Kazakhstan Silleno Petrochemical Project

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Ownership: Silleno (60% KMG, 40% Sibur)
  • Website: https://silleno.kz/
  • Wikipage:
  • Location: Atyrau

The Project

  • Description: The project involves the construction of a steam cracking plant, ethylene polymerization plants, an auxiliary licensed ethylene dimerization plant and general plant facilities.
  • Constructor:
  • Licensors:
    • Chevron Phillips Chemical: PE unit
    • Univation Technologies: PE unit

Production Units

  • Ethane cracker - 1.25 mtpa
  • 2 polymer units of 625 ktpa each
  • ethylene dimerization

Raw Materials Supply

Products Produced

  • Polyethylene


Other Information

  • -

History

  • 2021 - NWF Samruk-Kazyna KazMunayGas” (KMG) and SIBUR sign agreement
  • 2022 - Licences awarded for polyethylene units

Links

  1. “KazMunayGas” Signs Trilateral Agreement for Integrated Gas Chemical Complex Construction Project
  2. KMG and Chevron Phillips Sign Agreement to Design Polyethylene Plant
  3. KMG and Univation Sign Licence Agreement for Polymerisation Unit for Polyethylene Project