Tuban East Java Refinery Project

From A Barrel Full
Revision as of 08:46, 20 March 2020 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search

Summary Information

  • Ownership: Rosneft 45% and Pertamina 55%
  • Website: http://www.pertamina.com/
  • Wiki Page: Tuban East Java Refinery
  • Location: Tuban, East Java, Indonesia
  • Capacity: 15.0 million tons/annum & 300,000 bbl/day
  • Nelson Complexity: 13.1
  • Project Stage: Planned
  • Expected Completion:
  • Budget:

The Project

  • Project Type: Green field refinery and petrochemicals plant
  • Project Summary: The planned refining capacity is 15 mmpta (300 kbpd) and the targeted capacity of the petrochemical complex is over 1 mmtpa of ethylene and 1.3 mmtpa of aromatics.
  • Main Contractors
    • Tecnicas Reunidas: Basic Engineering Design (BED) and the Front-End Engineering Design (FEED)

Refining Units

  • Atmospheric Distillation

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • The feedstock for TGRR will be medium and heavy sulfur crude oil grades
  • The crude oil terminal will be able to accommodate VLCCs of up to 300 thousand tonnes.

Products Produced

-

History

2005 - Sinopec & Pertamina sign an MOU 2012 - Saudi Aramco signed Memorandum of Understanding 2017 - Rosneft and Pertamina sign JV agreement

Other Information

-

Links

  1. COOPERATION PERTAMINA - Sinopec
  2. Saudi Aramco Memorandum of Understanding signed with PT Pertamina
  3. Rosneft and Pertamina set up a Joint Venture for the development of Tuban Grass Root Refinery (TGRR) project
  4. Rosneft and Pertamina JV Sign Tuban Refinery Design Contract