Vega Pleyade Offshore Gas Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Country: Argentina
  • Location: Offshore Southern Argentina
  • Production start: 2016
  • Partners: TotalEnergies 37.5%, Harbour Energy (37.5%) and Pan American Sur (25%).
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Vega Pleyade development consists of a wellhead platform in 50 meters water depth, tied back via a 77 kilometer offshore pipeline to the Total-operated Rio Cullen and Cañadon Alfa onshore treatment facilities

Contractors

  • Dragados Offshore: engineering, procurement, construction (EPC), including in-house detail design, onshore commissioning, load-out and sea-fastening of the WHP topsides (1.500 tonnes), 4-legged jacket (1.000 tonnes), and piles
  • Serimax: Pipelines

History

  • 2015 - The platform is completed
  • 2016 - First gas produced
  • 2023 - Harbour Energy acquired Wintershall's stake

Geology

Links

  1. Serimax Pipeline References
  2. Sail Away Vega Pleyade Project from Puerto Real Yard, Cadiz, Spain
  3. Argentina: Total starts up Vega Pleyade offshore project in Tierra del Fuego
  4. Transformational acquisition of Wintershall Dea asset portfolio