=== Contractors === | === Contractors === | ||
− | * - | + | * Dragados Offshore: engineering, procurement, construction (EPC), including in-house detail design, onshore commissioning, load-out and sea-fastening of the WHP topsides (1.500 tonnes), 4-legged jacket (1.000 tonnes), and piles |
=== History === | === History === | ||
− | * | + | * 2015 - The platform is completed |
+ | * 2016 - First gas produced | ||
=== Geology === | === Geology === | ||
Line 21: | Line 22: | ||
=== Links === | === Links === | ||
+ | # [https://abarrelfull.blogspot.com/2023/03/sail-away-vega-pleyade-project-from.html Sail Away Vega Pleyade Project from Puerto Real Yard, Cadiz, Spain] | ||
# [https://abarrelfull.blogspot.com/2023/03/argentina-total-starts-up-vega-pleyade.html Argentina: Total starts up Vega Pleyade offshore project in Tierra del Fuego] | # [https://abarrelfull.blogspot.com/2023/03/argentina-total-starts-up-vega-pleyade.html Argentina: Total starts up Vega Pleyade offshore project in Tierra del Fuego] | ||
Revision as of 16:37, 30 March 2023
Summary Information
- Country: Argentina
- Location: Offshore Southern Argentina
- Production start: 2016
- Partners: TotalEnergies 37.5%, WintershallDea (37.5%) and Pan American Sur (25%).
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The Vega Pleyade development consists of a wellhead platform in 50 meters water depth, tied back via a 77 kilometer offshore pipeline to the Total-operated Rio Cullen and Cañadon Alfa onshore treatment facilities
Contractors
- Dragados Offshore: engineering, procurement, construction (EPC), including in-house detail design, onshore commissioning, load-out and sea-fastening of the WHP topsides (1.500 tonnes), 4-legged jacket (1.000 tonnes), and piles
History
- 2015 - The platform is completed
- 2016 - First gas produced