Trans Québec and Maritimes Pipeline (TQM)

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Source: Saint-Lazare
  • Destination: Saint-Nicolas
  • Ownership: TransCanada
  • Website: https://www.tcenergy.com/
  • Length: 573 kilometres (403 miles)
  • Capacity: per day
  • Status: Operating

Details

  • The 649 km (403 miles) system includes 37 delivery points and four compressor stations and is interconnected to two storage sites and two renewable natural gas receipts. The system transports natural gas from an interconnect with TC Energy’s Transcanada Canadian Mainline Gas Pipeline at Les Cèdres, Québec to a point near Québec City, in the municipality of Lévis on the south shore of the St. Lawrence River. Additionally, the system extends from Terrebonne, north of Montreal, to East Hereford, Québec on the border with New Hampshire, where it interconnects with the Portland Natural Gas Transmission System (PNGTS).

History

  • 1982 - The pipeline entered operation

Other Information

  • -

Links

  1. Trans Québec and Maritimes Pipeline (TQM) - TC Energy