Tuban East Java Refinery Project

From A Barrel Full
Revision as of 07:43, 20 March 2020 by Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: Pertamina & Sinopec Website: http://www.pertamina.com/ Wiki Page: Tuban East Java Refinery Location: Tuban, East Java, Indonesia Capacity: 15.0...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information Ownership: Pertamina & Sinopec Website: http://www.pertamina.com/ Wiki Page: Tuban East Java Refinery Location: Tuban, East Java, Indonesia Capacity: 15.0 million tons/annum & 300,000 bbl/day Nelson Complexity: Project Stage: Planned Expected Completion: Budget: The Project Project Type: Green field refinery and petrochemicals plant Project Summary: The planned refining capacity is 15 mmpta (300 kbpd) and the targeted capacity of the petrochemical complex is over 1 mmtpa of ethylene and 1.3 mmtpa of aromatics. Main Contractors Refining Units - Terminal Capacity Crude Oil: Refined Products: === Crude Supply The feedstock for TGRR will be medium and heavy sulfur crude oil grades The crude oil terminal will be able to accommodate VLCCs of up to 300 thousand tonnes. === Products Produced - === History 2005 - Sinopec & Pertamina sign an MOU 2012 - Saudi Aramco signed Memorandum of Understanding 2017 - Rosneft and Pertamina sign JV agreement === Other Information -

Links

  1. COOPERATION PERTAMINA - Sinopec
  2. Saudi Aramco Memorandum of Understanding signed with PT Pertamina
  3. Rosneft and Pertamina set up a Joint Venture for the development of Tuban Grass Root Refinery (TGRR) project
  4. Rosneft and Pertamina JV Sign Tuban Refinery Design Contract