded FEED Contract for the Separation Plant
  • 2025 - Groundbreaking ceremony held

Links

  1. KLPE and TCO Signed Basic Terms of Gas Separation Plant Design
  2. JGC awarded FEED Contract for Gas Separation Plant in Kazakhstan
  3. TECNIMONT (MAIRE) attends the ground-breaking ceremony of the Tengiz Gas Separation Complex and hosts the local content forum in Kazakhstan