Difference between revisions of "Tuban East Java Refinery Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 25: | Line 25: | ||
- | - | ||
=== History === | === History === | ||
− | 2005 - Sinopec & Pertamina sign an MOU | + | * 2005 - Sinopec & Pertamina sign an MOU |
− | 2012 - Saudi Aramco signed Memorandum of Understanding | + | * 2012 - Saudi Aramco signed Memorandum of Understanding |
− | 2017 - Rosneft and Pertamina sign JV agreement | + | * 2017 - Rosneft and Pertamina sign JV agreement |
+ | * 2019 - Tecnicas Reunidas selected for FEED | ||
+ | |||
=== Other Information === | === Other Information === | ||
- | - |
Revision as of 08:47, 20 March 2020
Contents
Summary Information
- Ownership: Rosneft 45% and Pertamina 55%
- Website: http://www.pertamina.com/
- Wiki Page: Tuban East Java Refinery
- Location: Tuban, East Java, Indonesia
- Capacity: 15.0 million tons/annum & 300,000 bbl/day
- Nelson Complexity: 13.1
- Project Stage: Planned
- Expected Completion:
- Budget:
The Project
- Project Type: Green field refinery and petrochemicals plant
- Project Summary: The planned refining capacity is 15 mmpta (300 kbpd) and the targeted capacity of the petrochemical complex is over 1 mmtpa of ethylene and 1.3 mmtpa of aromatics.
- Main Contractors
- Tecnicas Reunidas: Basic Engineering Design (BED) and the Front-End Engineering Design (FEED)
Refining Units
- Atmospheric Distillation
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- The feedstock for TGRR will be medium and heavy sulfur crude oil grades
- The crude oil terminal will be able to accommodate VLCCs of up to 300 thousand tonnes.
Products Produced
-
History
- 2005 - Sinopec & Pertamina sign an MOU
- 2012 - Saudi Aramco signed Memorandum of Understanding
- 2017 - Rosneft and Pertamina sign JV agreement
- 2019 - Tecnicas Reunidas selected for FEED
Other Information
-