Shearwater-Elgin Area Line (SEAL) Gas Pipeline

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Source: Elgin Franklin platform
  • Destination: Bacton
  • Ownership: Shell
  • Website:
  • Length: 474 kilometres ( miles)
  • Capacity: per day
  • Status: Operating

+++ Details

  • The pipeline is 474km long with a diameter of 34 inches and has been operational for more than 20 years. The SEAL pipeline transports sales quality gas from the Elgin Franklin platform in the Central Graben Area of the North Sea to the dedicated SEAL module at the Bacton Gas Plant on the Norfolk coast.


++++ Related Gas Fields

+++ History

  • 2022 - PX Group takes over operations

+++ Other Information

  • -

+++ Links

  1. PX Group Awarded Contract to Operate The SEAL Pipeline In The North Sea