Difference between revisions of "Vega Pleyade Offshore Gas Field"

From A Barrel Full
Jump to navigation Jump to search
Line 3: Line 3:
 
* Location: Offshore Southern Argentina
 
* Location: Offshore Southern Argentina
 
* Production start: 2016
 
* Production start: 2016
* Partners: TotalEnergies 37.5%, WintershallDea (37.5%) and Pan American Sur (25%).
+
* Partners: TotalEnergies 37.5%, Harbour Energy (37.5%) and Pan American Sur (25%).
 
* Type: Oil / Gas
 
* Type: Oil / Gas
 
* Estimated Reserves:  
 
* Estimated Reserves:  
Line 17: Line 17:
 
* 2015 - The platform is completed
 
* 2015 - The platform is completed
 
* 2016 - First gas produced
 
* 2016 - First gas produced
 +
* 2023 - Harbour Energy acquired Wintershall's stake
  
 
=== Geology ===
 
=== Geology ===
Line 24: Line 25:
 
# [https://abarrelfull.blogspot.com/2023/03/sail-away-vega-pleyade-project-from.html Sail Away Vega Pleyade Project from Puerto Real Yard, Cadiz, Spain]
 
# [https://abarrelfull.blogspot.com/2023/03/sail-away-vega-pleyade-project-from.html Sail Away Vega Pleyade Project from Puerto Real Yard, Cadiz, Spain]
 
# [https://abarrelfull.blogspot.com/2023/03/argentina-total-starts-up-vega-pleyade.html Argentina: Total starts up Vega Pleyade offshore project in Tierra del Fuego]
 
# [https://abarrelfull.blogspot.com/2023/03/argentina-total-starts-up-vega-pleyade.html Argentina: Total starts up Vega Pleyade offshore project in Tierra del Fuego]
 
+
# [https://a-barrel-full.blogspot.com/2023/12/transformational-acquisition-of.html Transformational acquisition of Wintershall Dea asset portfolio]
  
 
[[category:Field]]
 
[[category:Field]]
 
[[category:Argentina]]
 
[[category:Argentina]]
 
[[category:Total]]
 
[[category:Total]]

Revision as of 17:56, 13 January 2024

Summary Information

  • Country: Argentina
  • Location: Offshore Southern Argentina
  • Production start: 2016
  • Partners: TotalEnergies 37.5%, Harbour Energy (37.5%) and Pan American Sur (25%).
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Vega Pleyade development consists of a wellhead platform in 50 meters water depth, tied back via a 77 kilometer offshore pipeline to the Total-operated Rio Cullen and Cañadon Alfa onshore treatment facilities

Contractors

  • Dragados Offshore: engineering, procurement, construction (EPC), including in-house detail design, onshore commissioning, load-out and sea-fastening of the WHP topsides (1.500 tonnes), 4-legged jacket (1.000 tonnes), and piles

History

  • 2015 - The platform is completed
  • 2016 - First gas produced
  • 2023 - Harbour Energy acquired Wintershall's stake

Geology

Links

  1. Sail Away Vega Pleyade Project from Puerto Real Yard, Cadiz, Spain
  2. Argentina: Total starts up Vega Pleyade offshore project in Tierra del Fuego
  3. Transformational acquisition of Wintershall Dea asset portfolio