Tuban East Java Refinery Project

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Ownership: Rosneft 45% and Pertamina 55%
  • Website: http://www.pertamina.com/
  • Wiki Page: Tuban East Java Refinery
  • Location: Tuban, East Java, Indonesia
  • Capacity: 15.0 million tons/annum & 300,000 bbl/day
  • Nelson Complexity: 13.1
  • Project Stage: Planned
  • Expected Completion:
  • Budget:

The Project

  • Project Type: Green field refinery and petrochemicals plant
  • Project Summary: The planned refining capacity is 15 mmpta (300 kbpd) and the targeted capacity of the petrochemical complex is over 1 mmtpa of ethylene and 1.3 mmtpa of aromatics.
  • Main Contractors
    • Tecnicas Reunidas: Basic Engineering Design (BED) and the Front-End Engineering Design (FEED)

Refining Units

  • Atmospheric Distillation
  • Sulphur Recovery Plant
  • Sour Water Stripping Unit
  • Amine Recovery Unit

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • The feedstock for TGRR will be medium and heavy sulfur crude oil grades
  • The crude oil terminal will be able to accommodate VLCCs of up to 300 thousand tonnes.

Products Produced

-

History

  • 2005 - Sinopec & Pertamina sign an MOU
  • 2012 - Saudi Aramco signed Memorandum of Understanding
  • 2017 - Rosneft and Pertamina sign JV agreement
  • 2019 - Tecnicas Reunidas selected for FEED

Other Information

-

Links

  1. Committee for Acceleration of Priority Infrastructure Delivery

COOPERATION PERTAMINA - Sinopec

  1. Saudi Aramco Memorandum of Understanding signed with PT Pertamina
  2. Rosneft and Pertamina set up a Joint Venture for the development of Tuban Grass Root Refinery (TGRR) project
  3. Rosneft and Pertamina JV Sign Tuban Refinery Design Contract
  4. Basic Engineering Design and FEED for Tuban Project