Difference between revisions of "Tuban East Java Refinery Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: Pertamina & Sinopec Website: http://www.pertamina.com/ Wiki Page: Tuban East Java Refinery Location: Tuban, East Java, Indonesia Capacity: 15.0...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | Ownership: Pertamina | + | * Ownership: Rosneft 45% and Pertamina 55% |
− | Website: http://www.pertamina.com/ | + | * Website: http://www.pertamina.com/ |
− | Wiki Page: Tuban East Java Refinery | + | * Wiki Page: [[Tuban East Java Refinery]] |
− | Location: Tuban, East Java, Indonesia | + | * Location: Tuban, East Java, Indonesia |
− | Capacity: 15.0 million tons/annum & 300,000 bbl/day | + | * Capacity: 15.0 million tons/annum & 300,000 bbl/day |
− | Nelson Complexity: | + | * Nelson Complexity: 13.1 |
− | Project Stage: Planned | + | * Project Stage: Planned |
− | Expected Completion: | + | * Expected Completion: |
− | Budget: | + | * Budget: |
− | The Project | + | === The Project === |
− | Project Type: Green field refinery and petrochemicals plant | + | * Project Type: Green field refinery and petrochemicals plant |
− | Project Summary: The planned refining capacity is 15 mmpta (300 kbpd) and the targeted capacity of the petrochemical complex is over 1 mmtpa of ethylene and 1.3 mmtpa of aromatics. | + | * Project Summary: The planned refining capacity is 15 mmpta (300 kbpd) and the targeted capacity of the petrochemical complex is over 1 mmtpa of ethylene and 1.3 mmtpa of aromatics. |
− | Main Contractors | + | * Main Contractors |
− | Refining Units | + | ** Tecnicas Reunidas: Basic Engineering Design (BED) and the Front-End Engineering Design (FEED) |
+ | === Refining Units === | ||
+ | * Atmospheric Distillation | ||
+ | === Terminal Capacity === | ||
+ | * Crude Oil: | ||
+ | * Refined Products: | ||
+ | === Crude Supply === | ||
+ | * The feedstock for TGRR will be medium and heavy sulfur crude oil grades | ||
+ | * The crude oil terminal will be able to accommodate VLCCs of up to 300 thousand tonnes. | ||
+ | === Products Produced === | ||
- | - | ||
− | + | === History === | |
− | |||
− | |||
− | === | ||
− | |||
− | |||
− | === | ||
− | |||
− | |||
2005 - Sinopec & Pertamina sign an MOU | 2005 - Sinopec & Pertamina sign an MOU | ||
2012 - Saudi Aramco signed Memorandum of Understanding | 2012 - Saudi Aramco signed Memorandum of Understanding | ||
2017 - Rosneft and Pertamina sign JV agreement | 2017 - Rosneft and Pertamina sign JV agreement | ||
− | === Other Information | + | === Other Information === |
- | - | ||
=== Links === | === Links === |
Revision as of 08:46, 20 March 2020
Contents
Summary Information
- Ownership: Rosneft 45% and Pertamina 55%
- Website: http://www.pertamina.com/
- Wiki Page: Tuban East Java Refinery
- Location: Tuban, East Java, Indonesia
- Capacity: 15.0 million tons/annum & 300,000 bbl/day
- Nelson Complexity: 13.1
- Project Stage: Planned
- Expected Completion:
- Budget:
The Project
- Project Type: Green field refinery and petrochemicals plant
- Project Summary: The planned refining capacity is 15 mmpta (300 kbpd) and the targeted capacity of the petrochemical complex is over 1 mmtpa of ethylene and 1.3 mmtpa of aromatics.
- Main Contractors
- Tecnicas Reunidas: Basic Engineering Design (BED) and the Front-End Engineering Design (FEED)
Refining Units
- Atmospheric Distillation
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- The feedstock for TGRR will be medium and heavy sulfur crude oil grades
- The crude oil terminal will be able to accommodate VLCCs of up to 300 thousand tonnes.
Products Produced
-
History
2005 - Sinopec & Pertamina sign an MOU 2012 - Saudi Aramco signed Memorandum of Understanding 2017 - Rosneft and Pertamina sign JV agreement